- Number: US 2026/0202810 A1
- Document ID: US20260202810A1
- Status: Published application
- Kind: A1
- Application number: 19/564,245
- Filed: 2026-03-12
- Published: 2026-07-16
- Earliest claimed: 2023-09-14
- Assignees: TRUMPF Werkzeugmaschinen GmbH + Co. KG
- Applicants: TRUMPF Werkzeugmaschinen SE + Co. KG
- Inventors: Simon Ockenfuss
- Web page: https://patentgrep.com/patent/US20260202810A1

## CPC

- G05B 19/0405: {Program-control specially adapted for machine tool control and not otherwise provided for}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 2219/25294: Part, workpiece, code, tool identification
- G05B 2219/32252: Scheduling production, machining, job shop
- G05B 2219/32423: Task planning
- G05B 2219/35162: Determine workpiece placement, nesting in blank, optimize, minimize loss material
- G05B 2219/49366: Machine several small pieces on one sheet, break off pieces
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method for producing a plurality of workpieces using a machine tool configured to produce the plurality of workpieces from a number of material sheets, the method including specifying a production sequence for producing the plurality of workpieces using the machine tool from the material sheets. The specified production sequence includes a first, second, and third production process having a first, second, and third number of production steps, respectively, for producing a respective first, second, and third number of the plurality of workpieces, and a first, second, and third sorting process respectively including removing and depositing the first, second, and third respective number of the plurality of workpieces produced by the respective first, second, and third production process. The depositing of the first, second, and third number of the plurality of workpieces is configured to be carried out at least partially simultaneously with a subsequent production process.

## Claims

### Claim 1

A method for producing a plurality of workpieces using a machine tool configured to produce the plurality of workpieces from a number of material sheets, the method comprising:
a) specifying a production sequence for producing the plurality of workpieces using the machine tool from the material sheets, the specified production sequence including:
a first production process having a first number of production steps for producing a first number of the plurality of workpieces,
a first sorting process comprising removing and depositing the first number of the plurality of workpieces produced by the first production process, wherein the depositing of the first number of the plurality of workpieces is configured to be carried out at least partially simultaneously with a first subsequent production process,
a second production process having a second number of production steps for producing a second number of the plurality of workpieces,
a second sorting process comprising removing and depositing the second number of the plurality of workpieces produced by the second production process, wherein the depositing of the second number of the plurality of workpieces is configured to be carried out at least partially simultaneously with a second subsequent production process,
a third production process having a third number of production steps for producing a third number of the plurality of workpieces, and
a third sorting process comprising removing and depositing the third number of the plurality of workpieces produced by the third production process, wherein the depositing of the third number of the plurality of workpieces is configured to be carried out at least partially simultaneously with a third subsequent production process,
wherein each production process which follows one of the first, second, and third sorting processes in the production sequence is carried out at least partially simultaneously with the depositing in a preceding one of the first, second, and third sorting processes in the production sequence;
b) determining a process duration for depositing the first number of the plurality of workpieces;
c) determining a process duration of the second production process;
d) based on a determination that the determined process duration of step b) is longer than the determined process duration of step c): adapting the production sequence for the purpose of reducing a production duration of the plurality of workpieces and/or for the purpose of utilizing a waiting period during which no production step of the specified production sequence can be carried out and which occurs as a result of depositing the produced first number of the plurality of workpieces; and
e) producing the plurality of workpieces by carrying out the production sequence using the machine tool.

### Claim 2 (depends on 1)

The method according to claim 1,
wherein the adapting of the production sequence of step d) includes:
d1) shifting a number of production steps from the first production process and/or shifting a number of production steps from the third production process to the second production process,
wherein a value of a process duration of the number of production steps shifted in step d1) is greater than or equal to a value of a difference calculated by subtracting the process duration determined in step c) from the process duration determined in step b).

### Claim 3 (depends on 1)

The method according to claim 1,
wherein the machine tool has a first removal apparatus and a second removal apparatus,
wherein the production sequence provides for the first sorting process and the second sorting process to be carried out by the first removal apparatus,
wherein the production sequence provides for the third sorting process to be carried out by the second removal apparatus,
wherein a production step of the second production process brings about a separating of the second number of the plurality of workpieces from the material sheet by the machine tool,
wherein the adapting of the production sequence of step d) includes:
d2) shifting the production step of the second production process, which brings about the separating of the second number of the plurality of workpieces from the material sheet, and the second sorting process after the third sorting process.

### Claim 4 (depends on 1)

The method according to claim 1,
wherein the production steps of the first production process bring about the production of the first number of the plurality of workpieces from a first material sheet based on a first sheet layout,
wherein the removal in the first sorting process comprises removal of the first material sheet in the form of a first scrap skeleton together with the first number of the plurality of workpieces produced,
wherein the production steps of the second production process bring about the production of the second number of the plurality of workpieces from a second material sheet based on a second sheet layout,
wherein the removal of the second sorting process comprises removal of the second material sheet in the form of a second scrap skeleton together with the produced second number of the plurality of workpieces,
wherein the production steps of the third production process bring about the production of the third number of the plurality of workpieces from a third material sheet based on a third sheet layout,
wherein the removal of the third sorting process comprises removal of the third material sheet in the form of a third scrap skeleton together with the produced third number of the plurality of workpieces,
wherein the process duration of step b) additionally comprises depositing the first scrap skeleton.

### Claim 5 (depends on 4)

The method according to claim 4,
wherein the adapting of the production sequence of step d) includes:
d3) shifting the first production process and the first sorting process after the second sorting process, based on a value of a determined production duration of the plurality of workpieces by the production sequence before the shifting of the first production process and the first sorting process being greater than a value of a determined production duration of the plurality of workpieces by the production sequence after the shifting of the first production process and the first sorting process; or
d4) shifting the third production process and the third sorting process after the first sorting process, based on the value of the determined production duration of the plurality of workpieces by means of the production sequence before the shifting of the first production process and the first sorting process being greater than a value of a determined production duration of the plurality of workpieces by the production sequence after the shifting of the third production process and the third sorting process.

### Claim 6 (depends on 4)

The method according to claim 4,
wherein the adapting of the production sequence of step d) includes:
d5) changing the first sheet layout, the second sheet layout and/or the third sheet layout, based on a value of a determined production duration of the plurality of workpieces by the production sequence before the changing the first sheet layout, the second sheet layout and/or the third sheet layout being greater than a value of a determined production duration of the plurality of workpieces by the production sequence after the changing of the first sheet layout, the second sheet layout and/or the third sheet layout.

### Claim 7 (depends on 4)

The method according to claim 4,
wherein the adapting of the production sequence of step d) includes:
d6) adapting the production steps of the first production process such that the production steps of the first production process bring about a production of at least two adjacent workpieces in the first sheet layout with at least one nanojoint and/or microjoint configured for jointly depositing the adjacent workpieces.

### Claim 8 (depends on 1)

The method according to claim 1,
wherein the adapting of the production sequence of step d) includes:
d7) changing a process parameter of at least one production step of the second production process to increase the process duration of the second production process.

### Claim 9 (depends on 1)

The method according to claim 1,
wherein the adapting of the production sequence of step d) includes:
d8) inserting an energy-saving process before or after the second production process to bring about an energy-saving mode of at least one device of the machine tool that is not required for depositing the first number of the plurality of workpieces,
wherein the process duration of the energy-saving process is equal to a difference calculated by subtracting the process duration determined in step c) from the process duration determined in step b).

### Claim 10 (depends on 1)

A non-transitory computer-readable medium having processor-executable instructions stored thereon, wherein the processor-executable instructions, when executed by one or more processors, facilitate performance of the method of claim 1.

### Claim 11 (depends on 1)

A data processing device configured to carry out the method according to claim 1.

### Claim 12 (depends on 1)

A machine tool
configured to carry out the method according to claim 1.

### Claim 13 (depends on 1)

A production system, comprising:
a production controller configured to carry out the method according to claim 1; and
a machine tool configured to produce a plurality of workpieces from the number of material sheets.