Method for assembling a formwork unit
AssigneeDoka GmbH
InventorsJohannes KIRCHHOFER, Markus HÖLLMÜLLER, Thomas PALLINGER
Life of this patent
Estimating the term…
Abstract
Method for assembling a formwork unit, in particular a wall formwork unit, comprising the steps: a. prefabricating the formwork unit in a prefabrication area by—providing a first formwork element, —providing a second formwork element,—attaching a reinforcement between the first and the second formwork element,—connecting the first to the second formwork element in order to obtain the formwork unit, b. Transporting, in particular lifting, the formwork unit together with the reinforcement from the prefabrication area to a site of operation.
Claims20
A method for assembling a formwork unit, comprising the steps of:
- a. prefabricating the formwork unit in a prefabrication area by
- providing a first formwork element,
- providing a second formwork element,
- attaching a reinforcement between the first and the second formwork element, and
- connecting the first formwork element to the second formwork element in order to obtain the formwork unit, and
- b. transporting the formwork unit together with the reinforcement from the prefabrication area to a site of operation.
A prefabricated formwork device, comprising:
- a formwork unit with a first formwork element and a second formwork element,
- a formwork connection element, which connects the first formwork element to the second formwork element, so that an interstice for filling with concrete is formed between the first formwork element and the second formwork element,
- a reinforcement, and
- a suspension for the reinforcement in the interstice between the first formwork element and the second formwork element, so that the prefabricated formwork device, including the reinforcement, can be transported from a prefabrication area to a site of operation.
Dependencies are inferred from the claim text.