# US 2026/0193976 A1 · Method and system for cementing simulation and gas-water back-invasion evaluation in complex formations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0193976 A1
- Document ID: US20260193976A1
- Status: Published application
- Kind: A1
- Application number: 19/442,954
- Filed: 2026-01-07
- Published: 2026-07-09
- Earliest claimed: 2025-01-08
- Assignees: Chengdu University of Technology
- Applicants: Chengdu University of Technology
- Inventors: Mingming ZHENG; Yuxi DENG; Zurui WU; Yawei ZHANG; Hui DENG; Jun ZHAO; Fei WANG; Shichun YAN; Kesai LI; Yichen DU
- Web page: https://patentgrep.com/patent/US20260193976A1

## CPC

- E21B 47/005: Monitoring or checking of cementation quality or level
- G01N 19/04: Measuring adhesive force between materials, e.g. of sealing tape, of coating
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)

## Abstract

The present disclosure discloses a method and system for cementing simulation and gas-water back-invasion evaluation in complex formations, and relates to oil and natural gas extraction technologies. The evaluation system is provided with a simulated formation, a buffer space, a cement ring and a casing, and a movable bottom plate; two groups of hydraulic cylinders are provided below the movable bottom plate to test a shear force of a secondary interface and a compressive strength of the cement ring, respectively; the casing has a casing cavity and a cement return hole, and the cement ring is formed after cement returns and solidifies; and sonic logging probes and a gas detection device are provided within a reaction vessel. The evaluation method adopts the evaluation system described above for evaluation.

## Claims

### Claim 1

A system for cementing simulation and gas-water back-invasion evaluation in complex formations, comprising a reaction vessel, wherein a simulated formation (9) is provided within a vessel body (23), a buffer space (13) is provided between the simulated formation (9) and an inner wall of the vessel body (23), and a cement ring (10) and a casing (15) are provided in sequence within the simulated formation (9), the three being concentric circular ring columns; a movable bottom plate (25) is provided within the vessel body (23), a vessel cover (19) and the movable bottom plate (25) seal upper and lower ends of the vessel body (23), respectively, and the movable bottom plate (25) supports the simulated formation (9), the cement ring (10) and the casing (15); an upper end of the casing (15) is in sealed connection with the vessel cover (19), and a lower end of the casing (15) is in sealed connection with the movable bottom plate (25);
two groups of hydraulic cylinders (6) are provided below the movable bottom plate (25), a first group of hydraulic cylinders (601) is placed below the simulated formation (9), and a second group of hydraulic cylinders (602) is placed below the cement ring (10);
the casing (15) has a casing cavity (24), a cement return hole (27) is provided at a lower portion of the casing (15), and the cement return hole (27) is in communication with a cementing annulus where the cement ring (10) is located;
sonic logging probes (16) are provided within the reaction vessel;
a gas detection device is provided within the reaction vessel, and the gas detection device comprises probes for detecting temperature and/or pressure that are distributed in the cement ring, the simulated formation and the buffer space;
the buffer space (13), the casing cavity (24), the cementing annulus and the simulated formation are all provided with tubes;
a casing body of the casing (15) has a sandwich, the sonic logging probes (16) are uniformly embedded and distributed within a casing body sandwich of the casing (15), a sonic logging data line (18) is in signal connection with the sonic logging probes (16), and the sonic logging data line (18) is placed outside a sandwich of the casing (15); and
an inner wall of the casing (15) is provided with a pressure relief hole (26) at one end close to the vessel cover (19), and the pressure relief hole (26) communicates the sandwich of the casing (15) with the casing cavity (24) of the casing (15).

### Claim 2 (depends on 1)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 1, wherein the probes for detecting temperature and/or pressure are one temperature probe (801), five temperature pressure probes (802) and one pressure probe (803), the temperature probe (801) is provided within the cement ring, the five temperature pressure probes (802) are provided side by side in the simulated formation (9), and the pressure probe (803) is provided in the buffer space (13).

### Claim 3 (depends on 1)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 1, wherein a visualization imaging device is provided within the reaction vessel, the visualization imaging device comprises a glass tube and an imaging probe (12) for imaging a secondary interface (30), two ends of the glass tube (11) are opened, and the glass tube (11) penetrates through the buffer space (13) and the simulated formation (9), so that an inner port of the glass tube (11) directly faces the secondary interface (30), and an outer port of the glass tube extends onto the vessel body (23) to be in sealed connection with the vessel body (23); and the imaging probe (12) is mounted within the glass tube (11).

### Claim 4 (depends on 1)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 1, wherein the movable bottom plate (25) comprises a movable upper plate (2501), a movable lower plate (2502) and a central plate (2503) which are provided in an embedded manner, the movable upper plate (2501), the movable lower plate (2502) and the central plate (2503) are combined to form a bottom of the closed vessel body (23), and a connecting position of the movable upper plate (2501), the movable lower plate (2502) and the central plate (2503) is filled with a sealed rubber gasket (2504).

### Claim 5 (depends on 4)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 4, wherein each group of hydraulic cylinders comprises two hydraulic cylinders, the first group of hydraulic cylinders (601) is placed below the simulated formation (9) with the secondary interface (30) as a boundary, and two hydraulic cylinders in the first group of hydraulic cylinders (601) are distributed on left and right sides of a lower end of the simulated formation (9); and the second group of hydraulic cylinders (602) is placed below the cement ring (10) with a primary interface (29) and the secondary interface (30) as boundaries, and two hydraulic cylinders in the second group of hydraulic cylinders (602) are distributed on left and right sides of a lower end of the cement ring (10).

### Claim 6 (depends on 1)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 1, wherein an inner side wall of the simulated formation (9) is provided with a water-soluble film (22), and an outer side wall of the simulated formation (9) is provided with a sand-barrier mesh.

### Claim 7 (depends on 6)

The system for cementing simulation and gas-water back-invasion evaluation in complex formations according to claim 6, wherein a rotating shaft (1) is mounted on the vessel body (23), and the rotating shaft (1) is used for being connected with a rotating device, thereby realizing rotation of the vessel body.

### Claim 8 (depends on 1)

A method for cementing simulation and gas-water back-invasion evaluation in complex formations adopting the system according to claim 1, comprising the following steps:
(1) Preparation Phase:
the simulated formation is prepared in the reaction vessel, and the gas detection device and the visualization imaging device are mounted; the water-soluble film and the sand-barrier mesh are provided;
a porosity of the simulated formation is adjusted until a difference between the porosity of the simulated formation and an “average value of a porosity of a target formation” the average value of the porosity of the target formation is <10%;
an outside of the casing is coated with petroleum jelly and wrapped with a plastic film, the casing is then mounted on the vessel cover, and the reaction vessel is resealed;
water bath temperature control is performed on the vessel body until temperature of the simulated formation reaches temperature of the target formation;
(2) Hydrate Generation Phase:
methane and pore water are injected into the simulated formation, the reaction vessel is rotated to make distribution of the pore water uniform, and water bath temperature conditions outside the vessel body are kept unchanged until a hydrate is generated;
(3) Cementing Phase:
after well washing, cement slurry is injected into the casing, the reaction vessel is closed, and the cement slurry is pushed to return back;
pressure of the cement slurry is made higher than pressure of the buffer space by a manner of injecting nitrogen into the simulated formation, and the pressure is maintained until the cement slurry solidifies; and
(4) Obtaining of Experimental Data:
the temperature and pressure within the reaction vessel are obtained through the temperature and/or pressure probes;
the secondary interface is observed through the imaging probe;
after the cement slurry solidifies, the sonic logging probes are started to emit sonic waves, and a receiver obtains the sonic waves; then, the first group of hydraulic cylinders is started twice to lift the simulated formation, pressure changes of the first group of hydraulic cylinders are recorded twice, two shear strengths are calculated by the pressure changes, and a difference of the two shear strengths is obtained as a shear strength of the secondary interface; and finally, the second group of hydraulic cylinders is started to compress the cement ring, and pressure changes of the second group of hydraulic cylinders are recorded as a compressive strength of the cement ring.