# US 2026/0189514 A1 · Apparatus and method for time-deterministic packet forwarding using non-work conserving stateless core fair queuing method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0189514 A1
- Document ID: US20260189514A1
- Status: Published application
- Kind: A1
- Application number: 19/392,814
- Filed: 2025-11-18
- Published: 2026-07-02
- Earliest claimed: 2024-11-19
- Assignees: Electronics and Telecommunications Research Institute
- Applicants: Electronics and Telecommunications Research Institute
- Inventors: Yeon Cheol RYOO; Jeong Dong RYOO; Tae Sik CHEUNG; Jinoo JOUNG
- Web page: https://patentgrep.com/patent/US20260189514A1

## CPC

- H04L 47/629: Ensuring fair share of resources, e.g. weighted fair queuing [WFQ]
- H04L 47/28: in relation to timing considerations
- H04L 47/56: implementing delay-aware scheduling
- H04L 47/6275: based on priority
- H04L 47/805: {QOS or priority aware}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

The present disclosure relates generally to time-deterministic packet forwarding technology, and more particularly, to an apparatus and method for time-deterministic packet forwarding using a non-work-conserving stateless core fair queuing method in a network. The method includes comparing the reception time of the packet with the finish time of the previous packet when receiving the packet, setting the larger value as the eligible time of the packet, and calculating the finish time of the packet by adding the value obtained by dividing the packet size by the set transmission rate to the eligible time. The method includes arranging packets with an earlier eligible time in a first priority queue in order of their earliest eligible time and restricting an output of the packets before the eligible time in a non-work-conserving manner, arranging packets whose eligible time has passed in a second priority queue in order of their earliest finish time, and outputting the packet in a work-conserving manner when there is no other packet to be served in the second priority

## Claims

### Claim 1

A non-work-conserving stateless core fair queuing method for providing an on-time service that guarantees end-to-end maximum and minimum delays in a network, the non-work-conserving stateless core fair queuing method comprising:
when receiving a packet, comparing a reception time of the packet with a finish time of a previous packet to set a larger value as an eligible time of the packet;
calculating a finish time of the packet by adding a value obtained by dividing a size of the packet by a set transmission rate to the eligible time;
arranging packets with an earlier eligible time in a first priority queue in order of their earliest eligible time and restricting an output of the packets before the eligible time in a non-work-conserving manner;
arranging packets whose eligible time has passed in a second priority queue in order of their earliest finish time; and
outputting the packet in a work-conserving manner when there is no other packet to be served in the second priority queue.

### Claim 2 (depends on 1)

The non-work-conserving stateless core fair queuing method of claim 1, further comprising, managing a finish time of a last packet for each flow at an input node; and transmitting an eligible time and a finish time of a next node calculated at the input node, and a service transmission rate or a delay parameter obtained by dividing the size of the packet by the service transmission rate which are included in a packet header so that subsequent core nodes operate without state management for each flow.

### Claim 3 (depends on 1)

The non-work-conserving stateless core fair queuing method of claim 1, further comprising, calculating, at the input node, the eligible time and the finish time of the next node in advance and forwarding the eligible time and the finish time as metadata in the packet header, operating the core nodes based on the eligible time and finish time of the metadata, and updating and forwarding an eligible time and a finish time for the next node.

### Claim 4 (depends on 1)

The non-work-conserving stateless core fair queuing method of claim 1, further comprising, since the end-to-end maximum and minimum delays and jitter are determined based on a link delay and a service transmission rate of the end-to-end path according to a predetermined formula, when a new flow is requested, calculating a path and a transmission rate that satisfy requirements, and performing admission control based only on whether a sum of transmission rates of flows configured for each port on the path exceeds a maximum transmission rate of the port.

### Claim 5

A non-work-conserving stateless core process queuing apparatus for providing an on-time service that guarantees end-to-end maximum and minimum delays in a network, the non-work-conserving stateless core process queuing apparatus comprising:
a transceiver; and
a processor operatively connected to the transceiver,
wherein the processor is configured to, when receiving a packet, compare a reception time of the packet with a finish time of a previous packet to set a larger value as an eligible time of the packet,
calculate a finish time of the packet by adding a value obtained by dividing a size of the packet by a set transmission rate to the eligible time,
arrange packets with an earlier eligible time in a first priority queue in order of their earliest eligible time and restrict an output of the packets before the eligible time in a non-work-conserving manner,
arrange packets whose eligible time has passed in a second priority queue in order of their earliest finish time, and
output the packet in a work-conserving manner when there is no other packet to be served in the second priority queue.

### Claim 6 (depends on 5)

The non-work-conserving stateless core fair queuing apparatus of claim 5, wherein the processor is configured to manage a finish time of a last packet for each flow at an input node, and transmit an eligible time and a finish time of a next node calculated at the input node, and a service transmission rate or a delay parameter obtained by dividing the size of the packet by the service transmission rate which are included in a packet header so that subsequent core nodes operate without state management for each flow.

### Claim 7 (depends on 5)

The non-work-conserving stateless core fair queuing apparatus of claim 5, wherein the processor is configured to calculate, at the input node, the eligible time and the finish time of the next node in advance, forward the eligible time and the finish time as metadata in the packet header, operate the core nodes based on the eligible time and finish time of the metadata, and update and forward an eligible time and a finish time for the next node.

### Claim 8 (depends on 5)

The non-work-conserving stateless core fair queuing apparatus of claim 5, wherein, since the end-to-end maximum and minimum delays and jitter are determined based on a link delay and a service transmission rate of the end-to-end path according to a predetermined formula, when a new flow is requested, the processor is configured to calculate a path and a transmission rate that satisfy requirements, and perform admission control based only on whether a sum of transmission rates of flows configured for each port on the path exceeds a maximum transmission rate of the port.

### Claim 9

A method of time-deterministic packet forwarding control using non-work-conserving stateless core fair queuing in a network, the method comprising:
calculating a path and a transmission rate that satisfy operator requirements when a new time-deterministic flow is requested;
confirming whether a sum of a transmission rate calculated for the new flow and transmission rates of other flows already configured on an output port of the path exceed a maximum transmission rate of the port;
approving and configuring the new flow when the sum of the transmission rates does not exceed the maximum transmission rate; and
determining end-to-end maximum and minimum delays and jitter for the configured flow according to a predetermined calculation formula.

### Claim 10 (depends on 9)

The method of claim 9, comprising calculating the end-to-end maximum delay as a value obtained by adding a value obtained by dividing a difference between a burst size of the flow and a maximum packet size by a transmission rate, a value obtained by dividing a maximum packet size configured at each node on a path by a transmission rate of an output port, a value obtained by dividing a packet length by the transmission rate, and a sum of link delays; and calculating the end-to-end minimum delay as a value obtained by adding a sum of link delays on the path, a sum, up to an immediately preceding node on the path, of values obtained by dividing a maximum packet size configured at each node by the transmission rate of the output port and dividing the packet length by the transmission rate, and a value obtained by dividing a minimum packet size by a maximum transmission rate of a final node.

### Claim 11

An apparatus for time-deterministic packet forwarding control using non-work-conserving stateless core fair queuing in a network, the apparatus comprising:
a transceiver; and
a processor operatively connected to the transceiver,
wherein the processor is configured to calculate a path and a transmission rate that satisfy operator requirements when a new time-deterministic flow is requested,
confirm whether a sum of a transmission rate calculated for the new flow and transmission rates of other flows already configured on an output port of the path exceed a maximum transmission rate of the port,
approve and configure the new flow when the sum of the transmission rates does not exceed the maximum transmission rate, and
determine end-to-end maximum and minimum delays and jitter for the configured flow according to a predetermined calculation formula.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein the processor is configured to calculate the end-to-end maximum delay as a value obtained by adding a value obtained by dividing a difference between a burst size of the flow and a maximum packet size by a transmission rate, a value obtained by dividing a maximum packet size configured at each node on a path by a transmission rate of an output port, a value obtained by dividing a packet length by the transmission rate, and a sum of link delays; and calculate the end-to-end minimum delay as a value obtained by adding a sum of link delays on the path, a sum, up to an immediately preceding node on the path, of values obtained by dividing a maximum packet size configured at each node by the transmission rate of the output port and dividing the packet length by the transmission rate, and a value obtained by dividing a minimum packet size by a maximum transmission rate of a final node.
