# US 2026/0188622 A1 · Controlling gas flows in processing tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0188622 A1
- Document ID: US20260188622A1
- Status: Published application
- Kind: A1
- Application number: 19/127,661
- Filed: 2023-11-02
- Published: 2026-07-02
- Earliest claimed: 2022-12-12
- Assignees: Lam Research Corporation
- Applicants: Lam Research Corporation
- Inventors: Michael Philip ROBERTS; Gopinath BHIMARASETTI; John Michael WILTSE; Adam FISHER; William SCHLOSSER; Steven Payonk LETOURNEAU; Nathaniel Elba RICHEY; Hyeongeu KIM; Andrew Kenichi DUVALL; Tongtong GUO; Michael William HOBERNICHT
- Web page: https://patentgrep.com/patent/US20260188622A1

## CPC

- H01J 37/3244: {Gas supply means}
- H01J 37/32449: {Gas control, e.g. control of the gas flow}
- H01J 37/32357: {Generation remote from the workpiece, e.g. down-stream}
- H01J 37/32807: {Construction (includes replacing parts of the apparatus)}
- H01J 37/32862: {In situ cleaning of vessels and/or internal parts}
- H01J 2237/335: Cleaning
- H01J: ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS (spark-gaps H01T; electric arc lamps H05B31/00; particle accelerators H05H)

## Abstract

One example provides a processing tool comprising a processing chamber and a remote plasma generator (RPG) fluidly connected to the processing chamber. The processing tool further comprises an RPG gas supply system for mixing and delivering gases to the RPG. The RPG gas supply system comprises a first RPG gas supply line for delivering a first gas at a first, lower flow rate to the RPG, a second RPG gas supply line for delivering a second gas at a second, higher flow rate to the RPG, a junction connecting the first RPG gas supply line and the second RPG gas supply line, an orifice in the first RPG gas supply line, a divert valve on the second RPG gas supply line for diverting the flow away from the RPG and a common RPG gas supply line connecting the junction to the RPG.

## Claims

### Claim 1

A processing tool, comprising:
a processing chamber;
a remote plasma generator (RPG) fluidly connected to the processing chamber; and
an RPG gas supply system for mixing and delivering gases to the RPG, the RPG gas supply system comprising:
a first RPG gas line for delivering a first gas at a first flow rate to the RPG;
a second RPG gas line for delivering a second gas at a second flow rate to the RPG, the second flow rate higher than the first flow rate;
a junction connecting the first RPG gas line and the second RPG gas line;
an orifice in the first RPG gas line;
a divert valve on the second RPG gas line for diverting a flow away from the RPG; and
a common RPG gas line connecting the junction to the RPG.

### Claim 2 (depends on 1)

The processing tool of claim 1, wherein the second RPG gas line comprises a mass flow controller upstream of the junction connecting the first RPG gas line and the second RPG gas line.

### Claim 3 (depends on 1)

The processing tool of claim 1, wherein the first RPG gas line is connected to a hydrogen gas source and a nitrogen gas source.

### Claim 4 (depends on 1)

The processing tool of claim 1, wherein the second RPG gas line is connected to a nitrogen gas source.

### Claim 5 (depends on 1)

The processing tool of claim 1, wherein the processing chamber comprises a showerhead and a pedestal, and the showerhead comprises a showerhead purge gas outlet disposed adjacent to a perimeter of the showerhead.

### Claim 6 (depends on 5)

The processing tool of claim 5, further comprising a controller configured to control a flow of inert gas through the showerhead purge gas outlet during a deposition process.

### Claim 7 (depends on 6)

The processing tool of claim 6, further comprising
a pedestal, and
a below-pedestal purge system comprising one or more openings to flow a purge gas into the processing chamber beneath the pedestal.

### Claim 8 (depends on 7)

The processing tool of claim 7, further comprising a controller configured to control a flow of inert gas through the below-pedestal purge system during a deposition process.

### Claim 9 (depends on 1)

The processing tool of claim 1, wherein the processing tool comprises a flow over vapor (FOV) chemical supply system for delivering a processing chemical to the processing chamber, the FOV chemical supply system comprising a processing chemical delivery gas line comprising an inner diameter in a range of 0.110-0.430 inch.

### Claim 10

A processing tool, comprising:
a processing chamber comprising a pedestal well;
a pedestal positioned at least partially within the pedestal well; and
a below-pedestal purge system configured to introduce a flow of a purge gas into the pedestal well beneath the pedestal.

### Claim 11 (depends on 10)

The processing tool of claim 10, wherein the below-pedestal purge system comprises a below-pedestal plenum arranged at least partially around a pedestal support of the pedestal, the below-pedestal plenum comprising one or more openings to flow the purge gas into the processing chamber from beneath the pedestal.

### Claim 12 (depends on 11)

The processing tool of claim 11, wherein the below-pedestal plenum is annular in shape.

### Claim 13 (depends on 11)

The processing tool of claim 11, wherein the below-pedestal plenum comprises a plurality of openings.

### Claim 14 (depends on 11)

The processing tool of claim 11, wherein the below-pedestal plenum is additively manufactured.

### Claim 15 (depends on 10)

The processing tool of claim 10, further comprising a showerhead, the showerhead comprising a showerhead purge gas outlet.

### Claim 16

A method of modifying a processing tool, the processing tool comprising a processing chamber and a flow over vapor (FOV) chemical supply system for delivering a processing chemical to the processing chamber, the FOV chemical supply system comprising a gas line for processing chemical delivery to the processing chamber, the method comprising:
replacing an initial gas line with a replacement gas line, the replacement gas line comprising a smaller inner diameter than the initial gas line, thereby decreasing a time that elapses between opening a FOV chemical supply system valve and FOV chemical reaching the processing chamber, and
replacing at least one other FOV chemical supply system component to reduce a dead volume in the FOV chemical supply system.

### Claim 17 (depends on 16)

The method of claim 16, wherein the initial gas line comprises an inner diameter of greater than or equal to 0.305 inch, and the replacement gas line comprises an inner diameter in the range of 0.110-0.430 inch.

### Claim 18 (depends on 16)

The method of claim 16, wherein replacing at least one other FOV chemical supply system component comprises shortening a valve connection.

### Claim 19 (depends on 16)

The method of claim 16, wherein replacing at least one other FOV chemical supply system component comprises removing a charge volume hardware.

### Claim 20 (depends on 16)

The method of claim 16, wherein replacing at least one other FOV chemical supply system component comprises replacing a first valve manifold with a second valve manifold with a reduced dead volume.
