# US 2026/0185830 A1 · Current topography data creation system for work site and current topography data creation method for work site

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0185830 A1
- Document ID: US20260185830A1
- Status: Published application
- Kind: A1
- Application number: 19/127,125
- Filed: 2023-11-08
- Published: 2026-07-02
- Earliest claimed: 2022-11-11
- Assignees: Komatsu Ltd.
- Applicants: Komatsu Ltd.
- Inventors: Masataka OZAKI; Yoshihiro TAGAWA; Ryota OZAKI
- Web page: https://patentgrep.com/patent/US20260185830A1

## CPC

- G01C 15/002: {Active optical surveying means (optical plumbing G01C15/105)}
- B60W 40/02: related to ambient conditions
- E02F 9/20: Drives; Control devices (gearings in general F16H; controlling in general G05; electric multi-motor drives H02K, H02P)
- E02F 9/205: {Remotely operated machines, e.g. unmanned vehicles (E02F3/8866 takes precedence)}
- E02F 9/24: Safety devices {, e.g. for preventing overload (E02F9/226 takes precedence)}
- E02F 9/26: Indicating devices {(E02F5/145 takes precedence)}
- E02F 9/261: {Surveying the work-site to be treated}
- G01C 7/04: involving a vehicle which moves along the profile to be traced
- G01C 15/00: Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- B60W: CONJOINT CONTROL OF VEHICLE SUB-UNITS OF DIFFERENT TYPE OR DIFFERENT FUNCTION; CONTROL SYSTEMS SPECIALLY ADAPTED FOR HYBRID VEHICLES; ROAD VEHICLE DRIVE CONTROL SYSTEMS FOR PURPOSES NOT RELATED TO THE CONTROL OF A PARTICULAR SUB-UNIT
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A current topography data creation system for a work site includes: a current topography data reception unit that receives first current topography data of a work site detected by a three-dimensional sensor included in each of a plurality of work machines; an attribute data reception unit that receives attribute data given to the first current topography data; a current topography data creation unit that creates second current topography data of the work site based on the first current topography data; a priority storage unit that stores priority related to attribute data given to the second current topography data; and an attribute data update unit that, in a case where a plurality of pieces of attribute data of a certain point of the first current topography data is received within a predetermined time, gives attribute data to the point of the second current topography data based on the priority.

## Claims

### Claim 1

A current topography data creation system for a work site, the current topography data creation system comprising:
a hardware processor configured to:
receive first current topography data of a work site detected by a three-dimensional sensor included in each of a plurality of work machines;
receive attribute data given to the first current topography data;
create second current topography data of the work site on a basis of the first current topography data;
store priority related to attribute data given to the second current topography data; and
in a case where a plurality of pieces of attribute data of a certain point of the first current topography data is received within a predetermined time, give attribute data to the point of the second current topography data on a basis of the priority.

### Claim 2 (depends on 1)

The current topography data creation system for a work site according to claim 1,
wherein attribute data includes first attribute data and second attribute data having higher priority than the first attribute data, and
in a case where both the first attribute data and the second attribute data are received within a predetermined time, the attribute data update unit gives the second attribute data to the point of the second current topography data.

### Claim 3 (depends on 2)

The current topography data creation system for a work site according to claim 2,
wherein in a case where the first attribute data is received after a lapse of a predetermined time from a time point at which attribute data is updated last time, the attribute data update unit gives the first attribute data to the point of the second current topography data.

### Claim 4 (depends on 1)

The current topography data creation system for a work site according to claim 1,
wherein an attribute indicated by the attribute data includes an attribute related to topography of the work site and an attribute related to an obstacle that exists at the work site.

### Claim 5 (depends on 4)

The current topography data creation system for a work site according to claim 4,
wherein the attribute includes a first attribute indicating that the point is a cliff, a second attribute indicating that an obstacle exists at the point, and a third attribute indicating that the point is a cliff and an obstacle exists at the point, and
priority of the second attribute is the highest after the third attribute, and priority of the first attribute is the highest after the second attribute.

### Claim 6

A current topography data creation method for a work site, the current topography data creation method comprising:
receiving first current topography data of a work site from each of a plurality of work machines;
receiving attribute data given to the first current topography data;
creating second current topography data of the work site on a basis of the first current topography data;
storing priority related to attribute data given to the second current topography data; and
in a case where a plurality of pieces of attribute data of a certain point of the first current topography data is received within a predetermined time, giving attribute data to the point of the second current topography data on a basis of the priority.
