# US 2026/0185445 A1 · Method for controlling automatic operation of mining electric shovel considering sudden load variations during excavations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0185445 A1
- Document ID: US20260185445A1
- Status: Published application
- Kind: A1
- Application number: 18/840,914
- Filed: 2023-08-03
- Published: 2026-07-02
- Earliest claimed: 2023-04-21
- Assignees: China University of Mining and Technology
- Applicants: China University of Mining and Technology
- Inventors: Yu TANG; Gang SHEN; Jin CHANG; Gongbo ZHOU; Zhencai ZHU; Yongcun GUO; Ziming KOU; Juan WU; Zhiyuan SHI; Hao LU; Yuxing PENG; Qingguo WANG
- Web page: https://patentgrep.com/patent/US20260185445A1

## CPC

- E21C 35/282: {Autonomous machines; Autonomous operations}
- E02F 3/435: {for dipper-arms, backhoes or the like}
- E02F 3/437: {providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant}
- E02F 9/2041: {Automatic repositioning of implements, i.e. memorising determined positions of the implement (for dipper-arms or bucket-arms E02F3/434, E02F3/437, E02F3/438, E02F3/439 take precedence)}
- E02F 9/205: {Remotely operated machines, e.g. unmanned vehicles (E02F3/8866 takes precedence)}
- E02F 9/261: {Surveying the work-site to be treated}
- E02F 9/262: {with follow-up actions to control the work tool, e.g. controller}
- E02F 9/264: {Sensors and their calibration for indicating the position of the work tool}
- E02F 9/265: {with follow-up actions (e.g. control signals sent to actuate the work tool)}
- E21C 47/02: for coal, brown coal, or the like (dredgers or soil-shifting machines in general E02F)
- G06T 5/80: Geometric correction
- G06T 7/593: from stereo images
- G06V 20/10: Terrestrial scenes (scenes under surveillance with static cameras G06V20/52; scenes perceived from the exterior of a vehicle G06V20/56; scenes perceived from the interior of a vehicle G06V20/59)
- E02F 3/308: {working outwardly}
- E21C 27/30: by jaws, buckets or scoops that scoop-out the mineral
- G06T 2207/10012: Stereo images
- G06T 2207/30181: Earth observation
- E21C: MINING OR QUARRYING
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06V: IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING

## Abstract

Disclosed is a method for controlling an automatic operation of a mining electric shovel considering sudden load variations during excavations, including performing a 3D reconstruction on the morphology features of the material pile to be excavated by using binocular cameras; selecting a function yw=fw(x,t) as the first excavation trajectory; monitoring the real-time volume of excavated materials in the bucket; recording the current position of the bucket tooth tip and the volume V1 of the excavated material, in a case where a large coal rock is monitored to exist in front of the bucket, and selecting the corresponding path planning scheme to avoid the large coal rock block; obtaining the current material pile surface function again; calculating the volume of the remaining excavated materials as the objective function for the second excavation; taking the ending point of the avoidance path as the starting point for the second excavation.

## Claims

### Claim 1

A method for controlling an automatic operation of a mining electric shovel considering sudden load variations during excavations, the method comprising following steps:
Step S1, establishing, by taking O0, O1, O2, O3 as origins, spatial coordinate systems at joints of the mining electric shovel and a center of a binocular camera, respectively, and obtaining, through a D-H means, forward kinematics of a working device of the mining electric shovel;
Step S2, performing, by the binocular camera installed on the mining electric shovel, a three-dimensional reproduction of morphology characteristics of a material pile to be excavated;
Step S3, selecting, by a three-dimensional model of the material pile in a Matlab, an appropriate starting and ending positions for an excavation, and obtaining a function yL=fL(x,t) of a material pile surface passed through during an excavation process;
Step S4, selecting a function yw=fw(x,t) as a first excavation trajectory of the mining electric shovel, and obtaining, by using the forward kinematics of the mining electric shovel and a geometry relation, an expected trajectory of a dipper arm elongation d and an expected trajectory of an inclination angle θ;
Step S5, letting dt be a dynamic excavation depth of a mining electric shovel bucket, and having dt=yL−yw=fL(x,t)−fw(x,t), thereby a real-time volume of excavated materials in a bucket being
V
1
=
∫
0
t
ω
⁢
d
t
⁢
x
.
(
t
)
⁢
dt
,
t
∈
(
0
,
t
f
)
;
where tf denotes a time instant when the bucket leaves the material pile, and ω depends on a width of the mining electric shovel bucket;
Step S6, recording, in a case where a large coal rock block is monitored to exist in front of the bucket through a force sensor installed on a transmission part, a current position (x0, y0) of a bucket tooth tip and a volume V1 of the excavated materials in the bucket, and terminating an excavation work;
Step S7, selecting, in combination with an actual situation of an excavation operation obtained by a camera, a corresponding path planning scheme, to avoid the large coal rock block in front of an excavation direction of the bucket;
Step S8, obtaining, through the binocular camera, a current material pile surface function yL2=fL2(x,t) again;
Step S9, calculating a volume V2 of remaining excavated materials of the mining electric shovel bucket as an objective function for a second excavation; and
Step S10, taking an ending point of an avoidance path as a starting point for the second excavation, re-planing an excavation trajectory to continue the excavation, thereby completing an entire excavation operation.

### Claim 2 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein in the spatial coordinate systems where the joints of the mining electric shovel and the center of the binocular camera are taken as the origins respectively, X0, Y0, X1, Z1, X2, Z2, X3, and Y3 are on a same plane, Z0, Y1, Y2, and Z3 are perpendicular to the plane, coordinate axes X0 and X3 are oriented horizontally to a right, coordinate axes Y0 and Y3 are oriented vertically upward, a coordinate axis X1 is parallel to a coordinate axis X2 with a direction along a shovel arm; a coordinate axis Z1 is parallel to a coordinate axis Z2 with a direction along a shovel rod.

### Claim 3 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein a specific installing position of the binocular camera is at a center of a front side of an arm of the mining electric shovel.

### Claim 4 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein a means for extracting the morphological features of the excavated material pile comprises following steps:
obtaining images of the excavated material pile, capturing and obtaining, through the installed binocular camera, images of material pile to be excavated;
correcting the images, performing a distortion correction and a stereo correction on the obtained images of the material pile;
extracting features, detecting and extracting feature points from a left eye image of the material pile and a right eye image of the material pile;
performing a stereo matching, completing, by using the extracted feature points, stereo matchings of the left eye image and the right eye image, and obtaining a disparity map of the material pile;
filling voids, handling, by using a mean value filling means, invalid errors caused by uneven lighting;
converting a disparity to a depth, converting, through a geometric means, a processed disparity map into a depth map; and
performing a 3D reconstruction, importing, after the depth map is transformed into point cloud data through a coordinate transformation, the point cloud data into the Matlab, and presenting in a form of a stereo map.

### Claim 5 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein the function yL=fL(x,t) is a curve function obtained by fitting a point cloud coordinate of the material pile distributed on an intermediate section of a bucket width direction using a least squares method.

### Claim 6 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein a first excavation trajectory of the mining electric shovel is selected as a logarithmic spiral ρ=ρ0eφ cot δ.

### Claim 7 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein the path planning scheme is that: according to a specific position of the large coal rock block in the material pile, in consideration of a distance situation between the large coal rock block and a ground as well as a distance situation between the large coal rock block and the material pile surface, three different avoidance paths, that is, an upward path, an alternating up and down path, and a downward path, are adopted.

### Claim 8 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein a method for calculating a volume of the remaining excavated materials of the bucket is V2=V0−V1, where V0 denotes a bucket capacity of the mining electric shovel bucket.

### Claim 9 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein an ending point of the second excavation is obtained by simultaneously combining and inversely soluting V2=V0−V1 and a volume formula for excavated materials in the bucket of the secondary excavation
V
2
=
∫
x
0
x
ω
⁢
d
t
⁢
2
⁢
dx
=
∫
x
0
x
ω
⁡
(
k
2
(
ρ
0
⁢
2
⁢
e
φ
⁢
cot
⁢
δ
2
⁢
sin
⁢
φ
-
L
3
)
+
b
2
+
ρ
0
⁢
2
⁢
e
φ
⁢
cot
⁢
δ
2
⁢
cos
⁢
φ
)
⁢
dx
.

### Claim 10 (depends on 1)

The method for controlling the automatic operation of the mining electric shovel considering the sudden load variations during excavations according to claim 1, wherein a second excavation trajectory of the mining electric shovel is selected as a logarithmic spiral ρ=ρ0eφ cot δ.