# US 2026/0176941 A1 · Energized Connectivity Completions Technology

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0176941 A1
- Document ID: US20260176941A1
- Status: Published application
- Kind: A1
- Application number: 17/985,073
- Filed: 2022-11-10
- Published: 2026-06-25
- Earliest claimed: 2022-11-10
- Inventors: Matthew Davis Skinner
- Web page: https://patentgrep.com/patent/US20260176941A1

## CPC

- E21B 43/2401: {by means of electricity}
- E21B 43/2405: {in association with fracturing or crevice forming processes (E21B43/247 takes precedence)}
- E21B 43/26: by forming crevices or fractures
- E21B 17/003: {with electrically conducting or insulating means (E21B17/028 and E21B17/023 take precedence)}
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The completions process eliminates the Oil & Gas Industry's need for fracking and improves the production process. This process uses energy and electricity, instead of chemicals and hydraulic fracturing to create pathways (fractures) which enable the formation to deliver petroleum fluids to the surface. This process reduces our carbon footprint and eliminates the chemical dangers to the water table and threat of earthquakes.

## Claims

### Claim 1

A method of creating fractures in an oil and gas formation, the method comprising:
electrifying an oil and gas formation between a first wellbore and a second wellbore to generate fractures in the oil and gas formation.

### Claim 2 (depends on 1)

The method of claim 1 further comprising running a first high voltage cable into the first wellbore and a second high voltage cable into the second wellbore.

### Claim 3 (depends on 2)

The method of claim 2 further comprising a first conductive device extended down into the first wellbore and electrically connected to the first high voltage cable and a second conductive device extended down into the second wellbore and electrically connected to the second high voltage cable.

### Claim 4 (depends on 3)

The method of claim 3 further comprising setting plugs in the first and second wellbores at a first location to isolate a first zone in the formation to be fractured.

### Claim 5 (depends on 4)

The method of claim 4 further comprising well tractors to deliver the first and second high voltage cables to a location in the first and second wellbores.

### Claim 6 (depends on 2)

The method of claim 2 wherein the oil and gas formation is electrified by directing current to the first and second high voltage cables.

### Claim 7 (depends on 6)

The method of claim 6 wherein the current is provided to the first and second high voltage cables via a transformer.

### Claim 8 (depends on 2)

The method of claim 2 wherein the first high voltage cable is an energized pole and the second high voltage cable is a receiving pole.

### Claim 9 (depends on 4)

The method of claim 4 further comprising unsetting the plugs to permit production fluids to flow in the first and second wellbores.

### Claim 10 (depends on 9)

The method of claim 9 further comprising capturing the production fluids flowing into the first or second wellbore.

### Claim 11 (depends on 4)

The method of claim 4 further comprising:
moving the plugs and the first and second conductive devices to a second location in the first and second wellbores;
setting the plugs in the second location to isolate a second zone in the formation to be fractured; and
electrifying the formation to create fractures in the formation at the second location.

### Claim 12 (depends on 11)

The method of claim 11 further comprising unsetting the plugs to allow production fluids from the second location to flow into the first and second wellbores and be recovered.
