# US 2026/0168379 A1 · Gradient lining structure of traffic tunnel crossing active fault and construction method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0168379 A1
- Document ID: US20260168379A1
- Status: Published application
- Kind: A1
- Application number: 19/356,020
- Filed: 2025-10-10
- Published: 2026-06-18
- Earliest claimed: 2024-11-01
- Assignees: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- Applicants: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- Inventors: Wusheng ZHAO; Weizhong CHEN; Hou GAO; Jinquan LIU; Peiyao XIE; Yiyue TONG; Changkun QIN; Yifan XU
- Web page: https://patentgrep.com/patent/US20260168379A1

## CPC

- E21D 11/003: {Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices (E21D11/38 takes precedence)}
- E21D 9/14: Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
- Y02E 10/20: Hydro energy
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Disclosed in a gradient lining structure of a traffic tunnel crossing an active fault. Within an anti-dislocation fortification range of the tunnel, the gradient lining structure of a traffic tunnel crossing an active fault is provided with a surrounding rock reinforcing layer, an initial supporting layer, a deformation absorption layer, a waterproof layer, and a secondary lining layer in sequence from outside to inside based on a fault dislocation deformation rate curve, so as to obtain the gradient lining structure of a traffic tunnel crossing an active fault. Provided is a construction method of the gradient lining structure of a traffic tunnel crossing an active fault. Compared with the prior art, the gradient lining structure of a traffic tunnel crossing an active fault of this disclosure can achieve uniform stress and deformation of the tunnel lining structure, thereby avoiding misalignment and damage of the lining structure under fault movement.

## Claims

### Claim 1

A gradient lining structure of a traffic tunnel crossing an active fault, wherein the gradient lining structure of a traffic tunnel crossing an active fault is located in a tunnel anti-dislocation fortification area, and the gradient lining structure of a traffic tunnel crossing an active fault comprises:
a surrounding rock reinforcing layer (1), the surrounding rock reinforcing layer (1) being disposed along the full circumference of an inner wall of a tunnel surrounding rock (2);
an initial supporting layer (3), the initial supporting layer (3) being disposed along the full circumference of an inner wall of the surrounding rock reinforcing layer (1);
a deformation absorption layer (4), the deformation absorption layer (4) being disposed along the full circumference of an inner wall of the initial supporting layer (3);
a secondary lining layer (5), the secondary lining layer (5) being disposed along the full circumference of an inner wall of the deformation absorption layer (4); and
a waterproof layer (6), the waterproof layer (6) being arranged in an area above an arch portion of the tunnel (9), and the waterproof layer (6) being located between the deformation absorption layer (4) and the secondary lining layer (5); wherein
the deformation absorption layer (4) comprises: an upper arch absorption layer (41), the upper arch absorption layer (41) being located between the initial supporting layer (3) and the waterproof layer (6); a lower arch absorption layer (42), the lower arch absorption layer (42) being located in an inverted arch area below the arch portion of the tunnel (9), the lower arch absorption layer (42) comprising a foam concrete layer (421) and a pebble layer (422), and the foam concrete layer (421) is located between the pebble layer (422) and the secondary lining layer (5), wherein both the upper arch absorption layer (41) and the foam concrete layer (421) are filled with a foam concrete material; a thickness of the upper arch absorption layer (41) is the same as that of the lower arch absorption layer (42), and a thickness of the foam concrete layer (421) is the same as that of the pebble layer (422); and the thickness of the upper arch absorption layer (41) is not greater than a ratio of fault fortification dislocation quantity to a compression rate of the foam concrete; and
the secondary lining layer (5) comprises a plurality of reinforced concrete segments (51), and each of the reinforced concrete segments (51) is disposed along the full circumference of the inner wall of the surrounding rock reinforcing layer (1); and the plurality of reinforced concrete segments (51) are arranged adjacently along a longitudinal direction of the tunnel (9), and a deformation joint (52) is disposed between any two adjacent reinforced concrete segments (51).

### Claim 2 (depends on 1)

The gradient lining structure of a traffic tunnel crossing an active fault according to claim 1, wherein the surrounding rock reinforcing layer (1) is obtained by anchoring and grouting reinforcement on the inner wall of the tunnel surrounding rock (2); and a radial dimension of the surrounding rock reinforcing layer (1) is 3-5 m.

### Claim 3 (depends on 2)

The gradient lining structure of a traffic tunnel crossing an active fault according to claim 2, wherein the initial supporting layer (3) is obtained by the full-circumference arrangement of a metal mesh and PVA fiber shotcrete; and a thickness of the initial supporting layer (3) is the same as that of the initial supporting layer in a non-dislocation fortification area.

### Claim 4 (depends on 1)

A construction method of the gradient lining structure of a traffic tunnel crossing an active fault, wherein the construction method is used for the construction of the gradient lining structure of a traffic tunnel crossing an active fault according to claim 1, and the construction method comprises:
obtaining a geomechanical model of a surrounding rock in an active fault area based on geometric and motion characteristics of an active fault, physical and mechanical parameters of a fault zone surrounding rock, and a spatial relationship between a tunnel and a fault; obtaining a fault dislocation deformation distribution curve within an anti-dislocation fortification range of the tunnel based on a response calculation of a rock mass in the active fault area under fault fortification dislocation quantity; and obtaining a fault dislocation deformation rate curve by taking a derivative of the fault dislocation deformation distribution curve; and
within the anti-dislocation fortification range of the tunnel, obtaining the gradient lining structure of a traffic tunnel crossing an active fault by disposing a surrounding rock reinforcing layer, an initial supporting layer, a deformation absorption layer, a waterproof layer, and a secondary lining layer in sequence from outside to inside based on the fault dislocation deformation rate curve.

### Claim 5 (depends on 4)

The construction method of the gradient lining structure of a traffic tunnel crossing an active fault according to claim 4, wherein in a longitudinal direction of the tunnel, mechanical parameters of the surrounding rock reinforcing layer gradually decrease towards both sides from a fault main sliding surface; a rate at which the mechanical parameters decrease is consistent with the fault dislocation deformation rate; and the mechanical parameters comprise surrounding rock strength and elastic modulus.

### Claim 6 (depends on 5)

The construction method of the gradient lining structure of a traffic tunnel crossing an active fault according to claim 5, wherein the volume content of PVC in the PVA fiber shotcrete of the initial supporting layer at a position of the fault main sliding surface is 0.7%; in the longitudinal direction of the tunnel, the volume content of PVC in the PVA fiber shotcrete of the initial supporting layer gradually decreases to 0% towards both sides from the fault main sliding surface; and a rate at which the volume content of the PVC decreases is consistent with the fault dislocation deformation rate.

### Claim 7 (depends on 6)

The construction method of the gradient lining structure of a traffic tunnel crossing an active fault according to claim 6, wherein the density of foam concrete of the deformation absorption layer at the position of the fault main sliding surface is 300 kg/m3; in the longitudinal direction of the tunnel, the density of the foam concrete gradually increases to 700 kg/m3 towards both sides from the fault main sliding surface; and a rate at which the density of the foam concrete increases is consistent with the fault dislocation deformation rate.

### Claim 8 (depends on 7)

The construction method of the gradient lining structure of a traffic tunnel crossing an active fault according to claim 7, wherein the length of a reinforced concrete segment of the secondary lining layer at the position of the fault main sliding surface is 4 m; in the longitudinal direction of the tunnel, the length of the reinforced concrete segment gradually increases to 12 m towards both sides from the fault main sliding surface; and a rate at which the length of the reinforced concrete segment increases is consistent with the fault dislocation deformation rate.