Identifying and Monitoring Productivity, Health, and Safety Risks in Industrial Sites
AssigneeProcore Technologies, Inc.
InventorsLai Him Matthew Man, Mohammad Soltani, Seyedfarid Mirahadi, Jiazi Liu
Life of this patent
Estimating the term…
Loading patent…
AssigneeProcore Technologies, Inc.
InventorsLai Him Matthew Man, Mohammad Soltani, Seyedfarid Mirahadi, Jiazi Liu
Estimating the term…
A computing system configured to: (i) receive input data corresponding to a construction site, (ii) based on the input data, produce output data indicating at least one activity or object at the construction site, (iii) based on the output data, determine, from a set of predefined risk-prone characteristics that may be present for at least one of activities or objects at construction sites, that a first and second predefined risk-prone characteristic are present for the at least one activity or object, (iv) based on determining that the first and second predefined risk-prone characteristics are present, determine, from a set of predefined risks, that a given risk corresponds to the at least one activity or object, and (v) based on determining that the given risk corresponds to the at least one activity or object, generate an indication of the given risk for transmission to a computing device.
A computing system comprising:
A non-transitory computer-readable medium, wherein the non-transitory computer-readable medium is provisioned with program instructions that, when executed by at least one processor, cause a computing system to:
A method implemented by a computing system, the method comprising:
Dependencies are inferred from the claim text.