Monitoring and scheduling fuel use for multi-fuel aircraft powerplants
AssigneePratt & Whitney Canada Corp.
InventorJeffrey Weinstein
Life of this patent
Estimating the term…
Loading patent…
AssigneePratt & Whitney Canada Corp.
InventorJeffrey Weinstein
Estimating the term…
A method is provided which includes: processing first fuel data to determine a first trend of a powerplant performance characteristic for a first fuel, wherein the first fuel data is indicative of a plurality of first values of a tracked operational parameter for an aircraft powerplant model over a period of time, and the first values were recorded when combusting the first fuel; processing second fuel data to determine a second trend of the powerplant performance characteristic for a second fuel, wherein the second fuel data is indicative of a plurality of second values of the tracked operational parameter for the aircraft powerplant model over the period of time, and the second values were recorded when combusting the second fuel; and scheduling use of the first fuel and the second fuel based on the first trend of the powerplant performance characteristic and the second trend of the powerplant performance characteristic.
A method, comprising:
(canceled)
(canceled)
A method, comprising:
A method, comprising:
Dependencies are inferred from the claim text.