# US 2026/0135388 A1 · Management of power distribution to and from a data center

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0135388 A1
- Document ID: US20260135388A1
- Status: Published application
- Kind: A1
- Application number: 19/363,532
- Filed: 2025-10-20
- Published: 2026-05-14
- Earliest claimed: 2024-11-12
- Assignees: Vertiv Corporation
- Applicants: Vertiv Corporation
- Inventors: Brian Heber; Terry D. Bush
- Web page: https://patentgrep.com/patent/US20260135388A1

## CPC

- H02J 3/32: using batteries or super capacitors with converting means
- G05B 11/42: for obtaining a characteristic which is both proportional and time-dependent, e.g. P. I., P. I. D.
- H02J 7/34: Parallel operation in networks using both storage and other DC sources, e.g. providing buffering (H02J7/14 takes precedence)
- H02J 7/865: {Battery or charger load switching, e.g. concurrent charging and load supply (H02J7/50 takes precedence)}
- H02J 2105/425: {the loads being an Information and Communication Technology [ICT] facility}
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Systems and methods for providing consistent and reliable power to a data center that is executing high-power and variable high-performance computing (HPC) and artificial intelligence (AI) workloads are disclosed. By installing a three-phase current sensor at or near the data center, or along the power grid before the power arrives at a power conversion system (PCS), the power conversion system is configured to response faster to changing and variable workloads that ramp up and down both quickly and inconsistently. A controller within the PCS is then configured to customize the amount of power that is sent to the data center coming from converted power from the grid, and from a battery energy storage system.

## Claims

### Claim 1

A system for managing power to a data center, the system comprising:
a three-phase current sensor, configured to provide current measurements to a power conversion system, wherein the three-phase current sensor is located proximate to the data center; and
the power conversion system for the data center, comprising a controller, wherein:
the power conversion system is configured to control a rate of power that is provided to the data center from a power grid and from a battery energy storage system that is coupled to the power conversion system; and
to control the rate of power, the controller is configured to:
receive an indication of a difference in current between current measured at the data center and current measured by the power grid based, at least in part, on the current measurements provided by the three-phase current sensor; and
cause one or both of the rate of power from the power grid and the rate of power from the battery energy storage system to be adjusted based, at least in part, on the indication of the difference, to reduce the difference to approximately zero.

### Claim 2 (depends on 1)

The system of claim 1, wherein the controller is a Proportional Integral Derivative controller.

### Claim 3 (depends on 1)

The system of claim 1, wherein the controller is further configured to compute a state of charge of the battery energy storage system.

### Claim 4 (depends on 3)

The system of claim 3, wherein the controller is further configured to:
determine, based on the computed state of charge, that the battery energy storage system is becoming discharged; and
cause the rate of power from the battery energy storage system to be raised to rebalance the state of charge of the battery energy storage system.

### Claim 5 (depends on 3)

The system of claim 3, wherein the controller is further configured to:
determine, based on the computed state of charge, that the battery energy storage system is becoming overcharged; and
cause the rate of power from the battery energy storage system to be lowered to rebalance the state of charge of the battery energy storage system.

### Claim 6 (depends on 1)

The system of claim 1, wherein the battery energy storage system comprises an electrolytic capacitor that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 7 (depends on 1)

The system of claim 1, wherein the battery energy storage system comprises a super capacitor that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 8 (depends on 1)

The system of claim 1, wherein the battery energy storage system comprises a lithium-ion battery that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 9

A system for managing power to a data center, the system comprising:
a three-phase current sensor, configured to provide current measurements to a power conversion system, wherein the three-phase current sensor is located along a power grid that is providing power to the data center; and
the power conversion system for the data center, comprising a controller, wherein:
the power conversion system is configured to control a rate of power that is provided to the data center from the power grid and from a battery energy storage system that is coupled to the power conversion system; and
to control the rate of power, the controller is configured to:
receive an indication of a difference in current between current measured at the data center and current measured by the power grid based, at least in part, on the current measurements provided by the three-phase current sensor; and
cause one or both of the rate of power from the power grid and the rate of power from the battery energy storage system to be adjusted based, at least in part, on the indication of the difference, to reduce the difference to approximately zero.

### Claim 10 (depends on 9)

The system of claim 9, wherein the controller is a Proportional Integral Derivative controller.

### Claim 11 (depends on 9)

The system of claim 9, wherein the controller is further configured to compute a state of charge of the battery energy storage system.

### Claim 12 (depends on 11)

The system of claim 11, wherein the controller is further configured to:
determine, based on the computed state of charge, that the battery energy storage system is becoming discharged; and
cause the rate of power from the battery energy storage system to be raised to rebalance the state of charge of the battery energy storage system.

### Claim 13 (depends on 11)

The system of claim 11, wherein the controller is further configured to:
determine, based on the computed state of charge, that the battery energy storage system is becoming overcharged; and
cause the rate of power from the battery energy storage system to be lowered to rebalance the state of charge of the battery energy storage system.

### Claim 14 (depends on 9)

The system of claim 9, wherein the battery energy storage system comprises an electrolytic capacitor that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 15 (depends on 9)

The system of claim 9, wherein the battery energy storage system comprises a super capacitor that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 16 (depends on 9)

The system of claim 9, wherein the battery energy storage system comprises a lithium-ion battery that is compatible with low voltage, Alternating Current (AC) distribution.

### Claim 17

A method for managing power to a data center, the method comprising:
receiving three-phase voltage from a power grid;
receiving a first three-phase current from a power conversion system that is coupled to a battery energy storage system;
receiving a second three-phase current from a data center;
applying a Phase Locked Loop to measure a frequency and a phase angle of the three-phase voltage from the power grid relative to a given phase;
performing a first Parks-Clarke transformation to the first three-phase current and the phase angle of the three-phase voltage to output a first equivalent phase current;
performing a second Parks-Clarke transformation to the second three-phase current and the phase angle of the three-phase voltage to output a second equivalent phase current;
comparing the first equivalent phase current and the second equivalent phase current to an average equivalent phase current from the data center to output a difference between the three equivalent phase currents; and
outputting a pulse-width modulation command to the power conversion system to generate a fourth equivalent phase current that reduces the difference to approximately zero.

### Claim 18 (depends on 17)

The method of claim 17, further comprising computing a state of charge of the battery energy storage system.

### Claim 19 (depends on 17)

The method of claim 17, further comprising:
determining, based on the computed state of charge, that the battery energy storage system is becoming discharged; and
causing a rate of power from the battery energy storage system to be raised to rebalance the state of charge of the battery energy storage system.

### Claim 20 (depends on 17)

The method of claim 17, further comprising:
determining, based on the computed state of charge, that the battery energy storage system is becoming overcharged; and
causing a rate of power from the battery energy storage system to be lowered to rebalance the state of charge of the battery energy storage system.