# US 2026/0132768 A1 · Wind turbine power plant with peak power consumption control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0132768 A1
- Document ID: US20260132768A1
- Status: Published application
- Kind: A1
- Application number: 18/697,630
- Filed: 2022-09-05
- Published: 2026-05-14
- Earliest claimed: 2021-10-01
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Dumitru-Mihai VALCAN; Artjoms TIMOFEJEVS; Per LUND; Nofel DAKHEL; Jundi JIA; Loránd DEMSA
- Web page: https://patentgrep.com/patent/US20260132768A1

## CPC

- F03D 7/026: {for starting-up}
- F03D 7/0264: {for stopping; controlling in emergency situations (orientating out of wind F03D7/0208)}
- F03D 7/0284: {in relation to the state of the electric grid}
- F03D 7/048: {controlling wind farms}
- F05B 2270/1074: by using back-up controls
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Controlling maximum power consumption of a power plant that includes a plurality of power generating units including a plurality of wind turbines, wherein the wind turbines are disconnected from an electrical power grid and connected to a power backup system. One operation includes setting a power consumption restriction mode of the wind turbines so that a predetermined power consuming activity is started or allowed to start, only for one selection of a plurality of selections of wind turbines of a group of wind turbines at one of a sequence of different start times or within one of non-overlapping start periods.

## Claims

### Claim 1

A method for controlling maximum power consumption of a power plant which comprises a plurality of power generating units including a plurality of wind turbines, wherein the wind turbines are disconnected from an electrical power grid and connected to a power backup system, the method comprises:
setting a power consumption restriction mode of the wind turbines so that a predetermined power consuming activity of each the wind turbines is inhibited from starting, wherein the power consuming activity comprises one or more of a yawing activity, a cable untwist activity, a hydraulic activity, and a heating activity,
determining a start sequence for a group of at least two of the wind turbines, wherein the start sequence comprises a sequence of different start times or non-overlapping starts periods for the predetermined power consuming activity,
operating the wind turbines of the group according to the start sequence so that the predetermined power consuming activity is started or allowed to start, only for one selection of a plurality of selections of wind turbines of the group of wind turbines at one of the start times or within one of the start periods.

### Claim 2 (depends on 1)

A method according to claim 1, wherein the predetermined power consuming activity is started or allowed to start sequentially for the plurality of selections of the wind turbines according to the start sequence.

### Claim 3 (depends on 1)

A method according to claim 1, comprising determining the start sequence of different start times or starts periods, so that succeeding start times are separated at least by the start period, or so that a succeeding start period is located after an end of a preceding start period.

### Claim 4 (depends on 1)

A method according to claim 1, wherein operating the wind turbines so that the predetermined power consuming activity is started comprises sending a start request requesting the selection of one or more wind turbines to start at one of the start times or within one of the start periods.

### Claim 5 (depends on 1)

A method according to claim 1, wherein operating the wind turbines so that the predetermined power consuming activity is allowed to start comprises sending a start permission allowing the selection of one or more wind turbines to start at one of the start times or within one of the start periods.

### Claim 6 (depends on 4)

A method according to claim 4, wherein the start requests or the start permissions are sent sequentially to the plurality of the selections of the wind turbines according to the start sequence.

### Claim 7 (depends on 4)

A method according to claim 4, wherein the wind turbines are configured to start or enabled to start the predetermined power consuming activity in response to receiving the start request or start permission.

### Claim 8 (depends on 1)

A method according to claim 1, comprising
receiving requests from one or more of the wind turbines to perform the predetermined power consuming activity, and
determining the start sequence based on the received requests.

### Claim 9 (depends on 1)

A method according to claim 1, wherein operating the wind turbines comprises running the predetermined power consuming activity for a plurality of wind turbines of at least two of the selections simultaneously after the end of at least one start period.

### Claim 10 (depends on 1)

A method for determining a power capacity of a power backup system, wherein the power backup system is arranged to power a plurality of wind turbines during a situation where the wind turbines are disconnected from an electrical power grid, wherein the wind turbines are arranged to be controlled according to the method of claim 1.

### Claim 11 (depends on 10)

A method according to claim 10, wherein the method comprises
determining a number of one or more wind turbines allowed to start the power consuming activity at the same time or within the same start period, and
determining the power capacity of the power backup system based on said number and a peak start power consumption of the power consuming activity.

### Claim 12

(canceled)

### Claim 13

(canceled)

### Claim 14

(canceled)

### Claim 15

A central controller for controlling power consumption of a power plant which comprises a plurality of power generating units including a plurality of wind turbines, and where the central controller is arranged to perform an operation, comprising, while the wind turbines are disconnected from an electrical power grid and connected to a power backup system:
setting a power consumption restriction mode of the wind turbines so that a predetermined power consuming activity of each the wind turbines is inhibited from starting, wherein the power consuming activity comprises one or more of a yawing activity, a cable untwist activity, a hydraulic activity, and a heating activity;
determining a start sequence for a group of at least two of the wind turbines, wherein the start sequence comprises a sequence of different start times or non-overlapping starts periods for the predetermined power consuming activity; and
operating the wind turbines of the group according to the start sequence so that the predetermined power consuming activity is started or allowed to start, only for one selection of a plurality of selections of wind turbines of the group of wind turbines at one of the start times or within one of the start periods.

### Claim 16 (depends on 15)

The central controller according to claim 15, wherein the predetermined power consuming activity is started or allowed to start sequentially for the plurality of selections of the wind turbines according to the start sequence.

### Claim 17 (depends on 15)

The central controller according to claim 15, wherein the operation further comprises determining the start sequence of different start times or starts periods, so that succeeding start times are separated at least by the start period, or so that a succeeding start period is located after an end of a preceding start period.

### Claim 18

A computer program product comprising software code which, when executed on a data processing system, programs a central controller to perform an operation to control power consumption of a power plant while a plurality of wind turbines of the power plant are disconnected from an electrical power grid and connected to a power backup system; the operation comprising:
setting a power consumption restriction mode of the wind turbines so that a predetermined power consuming activity of each the wind turbines is inhibited from starting, wherein the power consuming activity comprises one or more of a yawing activity, a cable untwist activity, a hydraulic activity, and a heating activity;
determining a start sequence for a group of at least two of the wind turbines, wherein the start sequence comprises a sequence of different start times or non-overlapping starts periods for the predetermined power consuming activity; and
operating the wind turbines of the group according to the start sequence so that the predetermined power consuming activity is started or allowed to start, only for one selection of a plurality of selections of wind turbines of the group of wind turbines at one of the start times or within one of the start periods.

### Claim 19 (depends on 18)

The computer program product according to claim 18, wherein the predetermined power consuming activity is started or allowed to start sequentially for the plurality of selections of the wind turbines according to the start sequence.

### Claim 20 (depends on 18)

The computer program product according to claim 18, wherein the operation further comprises determining the start sequence of different start times or starts periods, so that succeeding start times are separated at least by the start period, or so that a succeeding start period is located after an end of a preceding start period.
