# US 2026/0125812 A1 · Integrated power production and storage systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0125812 A1
- Document ID: US20260125812A1
- Status: Published application
- Kind: A1
- Application number: 19/425,001
- Filed: 2025-12-18
- Published: 2026-05-07
- Earliest claimed: 2020-09-01
- Assignees: Mitsubishi Power Americas, Inc.
- Applicants: Mitsubishi Power Americas, Inc.
- Inventors: David Hunt; David McDeed; Mark Peak; Peter Luessen; Brian Allen; Jeanfils Saint-Cyr
- Web page: https://patentgrep.com/patent/US20260125812A1

## CPC

- C25B 15/02: Process control or regulation
- F02C 3/20: using a special fuel, oxidant, or dilution fluid to generate the combustion products
- C25B 15/021: of heating or cooling
- F01K 23/101: {Regulating means specially adapted therefor (F01K23/105, F01K23/108 take precedence)}
- F02C 6/00: Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 15/50: using stored hydrogen
- C25B 1/04: by electrolysis of water
- C25B 1/042: by electrolysis of steam
- C25B 1/044: producing mixed hydrogen and oxygen gas, e.g. Brown's gas [HHO]
- H02J 2101/20: Dispersed power generation using renewable energy sources
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 20/14: Combined heat and power generation [CHP]
- Y02E 20/16: Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
- Y02E 50/10: Biofuels, e.g. bio-diesel
- Y02E 60/36: Hydrogen production from non-carbon containing sources, e.g. by water electrolysis
- Y02P 80/15: On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
- Y02T 50/60: Efficient propulsion technologies, e.g. for aircraft
- C25B: ELECTROLYTIC OR ELECTROPHORETIC PROCESSES FOR THE PRODUCTION OF COMPOUNDS OR NON-METALS; APPARATUS THEREFOR (anodic or cathodic protection C23F13/00; single-crystal growth C30B)
- F02C: GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS (construction of turbines F01D; jet-propulsion plants F02K; construction of compressors or fans F04; generating combustion products of high pressure or high velocity F23R; using gas turbines in compression refrigeration plants F25B11/00)
- F01K: STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES (gas-turbine or jet-propulsion plants F02; nuclear power plants, engine arrangements therein G21D)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

A power plant is configured to output power to a grid power system and comprises a hydrogen generation system configured to produce hydrogen, a gas turbine combined cycle power plant comprising a gas turbine engine configured to combust hydrogen from the hydrogen generation system to generate a gas stream that can be used to rotate a turbine shaft and a heat recovery steam generator (HRSG) configured to generate steam with the gas stream of the gas turbine engine to rotate a steam turbine, a storage system configured to store hydrogen produced by the hydrogen generation system, and a controller configured to operate the hydrogen generation system with electricity from the grid power system when the grid power system has excess energy and balance active and reactive loads on the grid power system using at least one of the hydrogen generation system and the gas turbine combined cycle power plant.

## Claims

### Claim 1

A method of operating an integrated power plant connected to a grid power system, the method comprising:
operating a gas turbine engine to drive an electric generator to provide power to the grid power system, the gas turbine engine operable on hydrogen, natural gas and blends thereof;
operating an electrolyzer to generate hydrogen and oxygen with electricity from the grid power system;
storing hydrogen produced by the electrolyzer in a storage system; and
coordinating operation of the gas turbine engine and the electrolyzer based upon a power demand of the grid power system.

### Claim 2 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
operating the gas turbine engine with natural gas when renewable energy sources are available.

### Claim 3 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
operating the gas turbine engine with hydrogen when renewable energy sources are not available.

### Claim 4 (depends on 3)

The method of claim 3, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
obtaining the hydrogen for the gas turbine engine from a hydrogen storage system.

### Claim 5 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
operating the gas turbine engine with a blend of hydrogen and natural gas.

### Claim 6 (depends on 5)

The method of claim 5, wherein operating the gas turbine engine with a blend of hydrogen and natural gas occurs when the power demand of the grid power system is in a transition state between a first power demand level and a second power demand level.

### Claim 7 (depends on 6)

The method of claim 6, wherein operating the gas turbine engine with a blend of hydrogen and natural gas occurs when renewable energy sources are partially available to the grid power system.

### Claim 8 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
starting the gas turbine engine from a state of not operating to operate at rate of increasing power production to attain a maximum rated power output; and
discontinuing operation of the electrolyzer and consumption of electricity by the electrolyzer from the grid power system;
wherein the power demand of the grid power system is a call for maximum power.

### Claim 9 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
ramping up operation of the gas turbine engine from a partial load state at a maximum ramp rate; and
discontinuing operation of the electrolyzer and consumption of electricity from the grid power system;
wherein the power demand of the grid power system is a call for maximum power.

### Claim 10 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and the electrolyzer based upon the power demand of the grid power system comprises:
reducing operation of the gas turbine engine from a maximum load status to a minimum load status to produce a reduced electricity output; and
starting operation of the electrolyzer to consume the reduced electricity output;
wherein the power demand of the grid power system is reduced.

### Claim 11 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and electrolyzer to power demand of the grid power system comprises:
operating the gas turbine engine in a standby mode; and
shutting down operation of the electrolyzer; wherein the demand of the grid power system is constant.

### Claim 12 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and electrolyzer to power demand of the grid power system comprises:
ramping up operation of the gas turbine engine to full speed; and
reducing output of the electrolyzer; wherein the demand of the grid power system is increased.

### Claim 13 (depends on 1)

The method of claim 1, wherein coordinating operation of the gas turbine engine and electrolyzer to power demand of the grid power system comprises:
ramping up operation of the gas turbine engine from a non-operating state; and
shutting down operation of the electrolyzer; wherein the demand of the grid power system is increasing.

### Claim 14

An integrated power plant system comprising:
a gas turbine engine operable on hydrogen, natural gas and blends thereof;
a plurality of electrolyzers;
a storage system;
a controller in communication with the plurality of electrolyzers, the gas turbine engine and the storage system; and
memory having instructions stored therein executable by the controller to operate the plurality of electrolyzers, the gas turbine engine and the storage system, the instructions comprising:
instructions for operating the gas turbine engine to drive an electric generator to provide power to a grid power system, the gas turbine engine operable on at least one of hydrogen, natural gas and blends thereof;
instructions for operating one or more of the plurality of electrolyzers to generate hydrogen and oxygen with electricity from the grid power system;
instructions for storing hydrogen produced by the one or more of the plurality of electrolyzers in a storage system; and
instructions for coordinating operation of the gas turbine engine and the plurality of electrolyzers to power demand of the grid power system.

### Claim 15 (depends on 14)

The integrated power plant system of claim 14, wherein instruction for coordinating operation of the gas turbine engine and the plurality of electrolyzers based upon the power demand of the grid power system comprises:
operating the gas turbine engine with natural gas when renewable energy sources are available.

### Claim 16 (depends on 14)

The integrated power plant system of claim 14, wherein instruction for coordinating operation of the gas turbine engine and the plurality of electrolyzers based upon the power demand of the grid power system comprises:
operating the gas turbine engine with hydrogen when renewable energy sources are not available.

### Claim 17 (depends on 16)

The integrated power plant system of claim 16, wherein instructions for coordinating operation of the gas turbine engine and the plurality of electrolyzers based upon the power demand of the grid power system comprises:
obtaining the hydrogen for the gas turbine engine from a hydrogen storage system.

### Claim 18 (depends on 14)

The integrated power plant system of claim 14, wherein instructions for coordinating operation of the gas turbine engine and the plurality of electrolyzers based upon the power demand of the grid power system comprises:
operating the gas turbine engine with a blend of hydrogen and natural gas.

### Claim 19 (depends on 18)

The integrated power plant system of claim 18, wherein operating the gas turbine engine with a blend of hydrogen and natural gas occurs when the power demand of the grid power system is in a transition state between a first power demand level and a second power demand level.

### Claim 20 (depends on 19)

The integrated power plant system of claim 19, wherein operating the gas turbine engine with a blend of hydrogen and natural gas occurs when renewable energy sources are partially available to the grid power system.