# US 2026/0118857 A1 · Apparatus for providing digital production plan information, method thereof, and computationally implementable storage medium for storing a software for providing digital production plan information

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0118857 A1
- Document ID: US20260118857A1
- Status: Published application
- Kind: A1
- Application number: 19/371,112
- Filed: 2025-10-28
- Published: 2026-04-30
- Earliest claimed: 2024-10-22
- Assignees: VMS Solutions Co. Ltd.
- Applicants: Vms Solutions Co., Ltd.
- Inventors: Taeryong KIM; Seungjin RYU; Wonseok LEE; Wonjun LEE; Goohwan CHUNG; Byunghee KIM
- Web page: https://patentgrep.com/patent/US20260118857A1

## CPC

- G06Q 10/06332: {using business process templates}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/06316: {Sequencing of tasks or work}
- G06Q 50/04: Manufacturing
- G05B 2219/32111: PPS production planning system
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

An embodiment for providing digital production plan information comprises that providing, to a client, an extensible software model and logic set to generate production plan data, receiving first input data comprising reference information for a manufacturing production system, and second input data for setting at least one parameter, and based on the first and second input data, performing at least one of learning, evaluating, operating, deploying, and managing at least one policy to provide the production plan data to the client.

## Claims

### Claim 1

A method of providing digital production plan information comprising:
obtaining rule information for each decision-making point of at least one of pre-stored backward planning logic or forward planning logic for a manufacturing production system of a client;
receiving input data including reference information about the manufacturing production system from the client; and
providing production plan data to the client by executing a software model and logic set including at least one of backward planning logic or forward planning logic according to the rule information based on the input data.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
After the receiving step, applying the input data based on a pre-stored standard model to determine at least one of the backward planning logic or the forward planning logic; and
applying the rule information for each decision-making point to a decision-making point in at least one of the determined backward planning logic or the determined forward planning logic.

### Claim 3 (depends on 2)

The method of claim 2, wherein the backward planning logic comprises:
an align step, determining a pegging group including at least one work object of a plurality of work objects based on the input data according to the rule information;
an item/site/buffer (ISB) pegging step, executing a work-in-process (WIP) pegging on a target work object of the at least one work object for current ISB information according to the rule information;
an ISB routing step, determining a target bill of material (BOM) of the at least one BOM for the target work object for which the WIP pegging is performed according to the rule information;
an operation pegging step, performing the WIP pegging on the target work object for an operation on the target BOM according to the rule information; and
an operation routing step, applying time information for the operation to the target work object for which the WIP pegging is performed according to the rule information.

### Claim 4 (depends on 3)

The method of claim 3, wherein the backward planning logic comprises:
calculating at least one of an operation target, factory input plan information, or a pegging history for the operation based on a target work object having time information for the operation according to the rule information.

### Claim 5 (depends on 1)

The method of claim 1, wherein the forward planning logic comprises:
selecting, based on the rule information, a resource group including at least one resource for an operation of the manufacturing production system of the client;
selecting a work item group including at least one work item for the resource group;
selecting a resource for the selected work item group from at least one resource included in the resource group; and
selecting a work item for the resource from among at least one work item included in the work item group.

### Claim 6 (depends on 1)

The method of claim 1, wherein the forward planning logic comprises:
selecting, based on the rule information, a resource for an operation of the manufacturing production system of the client;
selecting a work item group including at least one work item for the resource; and
selecting a work item for the resource from the at least one work item included in the work item group.

### Claim 7 (depends on 5, 6)

The method of claim 5 or 6, wherein the forward planning logic comprises:
executing operation processing on the selected work item and resource;
placing the work item into the ISB information based on the pegging history included in the input data;
moving work item based on an operational target included in the input data to an operation for the ISB information;
if the operation is not a dummy operation, placing the moved work item into a buffer; and
if the operation is a dummy operation, executing dummy operation processing on the moved work item.

### Claim 8

A device providing digital production plan information, comprising:
storage storing data;
an in-memory storing a library engine set associated with a software; and
a processor executing the software, wherein the processor is configured to:
obtain rule information for each decision-making point of at least one of pre-stored backward planning logic or forward planning logic for a manufacturing production system of a client; and
receive, from the client, input data including reference information about the manufacturing production system; and
execute perform, based on the input data, a software model and logic set including at least one of backward planning logic or forward planning logic according to the rule information to provide production plan data to the client.

### Claim 9 (depends on 8)

The device of claim 8, wherein the processor is further configured to:
apply the input data based on a pre-stored standard model and determine at least one of the backward planning logic or the forward planning logic; and
apply the rule information for each decision-making point to a decision-making point of at least one of the determined backward planning logic or the determined forward planning logic

### Claim 10 (depends on 9)

The device of claim 9, wherein the backward planning logic comprises:
determining a pegging group including at least one work object of a plurality of work objects based on the input data according to the rule information;
executing a work-in-process (WIP) pegging on a target work object of the at least one work object for current ISB information according to the rule information;
determining a target bill of material (BOM) of the at least one BOM for the target work object for which the WIP pegging is performed according to the rule information;
performing the WIP pegging on the target work object for an operation on the target BOM according to the rule information; and
applying time information for the operation to the target work object for which the WIP pegging is performed according to the rule information.

### Claim 11 (depends on 10)

The device of claim 10, wherein the backward planning logic includes calculating at least one of an operation target, factory input plan information, or a pegging history for the operation based on a target work object having time information for the operation according to the rule information.

### Claim 12 (depends on 8)

The device of claim 8, wherein the forward planning logic comprises:
selecting, based on the rule information, a resource group including at least one resource for an operation of the manufacturing production system of the client;
selecting a work item group including at least one work item for the resource group;
selecting a resource for the selected work item group from at least one resource included in the resource group; and
selecting a work item for the resource from among at least one work item included in the work item group.

### Claim 13 (depends on 8)

The device of claim 8, wherein the forward planning logic comprises:
selecting, based on the rule information, a resource for an operation of the manufacturing production system of the client;
selecting a work item group including at least one work item for the resource; and
selecting a work item for the resource from the at least one work item included in the work item group.

### Claim 14 (depends on 12, 13)

The device of claim 12 or 13, wherein the forward planning logic comprises:
executing operation processing on the selected work item and resource;
placing the work item into the ISB information based on the pegging history included in the input data;
moving work item based on an operational target included in the input data to an operation for the ISB information;
if the operation is not a dummy operation, placing the moved work item into a buffer; and
if the operation is a dummy operation, executing dummy operation processing on the moved work item.

### Claim 15

A non-transitory computer-readable storage medium for storing a program for providing digital production plan information executable by a computer, the program comprising instructions configured to:
obtain, rule information for each decision-making point of at least one of pre-stored backward planning logic or forward planning logic for a manufacturing production system of a client;
receive, from the client, input data including reference information about the manufacturing production system; and
execute, based on the input data, a software model and logic set including at least one of backward planning logic or forward planning logic according to the rule information to provide production plan data to the client.