# US 2026/0112055 A1 · Synchronized pose determination using laser tracking and imu

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0112055 A1
- Document ID: US20260112055A1
- Status: Published application
- Kind: A1
- Application number: 19/228,234
- Filed: 2025-06-04
- Published: 2026-04-23
- Earliest claimed: 2024-06-05
- Assignees: Leica Geosystems AG
- Applicants: Leica Geosystems AG
- Inventors: Tomasz KWIATKOWSKI
- Web page: https://patentgrep.com/patent/US20260112055A1

## CPC

- G01B 11/26: for measuring angles or tapers; for testing the alignment of axes
- G06T 7/74: {involving reference images or patches}
- B25J 15/0019: {End effectors other than grippers}
- G01B 11/002: {for measuring two or more coordinates}
- G01B 11/005: {coordinate measuring machines}
- G01S 5/163: {Determination of attitude (using inertial means G01C9/00; control of attitude G05D1/49)}
- G01S 17/66: Tracking systems using electromagnetic waves other than radio waves
- G06T 2207/10016: Video; Image sequence
- G06T 2207/30204: Marker
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- G01S: RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES

## Abstract

A tool pose determination system, comprising a tool, a laser tracker, a data processor, and an IMU. The tool comprises a laser-trackable target and alignment markings distributed such that a tool orientation is derivable based on their pattern. The laser tracker provides tracking data regarding a target position with a first sampling sequence having a first sampling rate. An imaging unit of the laser tracker acquires images with a second sampling sequence having a second sampling rate which is less than the first. The IMU unit provides IMU orientation regarding the tool orientation. The data processor derives image-based orientation based on the imaged pattern of the markings and references the IMU orientation with the image-based orientation. The data processor provides output data timestamped with a third sampling sequence having a third sampling rate which is more than the second.

## Claims

### Claim 1

Tool pose determination system comprising: a tool, a laser tracker, a data processor, and an inertial measurement unit, wherein
the tool comprises:
a laser-trackable target, and
a set of alignment markings distributed such that a tool orientation is unambiguously derivable based on an imaged pattern of the alignment markings,
the laser tracker:
is configured to track the target and to provide tracking data regarding a target position according to a first sampling sequence having a first sampling rate, and comprises an imaging unit configured to acquire images according to a second sampling sequence having a second sampling rate which is less than the first sampling rate,
the inertial measurement unit is configured to provide IMU orientation data regarding the tool orientation, and
the data processor is configured:
to derive image-based orientation data regarding the tool orientation based on the imaged pattern of the alignment markings, and
to reference the IMU orientation data with the image-based orientation data,
the data processor is configured to provide output data comprising:
a sequence of tool positions timestamped according to a third sampling sequence having a third sampling rate which is more than the second sampling rate, wherein the tool positions are based on the tracking data, and
a sequence of tool orientations timestamped according to the third sampling sequence, wherein the tool orientations are based on the IMU orientation data and the image-based orientation data.

### Claim 2 (depends on 1)

The tool pose determination system according to claim 1, wherein the third sampling rate is an integer multiple of the second sampling rate and/or equal to the first sampling rate, in particular wherein the third sampling rate is at least ten times the second sampling rate.

### Claim 3 (depends on 1)

The tool pose determination system according to claim 1, wherein:
second sampling sequence is synchronized with the first sampling sequence, and
the sequence of tool orientations comprises a first subsequence and a second subsequence intermittent to the first sub-sequence, wherein:
the tool orientations of the first subsequence are associated with the second sampling sequence, and
the tool orientations of the second subsequence are derived based on the IMU orientation data and at least one tool orientation of the first subsequence.

### Claim 4 (depends on 3)

The tool pose determination system according to claim 3, wherein the inertial measurement unit comprises a filter or a Kalman-filter, configured to perform a zero-point calibration based on the image based orientation data.

### Claim 5 (depends on 4)

The tool pose determination system according to claim 4, wherein an update interval of the zero-point calibration is matched with the second sampling sequence.

### Claim 6 (depends on 1)

The tool pose determination system according to claim 1, wherein
the tool is configured to be coupled with a measurement instrument, particularly a coordinate measuring instrument, more particularly a handheld coordinate measuring instrument, and
the data processor is configured to transfer the output data to the measurement instrument for providing measurement data by the measurement instrument.

### Claim 7 (depends on 1)

The tool pose determination system according to claim 1, wherein:
the tool is configured to be coupled with a motorized frame, particularly with a robotic arm, and
the data processor is configured to transfer the output data to the motorized frame for providing control commands for the motorized frame.

### Claim 8 (depends on 7)

The tool pose determination system according to claim 7, wherein the inertial measuring unit is disposed at a finite distance from the tool, in particular integrated with the motorized frame.

### Claim 9 (depends on 1)

The tool pose determination system according to claim 1, wherein the set of alignment markings are configured to emit and/or to reflect light radiation.

### Claim 10 (depends on 9)

The tool pose determination system according to claim 9, wherein the set of alignment markings is embodied as a set of laser diodes or a set of LED light sources configured to emit radiation in a pulsed manner such that the emitted pulses are synchronized with the second sampling sequence.

### Claim 11 (depends on 10)

The tool pose determination system according to claim 10, wherein the laser tracker is configured to provide synchronization commands to the inertial measurement unit and the set of alignment markings, particularly via a tracking radiation.

### Claim 12 (depends on 1)

The tool pose determination system according to claim 1, wherein the tool comprises a further target, wherein the further target:
is laser trackable, in particular formed identically to the target, and
is disposed on a different face of the tool with a pre-set geometric relation to the target, and wherein the tool pose determination system is configured
to provide further tracking data regarding a further target position according to the first sampling sequence,
to provide a sequence of further tool positions timestamped according to the third sampling sequence, wherein the further tool positions are based on the further tracking data, and
to switch between providing the tracking data and the further tracking data based on the tool orientation.

### Claim 13

A method for determining a pose of a tool, the tool being associated with a laser-trackable target, a set of alignment markings and an inertial measurement unit, wherein the method comprises:
acquiring, by a laser tracker, tracking data regarding a target position according to a first sampling sequence having a first sampling rate,
acquiring, by an imaging unit, images comprising imaged patterns of the alignment markings according to a second sampling sequence having a second sampling rate which is less than the first sampling rate,
acquiring, by the inertial measurement unit, IMU orientation data regarding the tool orientation, deriving image-based orientation data regarding the tool orientation based on the imaged patterns of the alignment markings, and
referencing the IMU orientation data with the image-based orientation data,
providing a sequence of tool positions timestamped according to a third sampling sequence having a third sampling rate which is more than the second sampling rate, wherein the tool positions are based on the tracking data, and
providing a sequence of tool orientations timestamped according to the third sampling sequence, wherein the tool orientations are based on the IMU orientation data and the image-based orientation data.

### Claim 14 (depends on 13)

The method according to claim 13, wherein the third sampling rate is an integer multiple of the second sampling rate and/or equal to the first sampling rate.

### Claim 15 (depends on 14)

The method according to claim 14, wherein the third sampling rate is at least ten times the second sampling rate.

### Claim 16 (depends on 1)

A computer program which is stored on a non-transitory machine-readable medium, comprises a program code segment, and has computer-executable instructions for performing:
receiving tracking data regarding a target position of a laser-trackable target, wherein the tracking data is timestamped according to a first sampling sequence having a first sampling rate, receiving images comprising imaged patterns of alignment markings, wherein the images are timestamped according to a second sampling sequence having a second sampling rate which is less than the first sampling rate,
deriving image-based orientation data regarding the tool orientation based on the imaged patterns of the alignment markings,
receiving IMU orientation data regarding the tool orientation,
referencing the IMU orientation data with the image-based orientation data,
providing a sequence of tool positions timestamped according to a third sampling sequence having a third sampling rate which is more than the second sampling rate, wherein the tool positions are based on the tracking data, and
providing a sequence of tool orientations timestamped according to the third sampling sequence, wherein the tool orientations are based on the IMU orientation data and the image-based orientation data,
wherein the computer program is configured to be executed by a system according to claim 1.

### Claim 17 (depends on 16)

The computer program according to claim 16 having further computer-executable instructions for providing the sequences of tool positions and orientations as output data:
to a measurement instrument for providing measurement data by the measurement instrument, and/or
to a robotic arm for providing control commands for the robotic arm.
