# US 2026/0110457 A1 · Reheat scheduling for water heaters

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0110457 A1
- Document ID: US20260110457A1
- Status: Published application
- Kind: A1
- Application number: 18/921,848
- Filed: 2024-10-21
- Published: 2026-04-23
- Earliest claimed: 2024-10-21
- Applicants: Hootwater Inc.
- Inventors: Robert M. CHOWN
- Web page: https://patentgrep.com/patent/US20260110457A1

## CPC

- F24H 15/108: Resuming operation, e.g. after power outages
- F24H 1/201: {using electric energy supply}
- F24H 9/1818: Arrangement or mounting of electric heating means
- F24H 9/2021: {Storage heaters}
- F24H 15/124: Preventing or detecting electric faults, e.g. electric leakage
- F24H 15/172: Scheduling based on user demand, e.g. determining starting point of heating
- F24H 15/225: at different heights of the tank
- F24H 15/269: Time, e.g. hour or date
- F24H 15/281: Input from user
- F24H 15/37: of electric heaters
- F24H 15/395: Information to users, e.g. alarms
- F24H 15/486: using timers
- F24H 15/407: using electrical switching, e.g. TRIAC
- F24H: FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL (steam generation F22)

## Abstract

A method of controlling an electric tank-style water heater having at least an upper heating element and a lower heating element is provided. Operating electricity is denied to at least the lower heating element at an initial scheduled shutdown time according to an initial control protocol. Then, supply of the operating electricity to at least the lower heating element is resumed at an initial scheduled restart time according to the initial control protocol. Recovery activation time of the water heater following the resumption of the supply of the operating electricity is monitored. Responsive to a function of the recovery activation time of the water heater exceeding an upper threshold, the initial control protocol is adjusted to obtain a first adjusted control protocol to reduce the recovery activation time. An electric tank-style water heater and a control module therefor are also described.

## Claims

### Claim 1

A method of controlling an electric tank-style water heater having at least an upper heating element and a lower heating element, the method comprising:
denying operating electricity to at least the lower heating element at an initial scheduled shutdown time according to an initial control protocol;
resuming supply of the operating electricity to at least the lower heating element at an initial scheduled restart time according to the initial control protocol;
monitoring a recovery activation time of the water heater following the resumption of the supply of the operating electricity; and
responsive to a function of the recovery activation time of the water heater exceeding an upper threshold, adjusting the initial control protocol to obtain a first adjusted control protocol to reduce the recovery activation time.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
the operating electricity is at least selectively permitted to reach at least the upper heating element;
the method further comprising:
monitoring a top-up activation time of the water heater between the initial scheduled shutdown time and the initial scheduled restart time;
wherein the function of the recovery activation time of the water heater incorporates the top-up activation time of the water heater.

### Claim 3 (depends on 1)

The method of claim 1, wherein adjusting the initial control protocol to obtain the first adjusted control protocol comprises at least one of:
adjusting the initial scheduled shutdown time to become an adjusted scheduled shutdown time that is later than the initial scheduled shutdown time;
adjusting the initial scheduled restart time to become an adjusted scheduled restart time that is earlier than the initial scheduled restart time; and
allowing activation of at least one of the upper heating element and the lower heating element between the adjusted scheduled shutdown time and the adjusted scheduled restart time.

### Claim 4 (depends on 1)

The method of claim 1, further comprising, responsive to the function of the recovery activation time of the water heater failing to exceed a lower threshold, adjusting the initial control protocol to obtain a second adjusted control protocol to increase the recovery activation time.

### Claim 5 (depends on 4)

The method of claim 4, wherein adjusting the initial control protocol to obtain the second adjusted control protocol comprises at least one of:
adjusting the initial scheduled shutdown time to become an adjusted scheduled shutdown time that is earlier than the initial shutdown time; and
adjusting the initial scheduled restart time to become an adjusted scheduled restart time that is later than the initial scheduled restart time.

### Claim 6 (depends on 1)

The method of claim 1, wherein monitoring the recovery activation time of the water heater following the resumption of the supply of the operating electricity occurs over multiple days.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
the operating electricity is denied to both the upper heating element and the lower heating element at the initial scheduled shutdown time; and
the supply of the operating electricity is resumed to both the upper heating element and the lower heating element at the initial scheduled restart time;
the method further comprising:
between the initial scheduled shutdown time and the initial scheduled restart time, monitoring for closure of an upper thermostat governing the upper heating element; and
responsive to at least detecting closure of the upper thermostat, supplying the operating electricity to at least the upper heating element before the initial scheduled restart time.

### Claim 8 (depends on 1)

The method of claim 1, wherein denying the operating electricity to at least the lower heating element at the initial scheduled shutdown time according to the initial control protocol comprises denying operating electricity only to the lower heating element.

### Claim 9

An electric tank-style water heater, comprising:
a tank, the tank having:
a water inlet for receiving cooler water into the tank; and
a water outlet for releasing heated water from the tank;
a lower heating element protruding into the tank;
a lower thermostat governing supply of electrical power to the lower heating element;
an upper heating element protruding into the tank;
an upper thermostat governing supply of electrical power to the upper heating element;
an electrical junction, wherein:
the electrical junction is in electrical communication with the upper heating element through the upper thermostat;
the electrical junction is in electrical communication with the lower heating element through the lower thermostat; and
wherein the water heater comprises a control module configured to:
cause the water heater to:
deny operating electricity to at least the lower heating element at an initial scheduled shutdown time according to an initial control protocol; and
resume supply of the operating electricity to at least the lower heating element at an initial scheduled restart time according to the initial control protocol; and
monitor a recovery activation time of the water heater following resumption of the supply of the operating electricity; and
responsive to a function of the recovery activation time of the water heater exceeding an upper threshold, cause the water heater to operate according to a first adjusted control protocol adapted to reduce the recovery activation time.

### Claim 10 (depends on 8)

The water heater of claim 8, wherein the control module is configured to:
cause the water heater to at least selectively permit the operating electricity to reach at least the upper heating element; and
monitor a top-up activation time of the water heater between the initial scheduled shutdown time and the initial scheduled restart time;
wherein the function of the recovery activation time of the water heater incorporates the top-up activation time of the water heater.

### Claim 11 (depends on 9)

The water heater of claim 9, wherein the first adjusted control protocol comprises at least one of:
an adjusted scheduled shutdown time that is later than the initial scheduled shutdown time;
an adjusted scheduled restart time that is earlier than the initial scheduled restart time;
and allowing activation of at least one of the upper heating element and the lower heating element between the adjusted scheduled shutdown time and the adjusted scheduled restart time.

### Claim 12 (depends on 9)

The water heater of claim 9, wherein the control module is further configured to, responsive to the function of the recovery activation time of the water heater failing to exceed a lower threshold, cause the water heater to operate according to a second adjusted control protocol to increase the recovery activation time.

### Claim 13 (depends on 12)

The water heater of claim 12, wherein the second adjusted control protocol comprises at least one of:
an adjusted scheduled shutdown time that is earlier than the initial shutdown time; and
an adjusted scheduled restart time that is later than the initial scheduled restart time.

### Claim 14 (depends on 9)

The water heater of claim 9, wherein the control module is configured to monitor the recovery activation time of the water heater following the resumption of the supply of the operating electricity over multiple days.

### Claim 15 (depends on 9)

The water heater of claim 9, wherein:
the control module causes the water heater to:
deny the operating electricity to both the upper heating element and the lower heating element at the initial scheduled shutdown time; and
resume the supply of the operating electricity to both the upper heating element and the lower heating element at the initial scheduled restart time; and
the control module is configured to:
between the initial scheduled shutdown time and the initial scheduled restart time, monitor for closure of an upper thermostat governing the upper heating element; and
responsive to at least detecting closure of the upper thermostat, cause the water heater to supply the operating electricity to at least the upper heating element before the initial scheduled restart time.

### Claim 16 (depends on 9)

The water heater of claim 9, wherein the control module causes the water heater to deny the operating electricity only to the lower heating element.

### Claim 17

A control module adapted to be coupled to an electric tank-style water heater having at least an upper heating element and a lower heating element, wherein:
the control module is configured to cause the water heater to:
deny operating electricity to at least the lower heating element at an initial scheduled shutdown time according to an initial control protocol; and
resume supply of the operating electricity to at least the lower heating element at an initial scheduled restart time according to the initial control protocol; and
the control module is configured to monitor a recovery activation time of the water heater following resumption of the supply of the operating electricity; and
the control module is configured to, responsive to a function of the recovery activation time of the water heater exceeding an upper threshold, further cause the water heater to operate according to a first adjusted control protocol adapted to reduce the recovery activation time.

### Claim 18 (depends on 17)

The control module of claim 17, wherein the control module is configured to:
cause the water heater to at least selectively permit the operating electricity to reach at least the upper heating element; and
monitor a top-up activation time of the water heater between the initial scheduled shutdown time and the initial scheduled restart time; and
wherein the function of the recovery activation time of the water heater incorporates the top-up activation time of the water heater.

### Claim 19 (depends on 17)

The control module of claim 17, wherein the first adjusted control protocol comprises at least one of:
an adjusted scheduled shutdown time that is later than the initial scheduled shutdown time;
an adjusted scheduled restart time that is earlier than the initial scheduled restart time;
and allowing activation of at least one of the upper heating element and the lower heating element between the adjusted scheduled shutdown time and the adjusted scheduled restart time.

### Claim 20 (depends on 17)

The control module of claim 17, wherein the control module is further configured to, responsive to the function of the recovery activation time of the water heater failing to exceed the lower threshold, cause the water heater to operate according to a second adjusted control protocol to increase the recovery activation time.

### Claim 21 (depends on 20)

The control module of claim 20, wherein the second adjusted control protocol comprises at least one of:
an adjusted scheduled shutdown time that is earlier than the initial shutdown time; and
an adjusted scheduled restart time that is later than the initial scheduled restart time.

### Claim 22 (depends on 17)

The control module of claim 17, wherein the control module is configured to monitor the recovery activation time of the water heater following the resumption of the supply of the operating electricity over multiple days.

### Claim 23 (depends on 17)

The control module of claim 17, wherein the control module is configured to:
cause the water heater to:
deny the operating electricity to both the upper heating element and the lower heating element at the initial scheduled shutdown time; and
resume the supply of the operating electricity to both the upper heating element and the lower heating element at the initial scheduled restart time;
between the initial scheduled shutdown time and the initial scheduled restart time, monitor for closure of an upper thermostat governing the upper heating element; and
responsive to at least detecting closure of the upper thermostat, cause the water heater to supply the operating electricity to at least the upper heating element before the initial scheduled restart time.

### Claim 24 (depends on 17)