# US 2026/0101345 A1 · Handling time overlapped ul transmissions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0101345 A1
- Document ID: US20260101345A1
- Status: Published application
- Kind: A1
- Application number: 19/114,938
- Filed: 2023-09-29
- Published: 2026-04-09
- Earliest claimed: 2022-09-30
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget Lm Ericsson (Publ)
- Inventors: Shiwei Gao; Andreas Nilsson; Siva Muruganathan
- Web page: https://patentgrep.com/patent/US20260101345A1

## CPC

- H04W 56/0045: {compensating for timing error by altering transmission time}
- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04W 76/38: triggered by timers
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Systems and methods are disclosed that relate to handling of time-overlapped uplink transmissions in a cellular communications system. In one embodiment, a method performed by a user equipment (UE) comprises receiving a first timing advance and a second timing advance, receiving a request for a first uplink transmission according to the first timing advance, and receiving a request for a second uplink transmission according to the second timing advance, wherein the first uplink transmission and the second uplink transmission at least partially overlap in time. The method further comprises dropping at least part of the first uplink transmission or at least part of the second uplink transmission. In this manner, the possibility of collision of uplink transmissions (e.g., to multiple Transmission and Reception Points (TRPs)) may be reduced and thus the uplink resource utilization may be improved.

## Claims

### Claim 1

A method performed by a user equipment (UE), the method comprising:
receiving a first timing advance and a second timing advance;
receiving a request for a first uplink transmission according to the first timing advance;
receiving a request for a second uplink transmission according to the second timing advance, wherein the first uplink transmission and the second uplink transmission at least partially overlap in time; and
dropping at least part of the first uplink transmission or at least part of the second uplink transmission.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first uplink transmission and the second uplink transmission are part of a multi-Transmission and Reception Point (TRP) uplink transmission.

### Claim 3 (depends on 2)

The method of claim 2, wherein:
the request for the first uplink transmission is a first Downlink Control Information (DCI) carried by a first Physical Downlink Control Channel (PDCCH) in a first Control Resource Set (CORESET; and
the request for the second uplink transmission is a second DCI carried by a second PDCCH in a second CORESET.

### Claim 4 (depends on 3)

The method of claim 3, wherein the first CORESET is associated to a first CORESET pool index value and the second CORESET is associated to a second CORESET pool index value, wherein the first and the second CORESET pool index values are different.

### Claim 5 (depends on 1)

The method of a claim 1, wherein the first timing advance is associated to a first Timing Advance Group (TAG) and the second timing advance is associated to a second TAG.

### Claim 6 (depends on 1)

The method of claim 1, wherein the first uplink transmission is in a first time slot, and the second transmission is in a second time slot that is adjacent in time to the first time slot.

### Claim 7 (depends on 6)

The method of claim 6, wherein the first uplink transmission and the second uplink transmission at least partially overlap in time as a result of the first timing advance and the second timing advance.

### Claim 8 (depends on 7)

The method of claim 7, wherein the first timing advance is different than the second timing advance.

### Claim at position 9

-14. (canceled)

### Claim 15 (depends on 1)

The method of claim 1, wherein first and second uplink transmissions are one or more of:
a Physical Uplink Shared Channel (PUSCH) transmission;
a Physical Uplink Control Channel (PUCCH) transmission; and
a Sounding Reference Signal (SRS) transmission.

### Claim 16

A user equipment (UE) adapted to:
receive a first timing advance and a second timing advance;
receive a request for a first uplink transmission according to the first timing advance;
receive a request for a second uplink transmission according to the second timing advance, wherein the first uplink transmission and the second uplink transmission at least partially overlap in time; and
drop at least part of the first uplink transmission or at least part of the second uplink transmission.

### Claim at position 12

-26. (canceled)

### Claim 27

A method performed by network node for scheduling a first uplink transmission from User Equipment (UE) to a first Transmission and Reception Point (TRP) with a first timing advance in a first time slot and a second uplink transmission to a second TRP with a second timing advance in a second time slot, wherein the first and the second slots are adjacent slots, the method comprising:
determining an overlap in time between the first and second uplink transmissions by assuming that each of the first and second transmission were scheduled in a full slot; and
performing uplink scheduling by adjusting at least one of a start and length of at least one of the first and second uplink transmissions such that the overlap, in time, between the first and second uplink transmissions from the UE is avoided.

### Claim 28 (depends on 27)

The method of claim 27, wherein performing uplink scheduling comprises refraining to schedule an uplink transmission from the UE to one of the first and second TRPs in a time duration in which the uplink transmission from the UE to the one of the first and second TRPs would overlap an uplink transmission scheduled from the UE to the other of the first and second TRPs.

### Claim at position 15

-32. (canceled)

### Claim 33

A network node for scheduling a first uplink transmission from User Equipment (UE) to a first Transmission and Reception Point (TRP) with a first timing advance in a first time slot and a second uplink transmission to a second TRP with a second timing advance in a second time slot, wherein the first and the second slots are adjacent slots, the network node adapted to:
determine an overlap in time between the first and second uplink transmissions by assuming that each of the first and second transmission were scheduled in a full slot; and
perform uplink scheduling by adjusting at least one of a start and length of at least one of the first and second uplink transmissions such that the overlap, in time, between the first and second uplink transmissions from the UE is avoided.

### Claim 34 (depends on 33)

The network node of claim 33, wherein perform uplink scheduling comprises refrain to schedule an uplink transmission from the UE to one of the first and second TRPs in a time duration in which the uplink transmission from the UE to the one of the first and second TRPs would overlap an uplink transmission scheduled from the UE to the other of the first and second TRPs.

### Claim at position 18

-36. (canceled)
