# US 2026/0100850 A1 · Real time load and energy management of distributed energy resources

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0100850 A1
- Document ID: US20260100850A1
- Status: Published application
- Kind: A1
- Application number: 19/280,069
- Filed: 2025-07-24
- Published: 2026-04-09
- Earliest claimed: 2024-10-04
- Assignees: Itron, Inc.
- Applicants: Itron, Inc.
- Inventors: Sasha Yegorov; Michael Ting; Jeffrey Scott Bailey
- Web page: https://patentgrep.com/patent/US20260100850A1

## CPC

- H04L 9/3263: {involving certificates, e.g. public key certificate [PKC] or attribute certificate [AC]; Public key infrastructure [PKI] arrangements (network architectures or network communication protocols for supporting authentication of entities using certificates in a packet data network H04L63/0823)}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Techniques for allocating a load capacity to on-site smart sensors coupled to distributed energy resources (DERs) are described herein. For example, a management application may include load limiting logic configured to monitor total load at a site periodically (e.g., at 1 second intervals). In some examples, when an EV charging session is initiated by a customer, the management application may determine a total site load relative to a maximum EV charging load. In response to the total site load exceeding a threshold, such as a rated capacity of the service panel, the management application may throttle the EV charging load such that total site load stays below the threshold (e.g., within rated capacity). In some cases, in response to the total premise load declining below the threshold, the management application may increase the EV charging limit.

## Claims

### Claim 1

A method comprising:
connecting to a WI-FI network gateway at a location;
receiving, via an application stored on a smart utility meter and the WI-FI network gateway, a multicast domain name system (mDNS) query from an electric vehicle supply equipment (EVSE) located at the location;
sending a confirmation message to the EVSE indicating service information associated with the smart utility meter;
establishing a secure connection with the EVSE based at least in part on the service information; and
providing a utility resource to the EVSE based at least in part on establishing the secure connection.

### Claim 2 (depends on 1)

The method of claim 1, wherein the confirmation message includes at least one of a pointer record (PTR), a service record (SRV), a text record (TXT), or an address record (A).

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
receiving a client certificate and a trust anchor from the EVSE;
validating the client certificate based at least in part on determining that the client certificate includes a signature by the trust anchor and determining that the trust anchor can be trusted; and
establishing the secure connection with the EVSE based at least in part on the client certificate corresponding with a trust root certificate accessible by the application.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
receiving, via the application and from a utility service provider, a maximum load constraint associated with the EVSE; and
sending the maximum load constraint associated with the EVSE to the EVSE.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
receiving, via the application and from the utility service provider, the maximum load constraint associated with the location;
determining a current total load usage at the location;
comparing the maximum load constraint associated with the location to the maximum load constraint associated with the EVSE;
in response to determining that the maximum load constraint associated with the EVSE exceeds the maximum load constraint associated with the location, reducing a charging load of the EVSE such that current total load stays within the maximum load constraint associated with the location; and
in response to determining that the maximum load constraint associated with the EVSE does not exceed the maximum load constraint associated with the location, increasing the charging load of the EVSE such that current total load stays within the maximum load constraint associated with the location.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
determining that the smart utility meter has lost the secure connection with the EVSE; and
sending a notification to a utility service provider that the EVSE has lost the secure connection with the smart utility meter.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
determining that the EVSE is performing a charging transaction;
determining an updated maximum load constraint associated with the EVSE; and
sending the updated maximum load constraint associated with the EVSE to the EVSE during the charging transaction.

### Claim 8

A method comprising:
receiving, via an application and from a utility service provider, a maximum load constraint associated with a location;
determining a current total load usage at the location; and
determining if the current load usage is below the maximum load constraint, wherein:
in response to the current load usage being above the maximum load constraint, reducing a charging load of an EVSE such that current total load stays within the maximum load constraint associated with the location; or
in response to the current load usage being at or below the maximum load constraint, increasing the charging load of the EVSE.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
receiving a real time indication from the EVSE that the EVSE is performing a transfer of energy to an EV and consuming energy from site;
determining if an amount of energy being consumed is above an expected energy consumption;
in response to the energy being consumed being above the expected energy consumption, generating an updated maximum load constraint associated with the EVSE; and
sending the updated maximum load constraint associated with the EVSE to the EVSE.

### Claim 10 (depends on 8)

The method of claim 8, further comprising:
connecting, via a smart utility meter, to a WI-FI network gateway at the location;
receiving, via an application stored on the smart utility meter and the WI-FI network gateway, a multicast domain name system (mDNS) query from the EVSE at the location;
sending, via the smart utility meter, a confirmation message to the EVSE indicating service information associated with the smart utility meter;
establishing, via the smart utility meter, a secure connection with the EVSE based at least in part on the service information; and
providing, via the smart utility meter, a utility resource to the EVSE based at least in part on establishing the secure connection.

### Claim 11 (depends on 10)

The method of claim 10, wherein the confirmation message includes at least one of a PTR, SRV, TXT, or A records.

### Claim 12 (depends on 8)

The method of claim 8, further comprising:
receiving a client certificate and a trust anchor from the EVSE;
validating the client certificate based at least in part on determining that the client certificate includes a signature by the trust anchor and that the trust anchor is a trusted anchor; and
establishing a secure connection with the EVSE based at least in part on the client certificate corresponding with a trust root certificate.

### Claim 13 (depends on 8)

The method of claim 8, further comprising:
determining that a smart utility meter has lost a secure connection with the EVSE; and
sending a notification to a utility service provider that the EVSE has lost the secure connection with the smart utility meter.

### Claim 14 (depends on 8)

The method of claim 8, further comprising:
determining that the EVSE is performing a charging transaction;
determining an updated maximum load constraint associated with the EVSE; and
sending the updated maximum load constraint associated with the EVSE to the EVSE during the charging transaction.

### Claim 15 (depends on 14)

The method of claim 14, wherein the updated maximum load constraint is received from at least one of a utility supplier or a neighboring smart utility meter.

### Claim 16

A smart utility meter comprising:
one or more processors; and
memory communicatively coupled to the one or more processors, the memory storing thereon computer executable instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
connecting to a WI-FI network gateway at a location;
receiving, via an application and the WI-FI network gateway, a multicast domain name system (mDNS) query from an electric vehicle supply equipment (EVSE) located at the location;
sending a confirmation message to EVSE indicating service information associated with the smart utility meter;
establishing a secure connection with the EVSE based at least in part on the service information; and
providing a utility resource to the EVSE based at least in part on establishing the secure connection.

### Claim 17 (depends on 16)

The smart utility meter of claim 16, the operations further comprising:
receiving a client certificate and a trust anchor from the EVSE;
validating the client certificate based at least in part on determining that the client certificate includes a signature by the trust anchor and that the trust anchor is a trusted anchor; and
establishing the secure connection with the EVSE based at least in part on the client certificate corresponding with a trust root certificate accessible by the application.

### Claim 18 (depends on 16)

The smart utility meter of claim 16, the operations further comprising:
receiving, via the application and from a utility service provider, a maximum load constraint associated with the EVSE; and
sending the maximum load constraint associated with the EVSE to the EVSE.

### Claim 19 (depends on 18)

The smart utility meter of claim 18, the operations further comprising:
receiving, via the application and from the utility service provider, the maximum load constraint associated with the location;
determining a current total load usage at the location;
comparing the maximum load constraint associated with the location to the maximum load constraint associated with the EVSE;
in response to determining that the maximum load constraint associated with the EVSE exceeds the maximum load constraint associated with the location, reducing a charging load of the EVSE such that current total load stays within the maximum load constraint associated with the location; and
in response to determining that the maximum load constraint associated with the EVSE does not exceed the maximum load constraint associated with the location, increasing the charging load of the EVSE such that current total load stays within the maximum load constraint associated with the location.

### Claim 20 (depends on 16)

The smart utility meter of claim 16, the operations further comprising:
determining that the smart utility meter has lost the secure connection with the EVSE; and
sending a notification to a utility service provider that the EVSE has lost the secure connection with the smart utility meter.

### Claim 21

A smart utility meter comprising:
one or more processors; and
memory communicatively coupled to the one or more processors, the memory storing thereon computer executable instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
determining a current total load usage at the location; and
determining if the current load usage is below the maximum load constraint, wherein:
in response to the current load usage being above the maximum load constraint, reducing a charging load of an EVSE such that current total load stays within the maximum load constraint associated with the location; or
in response to the current load usage being at or below the maximum load constraint, increasing the charging load of the EVSE.

### Claim 22 (depends on 21)

The smart utility meter of claim 21, the operations further comprising:
receiving a real time indication from the EVSE that the EVSE is performing a transfer of energy to an EV and consuming energy from site;
determining if an amount of energy being consumed is above an expected energy consumption;
in response to the energy being consumed being above an expected energy consumption, generating an updated maximum load constraint associated with the EVSE; and
sending the updated maximum load constraint associated with the EVSE to the EVSE.

### Claim 23 (depends on 21)

The smart utility meter of claim 21, the operations further comprising:
connecting to a WI-FI network gateway at the location;
receiving, via an application stored on the smart utility meter and the WI-FI network gateway, a multicast domain name system (mDNS) query from the EVSE at the location;
sending a confirmation message to the EVSE indicating service information associated with the smart utility meter;
establishing a secure connection with the EVSE based at least in part on the service information; and
providing a utility resource to the EVSE based at least in part on establishing the secure connection.

### Claim 24 (depends on 21)

The smart utility meter of claim 21, wherein the confirmation message includes at least one of a PTR, SRV, TXT, or A records.

### Claim 25 (depends on 21)

The smart utility meter of claim 21, the operations further comprising:
receiving a client certificate and a trust anchor from the EVSE;
validating the client certificate based at least in part on determining that the client certificate includes a signature by the trust anchor and that the trust anchor is a trusted anchor; and
establishing a secure connection with the EVSE based at least in part on the client certificate corresponding with a trust root certificate.
