# US 2026/0100632 A1 · Method and controller for controlling a power converter in a power transmission network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0100632 A1
- Document ID: US20260100632A1
- Status: Published application
- Kind: A1
- Application number: 19/332,402
- Filed: 2025-09-18
- Published: 2026-04-09
- Earliest claimed: 2024-10-07
- Assignees: GE Vernova Infrastructure Technology LLC
- Applicants: GE Vernova Infrastructure Technology LLC
- Inventors: Colin DAVIDSON; Timothy STOTT
- Web page: https://patentgrep.com/patent/US20260100632A1

## CPC

- H02M 1/0029: {Circuits or arrangements for limiting the slope of switching signals, e.g. slew rate}
- H02M 7/4835: {comprising two or more cells, each including a switchable capacitor, the capacitors having a nominal charge voltage which corresponds to a given fraction of the input voltage, and the capacitors being selectively connected in series to determine the instantaneous output voltage}
- H02M 1/0009: {Devices or circuits for detecting current in a converter}
- H02M 1/0012: {Control circuits using digital or numerical techniques (in DC/DC converters H02M3/157, H02M3/33515; in DC-AC converters H02M7/53873)}
- H02M 1/0019: {the disturbance parameters being load current fluctuations}
- H02M 1/0043: {Converters switched with a phase shift, i.e. interleaved (non-isolated DC/DC converters H02M3/1586)}
- H02M 1/44: Circuits or arrangements for compensating for electromagnetic interference in converters or inverters
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)

## Abstract

There is provided a method, and a controller, for controlling a number of submodules in a valve of a power converter, the method including: determining, by a controller, a first switching time for a first submodule of the submodules; determining, by the controller, a second switching time for a second submodule of the submodules, wherein the first switching time differs from the second switching time by a time difference; wherein the time difference is based on a property of resonance in the power converter, wherein the resonance in the power converter is that caused by switching at least one submodule of the submodules in the valve; and providing, by the controller, one or more switching commands to the valve to cause the first submodule to switch at the first switching time and the second submodule to switch at the second switching time.

## Claims

### Claim 1

A method for controlling a plurality of submodules in a valve of a power converter, the method comprising:
determining, by a controller, a first switching time for a first submodule of the plurality of submodules;
determining, by the controller, a second switching time for a second submodule of the plurality of submodules, wherein the first switching time differs from the second switching time by a time difference;
wherein the time difference is based on a property of resonance in the power converter, wherein the resonance in the power converter is that caused by switching at least one submodule of the plurality of submodules in the valve; and
providing, by the controller, one or more switching commands to the valve to cause the first submodule to switch at the first switching time and the second submodule to switch at the second switching time.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
acquiring, by the controller, information which specifies respective switching times for selected submodules of the plurality of submodules which are to be switched, within a time period, in order to control the output voltage of the valve;
pairing, by the controller, substantially each of the selected submodules into pairs, wherein each submodule pair comprises a respective first submodule and a respective second submodule;
wherein the step of determining the first switching time comprises acquiring, by the controller, from the information, a respective first switching time for each of the first submodules;
wherein the step of determining the second switching time is performed for each of the second submodules; and
wherein the providing step comprises providing, by the controller, respective switching commands to the valve, to cause the respective first submodules and the respective second submodules to switch at their respective switching times.

### Claim 3 (depends on 2)

The method of claim 2, wherein the step of acquiring the information comprises:
determining, by the controller, the selected submodules of the plurality of submodules based on a voltage demand; and
determining, by the controller, the respective switching times for the selected submodules, wherein the respective switching times are different switching times with the time period.

### Claim 4 (depends on 1)

The method of claim 1, wherein the step of providing respective switching commands to the valve comprises:
providing respective first switching commands for each of the first submodules at the respective first switching times, and providing respective second switching commands for each of the second submodules at the respective second switching times.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
determining, by the controller, the time difference such that a resonance in the power converter caused by switching the second submodule destructively interferes, at least to some extent, with a resonance in the power converter caused by switching the first submodule.

### Claim 6 (depends on 1)

The method of claim 1, wherein the resonance in the power converter induces an oscillating current in the power converter, wherein the oscillating current has a half-cycle time, the method further comprising:
determining, by the controller, the time difference as an odd integer multiple of the half-cycle time.

### Claim 7 (depends on 1)

The method of claim 1, wherein the resonance causes oscillatory current in the power converter at a plurality of frequencies, wherein at least one of the plurality of frequencies is a dominant resonant frequency, the method further comprising:
determining, by the controller, the time difference as an odd integer multiple of a half-cycle time of an oscillating current at the dominant resonant frequency.

### Claim 8 (depends on 5)

The method of claim 5, wherein
the time difference is determined during a commissioning stage or setup process of the power converter; and/or
the time difference is determined during an operation of the power converter.

### Claim 9 (depends on 1)

The method of claim 1, wherein the resonance causes oscillatory current in the power converter at a plurality of frequencies, the method further comprising:
determining, by the controller, a dominant resonant frequency of the resonance in the power converter.

### Claim 10 (depends on 9)

The method of claim 9, wherein determining the dominant resonant frequency comprises:
providing, by the controller, a test switching command to a submodule of the plurality of submodules to test switch that submodule;
measuring, by the controller, a current in the valve, wherein at least a part of the current is an oscillatory current caused by resonance induced by the test switching of the submodule; and
calculating, by the controller, the dominant resonant frequency by analysing the measured current in the valve.

### Claim 11 (depends on 9)

The method of claim 9, wherein determining the dominant resonant frequency comprises:
providing, by the controller, multiple switching commands to the plurality of submodules to switch multiple submodules;
measuring, by the controller, a current in the valve over an integration time, wherein at least a part of the current is an oscillatory current caused by resonance induced by the switching of the multiple submodules;
calculating, by the controller, a Fast Fourier Transform of the measured current; and
determining, by the controller, a dominant frequency component of the Fast Fourier Transform.

### Claim 12 (depends on 10)

The method of claim 10, wherein the current comprises a frequency component equal to or greater than 100 kHz.

### Claim 13 (depends on 1)

The method of claim 1, further comprising iteratively performing steps 1 to 4 at least until a measured current value is below a threshold value, wherein:
step 1 comprises providing, by the controller, an initial first switching command at an initial first switching time to an initial first submodule of the plurality of submodules, and an initial second switching command at an initial second switching time to an initial second submodule of the plurality of submodules, wherein the initial first switching time differs from the initial second switching time by an initial time difference, wherein the initial time difference is based on the property of resonance in the power converter;
step 2 comprises measuring, by the controller, a current in the power converter, wherein the current is a result of switching the initial first submodule and the initial second submodule at the respective initial switching times;
step 3 comprises comparing, by the controller, the measured current to the threshold value, and, in response to the measured current exceeding the threshold value, altering, by the controller, the initial time difference to an updated time difference; and
step 4 comprises setting, by the controller, the initial time difference to the updated time difference.

### Claim 14

A controller for controlling a plurality of submodules in a valve of a power converter, the controller configured to:
determine a first switching time for a first submodule of the plurality of submodules;
determine a second switching time for a second submodule of the plurality of submodules, wherein the first switching time differs from the second switching time by a time difference;
wherein the time difference is based on a property of resonance in the power converter, wherein the resonance in the power converter is that caused by switching at least one submodule of the plurality of submodules in the valve; and
provide one or more switching commands to the valve to cause the first submodule to switch at the first switching time and the second submodule to switch at the second switching time.

### Claim 15 (depends on 14)

The controller of claim 14, wherein the controller is further configured to:
acquire information which specifies respective switching times for selected submodules of the plurality of submodules which are to be switched, within a time period, in order to control the output voltage of the valve;
pair substantially each of the selected submodules into pairs, wherein each submodule pair comprises a respective first submodule and a respective second submodule;
acquire, from the information, a respective first switching time for each of the first submodules;
determine the second switching time for each of the second submodules; and
provide respective switching commands to the valve, at the respective first switching times and second switching times, to cause the respective first submodules and the respective second submodules to switch at their respective switching times.