# US 2026/0099797 A1 · Battery-powered work machine downtime analysis

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0099797 A1
- Document ID: US20260099797A1
- Status: Published application
- Kind: A1
- Application number: 18/908,660
- Filed: 2024-10-07
- Published: 2026-04-09
- Earliest claimed: 2024-10-07
- Assignees: Caterpillar Inc.
- Applicants: Caterpillar Inc.
- Inventors: Eric Wade CLER; Adam Gavin KRAMER; Joshua L. FREEMAN
- Web page: https://patentgrep.com/patent/US20260099797A1

## CPC

- G06Q 10/06375: {Prediction of business process outcome or impact based on a proposed change}
- G01R 31/382: Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G06Q 50/08: Construction
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

In some implementations, a computing device may receive machine information and operating parameters associated with a battery-powered work machine. The computing device may estimate utilization of the battery-powered work machine based, at least in part, on a workday simulation using the machine information and the operating parameters. The computing device may determine a disruption score that indicates a predicted impact of replacing a diesel-powered work machine with the battery-powered work machine, wherein the disruption score is based, at least in part, on a predicted charging downtime of the battery-powered work machine. The computing device may display, using a user interface of the computing device, a recommendation associated with replacing the diesel-powered work machine with the battery-powered work machine, wherein the recommendation is based, at least in part, on the disruption score.

## Claims

### Claim 1

A method, comprising:
receiving, by a computing device, machine information and operating parameters associated with a battery-powered work machine;
estimating, by the computing device, utilization of the battery-powered work machine based, at least in part, on a workday simulation using the machine information and the operating parameters;
determining, by the computing device, a disruption score that indicates a predicted impact of replacing a diesel-powered work machine with the battery-powered work machine,
wherein the disruption score is based, at least in part, on a predicted charging downtime of the battery-powered work machine; and
displaying, using a user interface of the computing device, a recommendation associated with replacing the diesel-powered work machine with the battery-powered work machine, wherein the recommendation is based, at least in part, on the disruption score.

### Claim 2 (depends on 1)

The method of claim 1, wherein estimating the utilization of the battery-powered work machine includes:
determining a battery discharge rate having at least a first battery state of charge and a second battery state of charge;
comparing the first battery state of charge to a first threshold; and
comparing the second battery state of charge to a second threshold.

### Claim 3 (depends on 1)

The method of claim 1, wherein estimating the utilization of the battery-powered work machine includes estimating a work period in accordance with a battery discharge rate.

### Claim 4 (depends on 1)

The method of claim 1, wherein estimating the utilization of the battery-powered work machine includes:
identifying one or more charging opportunities; and
determining a battery discharge rate in accordance with the one or more charging opportunities.

### Claim 5 (depends on 4)

The method of claim 4, wherein identifying the one or more charging opportunities includes:
estimating a length of an idle period;
comparing the length of the idle period to an opportunity charge threshold; and
identifying the one or more charging opportunities as a result of the length of the idle period being greater than the opportunity charge threshold.

### Claim 6 (depends on 1)

The method of claim 1, wherein determining the disruption score includes:
estimating a driving time overhead in accordance with a machine speed and a charger distance; and
determining the disruption score in accordance with the driving time overhead.

### Claim 7 (depends on 1)

The method of claim 1, wherein determining the disruption score includes:
estimating an energy usage overhead in accordance with a driving time and an average power consumption; and
determining the disruption score in accordance with the energy usage overhead.

### Claim 8 (depends on 1)

The method of claim 1, wherein determining the disruption score includes:
estimating a charge event overhead in accordance with an amount of time associated with initiating and ending charging of the battery-powered work machine; and
determining the disruption score in accordance with the charge event overhead.

### Claim 9 (depends on 1)

The method of claim 1, wherein the operating parameters include one or more of a battery capacity, a battery health, charger information, a charge threshold, a utilization metric, or a specific fuel consumption ratio.

### Claim 10 (depends on 1)

The method of claim 1, wherein the machine information includes one or more of a ground speed, a fuel rate, or position information.

### Claim 11

A computing device, comprising:
a user interface having a display screen;
one or more memories; and
one or more processors, communicatively coupled to the one or more memories, configured to:
receive machine information and operating parameters associated with a battery-powered work machine;
estimate utilization of the battery-powered work machine based, at least in part, on a workday simulation using the machine information and the operating parameters;
determine a disruption score indicating a predicted impact of replacing a diesel-powered work machine with the battery-powered work machine,
wherein the disruption score is based, at least in part, on a predicted charging downtime of the battery-powered work machine; and
output, to the display screen, a recommendation associated with replacing the diesel-powered work machine with the battery-powered work machine, wherein the recommendation is based, at least in part, on the disruption score.

### Claim 12 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to estimate the utilization of the battery-powered work machine by:
determining a battery discharge rate having at least a first battery state of charge and a second battery state of charge;
comparing the first battery state of charge to a first threshold; and
comparing the second battery state of charge to a second threshold.

### Claim 13 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to estimate the utilization of the battery-powered work machine by estimating a work period in accordance with a battery discharge rate.

### Claim 14 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to estimate the utilization of the battery-powered work machine by:
identifying one or more charging opportunities; and
determining a battery discharge rate in accordance with the one or more charging opportunities,
wherein the one or more processors are configured to identify the one or more charging opportunities by:
estimating a length of an idle period;
comparing the length of the idle period to an opportunity charge threshold; and
identifying the one or more charging opportunities as a result of the length of the idle period being greater than the opportunity charge threshold.

### Claim 15 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to determine the disruption score by:
estimating a driving time overhead in accordance with a machine speed and a charger distance; and
determining the disruption score in accordance with the driving time overhead.

### Claim 16 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to determine the disruption score by:
estimating an energy usage overhead in accordance with a driving time and an average power consumption; and
determining the disruption score in accordance with the energy usage overhead.

### Claim 17 (depends on 11)

The computing device of claim 11, wherein the one or more processors are configured to determine the disruption score by:
estimating a charge event overhead in accordance with an amount of time associated with initiating and ending charging of the battery-powered work machine; and
determining the disruption score in accordance with the charge event overhead.

### Claim 18 (depends on 11)

The computing device of claim 11, wherein the operating parameters include one or more of a battery capacity, a battery health, charger information, a charge threshold, a utilization metric, or a specific fuel consumption ratio.

### Claim 19 (depends on 11)

The computing device of claim 11, wherein the machine information includes one or more of a ground speed, a fuel rate, or position information.

### Claim 20

A computing device, comprising:
a user interface having a display screen;
one or more memories; and
one or more processors, communicatively coupled to the one or more memories, configured to:
receive machine information and operating parameters associated with one or more battery-powered work machines;
estimate utilization of the one or more battery-powered work machines based, at least in part, on a workday simulation using the machine information and the operating parameters;
determine a charger load based, at least in part, on the workday simulation and utilization of the one or more battery-powered work machines,
wherein the charger load is based, at least in part, on a predicted charging time of each of the one or more battery-powered work machines; and
output, to the display screen, a recommendation associated with the one or more battery-powered work machines, wherein the recommendation is based, at least in part, on the charger load.