# US 2026/0099344 A1 · Cloud clipboard implementation method, device, system and storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0099344 A1
- Document ID: US20260099344A1
- Status: Published application
- Kind: A1
- Application number: 19/113,665
- Filed: 2023-09-19
- Published: 2026-04-09
- Earliest claimed: 2022-09-20
- Assignees: Hangzhou Alicloud Feitian Information Technology Co., Ltd.
- Applicants: Hangzhou Alicloud Feitian Information Technology Co., Ltd.
- Inventors: Xu ZHANG; Yixin ZHENG
- Web page: https://patentgrep.com/patent/US20260099344A1

## CPC

- G06F 9/451: Execution arrangements for user interfaces
- G06F 9/48: Program initiating; Program switching, e.g. by interrupt
- G06F 9/5027: {the resource being a machine, e.g. CPUs, Servers, Terminals}
- G06F 9/54: Interprogram communication
- G06F 9/542: {Event management; Broadcasting; Multicasting; Notifications}
- G06F 9/543: {User-generated data transfer, e.g. clipboards, dynamic data exchange [DDE], object linking and embedding [OLE]}
- G06F 9/546: {Message passing systems or structures, e.g. queues}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Embodiments of the present application provide a cloud clipboard implementation method, device, system and storage medium. A global transit center is used to connect multiple working parties in the user workspace, which can realize global accessibility in the cloud office environment, and a user can carry out information and data interaction in its workspace without obstacles, which makes the diverse working parties in the user workspace accessible to each other without obstacles. A centrally-deployed cloud clipboard management and control center is also provided, which is responsible for broadcasting the first event information provided by a working party where a cutting/copying event occurs to other working parties in the user workspace through the global transit center, and is responsible for coordinating the copying of relevant data through the global transit center under the trigger of the working party where the pasting event occurs.

## Claims

### Claim 1

A cloud clipboard system, comprising a cloud clipboard management and control center and a plurality of working parties in a user workspace, wherein the plurality of working parties are accessible to each other through a global transit center;
a first working party in the plurality of working parties, configured to send first event information to the cloud clipboard management and control center through the global transit center in a case that a cutting/copying event which occurs in itself is monitored;
a second working party in the plurality of working parties, configured to send second event information to the cloud clipboard management and control center through the global transit center in a case that a pasting event which occurs in itself is motored after receiving the first event information;
the cloud clipboard management and control center, configured to push received first event information to other working parties except the first working party in the user workspace through the global transit center; in a case that the second event information is received, use the global transit center to copy relevant data in the first working party to the second working party for the second working party to complete pasting;
wherein types of the working parties comprise a physical terminal and/or a cloud instance.

### Claim 2 (depends on 1)

The system according to claim 1, wherein a cloud clipboard proxy service is deployed in the working party, and if the working party is a cloud instance, the process for the working party to monitor a cutting/copying event and a pasting event occurring in itself comprises:
receiving operation data synchronized by an interface display terminal connected with the working party, wherein the operation data is generated by a user manipulating peripherals of the interface display terminal, and the interface display terminal is the physical terminal;
in case that the cloud clipboard proxy service perceives that the operation data comprises cutting/copying behavior data, determining that the cutting/copying event occurs in the working party;
in a case that the cloud clipboard proxy service perceives that the operation data comprises pasting behavior data, determining that the pasting event occurs in the working party.

### Claim 3 (depends on 2)

The system according to claim 2, wherein if the first working party is the physical terminal, the second working party is the cloud instance, and the first working party serves as the interface display terminal of the second working party, the first working party is configured for:
sending first event information to the cloud clipboard management and control center through the global transit center to push the first event information to the second working party in a case of monitoring that the user performs a cutting/copying behavior outside the display interface of the second working party through its a peripheral;
in the case of monitoring that the user performs a pasting behavior within the display interface of the second working party through it's a peripheral, synchronizing the operation data comprising pasting behavior data to the second working party, so that the second working party monitors the pasting event that occurs in itself and triggers the pasting of the local data of the first working party into the second working party by sending the second event information to the cloud clipboard management and control center.

### Claim 4 (depends on 1)

The system according to claim 1, wherein in the process of sending the first event information to the cloud clipboard management and control center through the global transit center, the first working party is configured for:
sending the first event information to a message queue under a first message topic associated with the first working party to transmit the first event information to the global transit center, where the global transit center has subscribed to the first message topic;
in the process of pushing the received first event information to other working parties except the first working party in the user workspace through the global transit center, the cloud clipboard management and control center is configured for:
generating routing information for the other working parties in the user workspace and providing the routing information to the global transit center;
using the global transit center to route the first event information to the message queue under the message topic associated with other working parties according to the routing information, so that the other working parties receive the first event information in a manner of subscribing to the message topic.

### Claim 5 (depends on 4)

The system according to claim 4, message topics are respectively deployed in different regions, the working parties are associated with the message topics deployed in regions where the working parties are located, and the plurality of working parties are distributed in regions not exactly the same.

### Claim 6 (depends on 1)

The system according to claim 1, wherein the second working party is further configured for:
starting a callback function for the pasting event after receiving the first event information;
triggering the callback function to generate the second event information under a condition that the pasting event which occurs in itself is monitored.

### Claim 7 (depends on 1)

The system according to claim 1, in a case that the second event information is received, in a process of using the global transit center to copy the relevant data in the first working party to the second working party, the cloud clipboard management and control center is configured for:
sending a data upload instruction to the first working party through the global transit center to trigger the first working party to write the relevant data into its associated first storage location;
copying the relevant data in the first storage location to a second storage location associated with the second working party through the global transit center;
sending a data download instruction to the second working party through the global transit center to trigger the second working party to download the relevant data from its associated second storage location.

### Claim 8 (depends on 7)

The system according to claim 7, wherein the first storage location is an object storage OSS area set in the region where the first working party is located or a message queue under the first message topic associated with the first working party; the second storage location is an object storage OSS area set in the region where the second working party is located or a message queue under a second message topic associated with the second working party.

### Claim 9 (depends on 8)

The system according to claim 8, wherein the first working party is further configured for:
if a specification of the relevant data of cutting/copying event which occurs in itself is less than a preset standard, writing the relevant data into the message queue under the first message topic associated with the first working party in response to the data upload instruction, so as to transfer the relevant data to the message queue under the second message topic associated with the second working party through the cloud clipboard management and control center and the global transit center;
if the specification of the relevant data of cutting/copying event occurs in itself is not less than the preset standard, writing the relevant data into a first OSS area associated with the first working party in response to the data upload instruction, so as to trigger the first OSS area to copy the relevant data into a second OSS area associated with the second working party through the global transit center.

### Claim 10 (depends on 7)

The system according to claim 7, wherein the global transit center is further used for: sending upload record information of the relevant data to the cloud clipboard management and control center;
the cloud clipboard management and control center is further configured for: upon receiving the second event information, determining whether there is upload record information in the relevant data corresponding to the second event information, and if yes, skip sending the data upload instruction to the first working party.

### Claim 11

A cloud clipboard implementation method, applied to a cloud clipboard management and control device in a cloud clipboard system, wherein the cloud clipboard system further comprises a plurality of working parties in a user workspace, and the plurality of working parties are accessible to each other through a global transit center, the method comprises the following steps:
receiving first event information sent by a first working party of the plurality of working parties through the global transit center, wherein the first event information is sent by the first working party under a condition that a cutting/copying event which occurs in itself is monitored;
pushing the received first event information to other working parties except the first working party in the user workspace through the global transit center;
receiving second event information sent by a second working party of the plurality of working parties through the global transit center, wherein the second event information is sent by the second working party under a condition that a pasting event which occurs in itself is monitored;
in a case of receiving the second event information, using the global transit center to copy the relevant data in the first working party to the second working party for the second working party to complete pasting;
wherein, types of the working parties include a physical terminal and/or a cloud instance.

### Claim 12

A cloud clipboard implementation method, applied to a plurality of working parties in a user workspace of a cloud clipboard system, wherein the plurality of working parties are accessible to each other through a global transit center, and the cloud clipboard system further comprises a cloud clipboard management and control device, the method comprises the following steps:
sending first event information to a cloud clipboard management and control center through the global transit center under a condition that a cutting/copying event which occurs in itself is monitored, so that the cloud clipboard management and control center pushes received first event information to other working parties in the user workspace through the global transit center;
using the cloud clipboard management and control center and the global transit center to provide relevant data corresponding to the first event information to a working party in the user workspace where a pasting event occurs, so as to complete the pasting;
sending second event information to the cloud clipboard management and control center through the global transit center under a condition that the pasting event which occurs in itself is monitored, so that the cloud clipboard management and control center copy the relevant data of the working party in the user workspace where the cutting/copying event occurs to the current working party to complete pasting;
wherein, types of the working parties comprise a physical terminal and/or a cloud instance.

### Claim 13 (depends on 11)

A cloud clipboard management and control device, comprising a memory, a processor and a communication component;
the memory is used for storing one or more computer instructions;
the processor is coupled with the memory and the communication component for executing the one or more computer instructions to implement the method according to claim 11.

### Claim 14 (depends on 12)

A computing device comprising a memory, a processor and a communication component;
the memory is used for storing one or more computer instructions;
the processor is coupled with the memory and the communication component for executing the one or more computer instructions to implement the method according to claim 12.

### Claim 15 (depends on 11)

A non-transitory computer-readable storage medium storing computer instructions which, when executed by one or more processors, cause the one or more processors to execute the cloud clipboard implementation method according to claim 11.

### Claim 16 (depends on 12)

A non-transitory computer-readable storage medium storing computer instructions which, when executed by one or more processors, cause the one or more processors to execute the cloud clipboard implementation method according to claim 12.

### Claim 17 (depends on 11)

The cloud clipboard implementation method according to claim 11, the pushing the received first event information to other working parties except the first working party in the user workspace through the global transit center specifically comprises:
generating routing information for the other working parties in the user workspace and providing the routing information to the global transit center;
using the global transit center to route the first event information to the message queue under the message topic associated with other working parties according to the routing information, so that the other working parties receive the first event information in a manner of subscribing to the message topic.

### Claim 18 (depends on 11)

The cloud clipboard implementation method according to claim 11, wherein in a case that the second event information is received, the process of using the global transit center to copy the relevant data in the first working party to the second working party comprises:
sending a data upload instruction to the first working party through the global transit center to trigger the first working party to write the relevant data into its associated first storage location;
copying the relevant data in the first storage location to a second storage location associated with the second working party through the global transit center;
sending a data download instruction to the second working party through the global transit center to trigger the second working party to download the relevant data from its associated second storage location.

### Claim 19 (depends on 12)

The cloud clipboard implementation method according to claim 12, wherein a cloud clipboard proxy service is deployed in the working party, and if the working party is a cloud instance, the process for the working party to monitor a cutting/copying event and a pasting event occurring in itself comprises:
receiving operation data synchronized by an interface display terminal connected with the working party, wherein the operation data is generated by a user manipulating peripherals of the interface display terminal, and the interface display terminal is the physical terminal;
in case that the cloud clipboard proxy service perceives that the operation data comprises cutting/copying behavior data, determining that the cutting/copying event occurs in the working party;
in a case that the cloud clipboard proxy service perceives that the operation data comprises pasting behavior data, determining that the pasting event occurs in the working party.

### Claim 20 (depends on 12)

The cloud clipboard implementation method according to claim 12, wherein if the first working party is the physical terminal, the second working party is the cloud instance, and the first working party serves as the interface display terminal of the second working party, the first working party is configured for:
sending first event information to the cloud clipboard management and control center through the global transit center to push the first event information to the second working party in a case of monitoring that the user performs a cutting/copying behavior outside the display interface of the second working party through its a peripheral;
in the case of monitoring that the user performs a pasting behavior within the display interface of the second working party through it's a peripheral, synchronizing the operation data comprising pasting behavior data to the second working party, so that the second working party monitors the pasting event that occurs in itself and triggers the pasting of the local data of the first working party into the second working party by sending the second event information to the cloud clipboard management and control center.
