# US 2026/0099165 A1 · Systems and methods for prioritizing power restoration to sites after a power outage

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0099165 A1
- Document ID: US20260099165A1
- Status: Published application
- Kind: A1
- Application number: 19/415,943
- Filed: 2025-12-11
- Published: 2026-04-09
- Earliest claimed: 2022-10-31
- Assignees: Verizon Patent and Licensing Inc.
- Applicants: Verizon Patent and Licensing Inc.
- Inventors: Farid KHAFIZOV; Jean Rosebert BEAUBLANC; Halley David ALLRED; Muhammad IBRAHEEM
- Web page: https://patentgrep.com/patent/US20260099165A1

## CPC

- G05F 1/66: Regulating electric power
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A device may determine a number of user equipments (UEs) connected to an inactive site during a first period of time and determine that the inactive site experienced a power outage during a second period of time. The device may determine that the UEs connected to a set of active sites during the second period of time. The device may determine one or more key performance indicator (KPI) changes to one or more KPIs, during the second period of time, for each of the set of active sites. The device may determine a plurality of weights associated with the inactive site experiencing the power outage; determine a set of impacts, of the inactive site, on the one or more KPI changes for the set of active sites based on the plurality of weights; and cause power to be restored to the inactive site based on the set of impacts.

## Claims

### Claim 1

A method comprising:
identifying a plurality of inactive sites, each with one or more base stations, experiencing a power outage;
determining one or more key performance indicators (KPI) changes to one or more KPIs, during the power outage, for each active site of a set of active sites that are in service;
determining a respective plurality of weights associated with each inactive site of the plurality of active sites experiencing the power outage;
determining a set of impacts for each inactive site on the one or more KPI changes for the set of active sites based on the respective plurality of weights;
and
causing power to be restored to each inactive site in an order that is based on the set of impacts by:
adjusting a magnitude of each impact of the set of impacts; and
causing power to be restored to each inactive site in an order that is based on the adjusted set of impacts.

### Claim 2 (depends on 1)

The method of claim 1, wherein the power outage occurs during a second period of time that follows a first period of time, and
wherein determining the respective plurality of weights comprises:
determining a first number of user equipments (UEs) that were connected to a first inactive site in the plurality of inactive sites during the first period of time and that are connected to a first active site of the set of active sites during the second period of time;
determining a second number of UEs connected to the first active site during the second period of time,
wherein the second number is a total number of UEs connected to the first active site during the second period of time; and
determining, for the first inactive site, a weight associated with the one or more KPI changes for the first active site based on the first number of UEs and the second number of UEs.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
determining the second period of time as a period of time associated with a highest number of UEs connected to the first inactive site out of periods of time preceding the first period of time.

### Claim 4 (depends on 1)

The method of claim 1, wherein causing power to be restored to each inactive site comprises:
comparing a first vector associated with impacts on the one or more KPIs with a second vector associated with the determined set of impacts for each inactive site; and
causing power to be restored to each inactive site in an order based on the comparison between the first vector and the second vector.

### Claim 5 (depends on 1)

The method of claim 1, wherein the one or more KPI changes, for the each active site, are caused by one or more inactive sites experiencing the power outage, and wherein the one or more inactive sites are included in the plurality of inactive sites.

### Claim 6 (depends on 1)

The method of claim 1, wherein the power outage occurs for a second period of time that follows a first period of time, and
wherein the method further comprises:
determining a first number of user equipments that are connected to a first active site during the second period of time, wherein the first number of user equipments are connected to a first inactive site of the plurality of inactive sites during the first period of time;
determining a second number of user equipments that are connected to a second active site during the second period of time, wherein the second number of user equipments are connected to the first inactive site during the second period of time; and
including the first active site and the second active site in the set of active sites based on the first number of user equipments and the second number of user equipments.

### Claim 7 (depends on 1)

The method of claim 1, wherein determining the one or more KPI changes comprises:
determining an increase in an amount of energy consumed by an active site during the power outage.

### Claim 8

A device, comprising:
one or more processors configured to:
identify a plurality of inactive sites, each with one or more base stations, experiencing a power outage;
determine one or more key performance indicators (KPI) changes to one or more KPIs, during the power outage, for each active site of a set of active sites that are in service;
determine a respective plurality of weights associated with each inactive site of the plurality of active sites experiencing the power outage;
determine a set of impacts for each inactive site on the one or more KPI changes for the set of active sites based on the respective plurality of weights;
and
cause power to be restored to each inactive site in an order that is based on the set of impacts by:
adjusting a magnitude of each impact of the set of impacts; and
causing power to be restored to each inactive site in an order that is based on the adjusted set of impacts.

### Claim 9 (depends on 8)

The device of claim 8, wherein the power outage occurs during a second period of time that follows a first period of time, and
wherein determining the respective plurality of weights comprises:
determining a first number of user equipments (UEs) that were connected to a first inactive site of the plurality of inactive sites during the first period of time and that are connected to a first active site of the set of active sites during the second period of time;
determining a second number of UEs connected to the first active site during the second period of time, wherein the second number is a total number of UEs connected to the first active site during the second period of time; and
determining, for the first inactive site, a weight associated with the one or more KPI changes for the first active site based on the first number of UEs and the second number of UEs.

### Claim 10 (depends on 9)

The device of claim 9, wherein the one or more processors are further configured to:
determine the second period of time as a period of time associated with a highest number of UEs connected to the first inactive site of the plurality of inactive sites out of periods of time preceding the first period of time.

### Claim 11 (depends on 8)

The device of claim 8, wherein the one or more processors, causing power to be restored, are configured to:
compare a first vector associated with impacts on the one or more KPIs with a second vector associated with the determined set of impacts for each inactive site; and
cause power to be restored to each inactive site in an order based on the comparison between the first vector and the second vector.

### Claim 12 (depends on 11)

The device of claim 11, wherein a first KPI is a KPI relating to accessibility of a network associated with the set of active sites, and
wherein a second KPI is a KPI relating to experience of users while utilizing the network.

### Claim 13 (depends on 8)

The device of claim 8, wherein the one or more processors, to determine the set of impacts, are configured to:
determine an increase in an amount of energy consumed by each active site, of the set of active sites, during the power outage.

### Claim 14 (depends on 8)

The device of claim 8, wherein the one or more processors, to cause power to be restored, are configured to:
determine a distance between a first vector associated with impacts on KPIs and a second vector associated with the set of impacts; and
cause power to be restored to a first inactive site before another inactive site based on the distance.

### Claim 15

A non-transitory computer-readable medium storing a set of instructions, the set of instructions comprising:
one or more instructions that, when executed by one or more processors of a device, cause the device to:
identify a plurality of inactive sites, each with one or more base stations, experiencing a power outage;
determine one or more key performance indicators (KPI) changes to one or more KPIs, during the power outage, for each active site of a set of active sites that are in service;
determine a respective plurality of weights associated with each inactive site of the plurality of active sites experiencing the power outage;
determine a set of impacts for each inactive site on the one or more KPI changes for the set of active sites based on the respective plurality of weights; and
cause power to be restored to each inactive site in an order that is based on the set of impacts by:
adjusting a magnitude of each impact of the set of impacts; and
causing power to be restored to each inactive site in an order that is based on the adjusted set of impacts.

### Claim 16 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the one or more instructions, when executed by the one or more processors, further cause the device to:
determine a first number of the UEs that are connected to a first active site;
determine a second number of the UEs that are connected to a second active site;
determine that the first number of the UEs and the second number of the UEs satisfy a number threshold; and
include the first active site and the second active site in the set of active sites based on the first number and the second number satisfying the number threshold.

### Claim 17 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the power outage occurs during a second period of time that follows a first period of time, and
wherein the instructions, when executed by the one or more processors are further configured to:
determine the respective plurality of weights comprises:
determine a first number of user equipments (UEs) that were connected to a first inactive site of the plurality of inactive sites during the first period of time and that are connected to a first active site of the set of active sites during the second period of time;
determine a second number of UEs connected to the first active site during the second period of time,
wherein the second number is a total number of UEs connected to the first active site during the second period of time; and
determine, for the first inactive site, a weight associated with the one or more KPI changes for the first active site based on the first number of UEs and the second number of UEs.

### Claim 18 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the one or more instructions, that cause the device to determine whether power is to be restored for the inactive site, cause the device to:
compare a first vector associated with impacts on KPIs and a second vector associated with the set of impacts; and
determine whether the power is to be restored for the inactive site based on comparing the first vector and the second vector.

### Claim 19 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the one or more instructions, when executed by the one or more processors, further cause the device to:
adjust a magnitude of the set of impacts to obtain an adjusted set of impacts; and
cause power to be restored to each inactive site based on the adjusted set of impacts.

### Claim 20 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the one or more KPIs include:
a first KPI relating to accessibility of a network associated with the set of active sites,
a second KPI relating to experience of users while utilizing the network, and
a third KPI relating to retaining services of users.