# US 2026/0099131 A1 · Management of machine operation safety zones

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0099131 A1
- Document ID: US20260099131A1
- Status: Published application
- Kind: A1
- Application number: 18/907,093
- Filed: 2024-10-04
- Published: 2026-04-09
- Earliest claimed: 2024-10-04
- Assignees: Caterpillar Inc.
- Applicants: Caterpillar Inc.
- Inventors: Mark W. WHITING; Gautham SUBRAMANIAN
- Web page: https://patentgrep.com/patent/US20260099131A1

## CPC

- G05B 19/406: characterised by monitoring or safety (G05B19/19 takes precedence)
- G05B 2219/31304: Identification of workpiece and data for control, inspection, safety, calibration
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method for determining a safety zone includes receiving work site data, receiving material characteristic data corresponding to the points of the site represented by the work site data, and determining an actual site model. The method further includes determining a desired site model representing the site at a future time, comparing the actual site model to the desired site model to determine a difference model that includes a safety zone in which a machine speed, a machine type, or a quantity of machines, is limited or prohibited, the safety zone being determined based on a material characteristic associated with material that corresponds to the safety zone, the material characteristic being represented in the material characteristic data, one or more areas outside of the safety zone having a different material characteristic, and determining a work plan based on the difference model, the work plan including the safety zone.

## Claims

### Claim 1

A method for determining a safety zone, the method comprising:
receiving work site data representing points of a site in which work is to be performed;
receiving material characteristic data, the material characteristic data corresponding to the points of the site represented by the work site data;
determining an actual site model that is a representation of the site at a current time or at a previous time, the actual site model being based on the work site data;
determining a desired site model that is a representation of the site at a future time;
comparing the actual site model to the desired site model to determine a difference model that includes a safety zone in which a machine speed, a machine type, or a quantity of machines, is limited or prohibited, the safety zone being determined based on a material characteristic associated with material that corresponds to the safety zone, the material characteristic being represented in the material characteristic data, one or more areas outside of the safety zone having a different material characteristic; and
determining a work plan based on the difference model, the work plan including the safety zone.

### Claim 2 (depends on 1)

The method of claim 1, wherein the material characteristic data includes at least one of material density data or material type data.

### Claim 3 (depends on 1)

The method of claim 1, wherein the machine type includes a first machine type and a second machine type, the first machine type being a machine in which an operator is present within a cabin of the machine during operation, the second machine type being a machine which operates without presence of an operator within the cabin of the machine.

### Claim 4 (depends on 1)

The method of claim 1, wherein the difference model represents differences between the actual site model and the desired site model, the differences being achieved by performing excavation, paving, or mining.

### Claim 5 (depends on 1)

The method of claim 1, wherein the safety zone is a first zone of a plurality of safety zones, the first zone having a first level of restriction, a second zone that at least partially overlaps the first zone having a second level of restriction, the second level of restriction being more restrictive than the first level of restriction.

### Claim 6 (depends on 5)

The method of claim 5, wherein the first level of restriction is a first maximum travel speed and the second level of restriction is a second maximum travel speed that is slower than the first maximum travel speed.

### Claim 7 (depends on 1)

The method of claim 1, wherein the safety zone is a prohibition that prevents machines from entering the safety zone, the prohibition being determined based on a potential for erosion.

### Claim 8 (depends on 7)

The method of claim 7, wherein the potential for erosion is determined based on environmental data and at least one of material density data or material type data.

### Claim 9 (depends on 1)

The method of claim 1, wherein the actual site model is generated with work site data that was generated based on a survey of the site performed with a flight-capable survey device or a ground-based survey device.

### Claim 10 (depends on 1)

The method of claim 1, further including causing display of the safety zone via a two-dimensional or three-dimensional representation of the site.

### Claim 11

A system for predicting conditions of one or more components of a machine comprising:
one or more processors; and
at least one non-transitory computer readable medium storing instructions which, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
receiving work site data representing points of a site in which work is to be performed;
receiving material characteristic data, the material characteristic data corresponding to the points of the site represented by the work site data;
determining an actual site model that is a representation, in three dimensions of the site at a current time or at a previous time, the actual site model being based on the work site data;
determining a desired site model that is a representation, in three dimensions of the site at a future time;
based on the actual site model and the desired site model, determining a safety zone in which a machine type or a quantity of machines is limited or prohibited, the safety zone being determined based on a material characteristic associated with material that corresponds to the safety zone, the material characteristic being represented in the material characteristic data, one or more areas outside of the safety zone having a different material characteristic; and
causing display of a representation of the safety zone on the site.

### Claim 12 (depends on 11)

The system of claim 11, wherein the safety zone prohibits operators from the safety zone.

### Claim 13 (depends on 11)

The system of claim 11, wherein the safety zone is present in an area of the site in which loading of material is to be performed, unloading of the material is to be performed, grading is to be performed, paving is to be performed, drilling is to be performed, or mining operations are to be performed.

### Claim 14 (depends on 11)

The system of claim 11, wherein the operations further include determining a work zone sequence based on the safety zone.

### Claim 15 (depends on 11)

The system of claim 11, wherein the operations further include determining a work zone sequence based on material density data, material type data, topology data, or environmental data.

### Claim 16 (depends on 11)

The system of claim 11, wherein the operations further include generating a recommendation for a site modification.

### Claim 17

A non-transitory computer readable medium, the non-transitory computer readable medium storing instructions for predicting conditions of one or more components of a machine which, when executed by one or more processors of a computing system, cause the one or more processors to perform operations comprising:
receiving work site data representing points of a site in which work is to be performed;
receiving material characteristic data, the material characteristic data corresponding to the points of the site represented by the work site data;
determining an actual site model that is a representation, in three dimensions of the site at a current time or at a previous time, the actual site model being based on the work site data;
determining a desired site model that is a representation, in three dimensions of the site at a future time;
comparing the actual site model to the desired site model to determine a difference model that includes a safety zone in which a machine speed, a machine type, or a quantity of machines, is limited or prohibited; and
determining a work plan based on the difference model, the work plan including the safety zone and a work zone sequence.

### Claim 18 (depends on 17)

The non-transitory computer readable medium of claim 17, wherein the operations further include updating the safety zone based on a change to the material characteristic data, a change to environmental data, a change to machine data, or a change to personnel data.

### Claim 19 (depends on 17)

The non-transitory computer readable medium of claim 17, wherein the operations further include generating a recommendation for modifying the site.

### Claim 20 (depends on 17)

The non-transitory computer readable medium of claim 17, wherein the operations further include causing display of a representation of the safety zone and the work zone sequence.