# US 2026/0098890 A1 · Progressive Power Grid Planning Evaluation Method and System Based on Combination Assessment Theory

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0098890 A1
- Document ID: US20260098890A1
- Status: Published application
- Kind: A1
- Application number: 19/009,099
- Filed: 2025-01-03
- Published: 2026-04-09
- Earliest claimed: 2024-10-08
- Assignees: Guizhou Power Grid Company Limited
- Applicants: Guizhou Power Grid Co., Ltd.
- Inventors: Xin HE; Yu ZHANG; Zhaofeng ZHANG; Xueyong TANG; Julong CHEN; Ning LUO; Bin WANG; Yang LI; Qingsheng LI; Chen LUO; Yan ZHANG; Rong WANG; Hongyu RAO; Ludong CHEN
- Web page: https://patentgrep.com/patent/US20260098890A1

## CPC

- G01R 31/088: {Aspects of digital computing}
- G01R 31/086: {in power transmission or distribution networks, i.e. with interconnected conductors}
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present invention discloses a progressive power grid planning evaluation method and system based on a combination assessment theory, and relates to the technical field of power grid assessment and optimization. The method includes: correcting a weight of an obtained index by using a combination weighting method; obtaining an assessed value based on a similarity theory assessment method; standardizing an index by dimensionless processing; and performing evaluation based on nonparametric regression. The present invention ensures objectivity and fairness of an assessment result and the efficiency and the accuracy of assessment are improved. The present invention may be adaptively adjusted, making the assessment result closer to reality.

## Claims

### Claim 1

A progressive power grid planning evaluation method based on a combination assessment theory, comprising:
acquiring power grid system data, and correcting a weight of the collected power grid system data based on a combination weighting method;
obtaining an assessed value based on a similarity theory assessment method;
standardizing an index by dimensionless processing; and
performing evaluation based on nonparametric regression.

### Claim 2 (depends on 1)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 1, wherein the power grid system data comprises power grid operation state data, power grid equipment operation data, power grid load data, power grid fault data, and power grid environment data;
the combination weighting method comprises a subjective weighting method and an objective weighting method, and the weighting method is selected according to the performance analysis of a power grid system;
a data index of the power grid system is assessed according to the subjective weighting method to generate a judgment matrix, normalization checking is performed on the judgment matrix, and a system weight of the matrix is obtained by iterative calculation;
the data index of the power grid system is weighted by the objective weighting method to generate an original data matrix, and a comprehensive weight of the power grid system is obtained by dimensionless processing and normalization processing on a weight value; and
the generating a judgment matrix comprises comparing evaluation factors, and filling a comparison result into the judgment matrix, wherein
the normalization checking represents that
C
⁢
I
=
λ
max
-
n
n
-
1
C
⁢
R
=
C
⁢
I
R
⁢
I
if CR is smaller than 0.1, normalization checking passes,
wherein CI represents a consistency index, λmad represents a maximum eigenvalue of the judgment matrix, CR represents a consistency ratio, RI represents a random consistency index, and n represents a number of the evaluation factors.

### Claim 3 (depends on 2)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 2, wherein the obtaining a comprehensive weight of the power grid system comprises: calculating a weight of each data index according to the objective weighting method, and performing a check according to the Kendall's concordance coefficient test method, wherein
if d(W(1), W(2)) is larger than a test threshold, a test passes; and if the test passes, the comprehensive weight of the power grid system is calculated by using
W
=
∑
k
=
1
q
λ
k
⁢
W
(
k
)
;
and
the Kendall's concordance coefficient test method is expressed as:
d
⁡
(
W
(
1
)
,
W
(
2
)
)
=
[
1
2
⁢
∑
j
=
1
n
(
w
j
(
1
)
-
w
j
(
2
)
)
2
]
1
2
wherein d(W(1), W(2)) represents an Euclidean distance between weight vectors W(1) and W(2);
(
W
j
(
1
)
,
W
j
(
2
)
)
2
represents a square of a difference between the weight values of the two weight vectors at the jth position;
∑
j
=
1
n
represents calculation on all weight differences; W represents the comprehensive weight of the power grid system; λk represents a weight of the kth evaluation standard; and q represents a total number of evaluation standards.

### Claim 4 (depends on 3)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 3, wherein the similarity theory assessment method comprises: constructing a new model for power grid system level evaluation by a Shepard similarity interpolation method based on an accelerated genetic algorithm and an ideal interval method based on a genetic algorithm, wherein
the constructing a new model for power grid system level evaluation comprises: randomly generating power grid data evaluation level sample series x(i, j) and y(i) according to a system evaluation standard table, wherein i=1−n, and j=1−nj; and
performing optimization estimation according to a sample parameter b, taking a sample i from the sample series, and obtaining an interpolation, denoted as yc(i), corresponding to an evaluation level y(i) by Shepard interpolation with other n−1 samples;
the accelerated genetic algorithm is expressed as:
min
⁢
f
⁡
(
b
)
=
∑
i
=
1
n
❘
"\[LeftBracketingBar]"
y
c
(
i
)
-
y
⁡
(
i
)
❘
"\[RightBracketingBar]"
s
.
t
.
1
≤
b
≤
5
wherein
∑
i
=
1
n
represents a summation symbol, yc(i) represents the ith observed value, y(i) represents the ith actual value, and s.t. represents a constraint condition; and
the ideal interval method based on the genetic algorithm comprises: generating the evaluation standard sample series, performing dimensionless processing, calculating a distance between each standard sample and a standard level ideal interval, and calculating a relative membership degree value and an assessed value of each standard sample to the standard level ideal interval.

### Claim 5 (depends on 4)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 4, wherein the dimensionless processing is expressed as:
x
⁡
(
k
,
j
)
=
x
*
(
k
,
j
)
/
x
m
⁢
ax
(
j
)
⁢
(
k
=
1
~
n
k
,
j
=
1
~
n
j
)
a
⁡
(
i
,
j
)
=
a
*
(
i
,
j
)
/
x
m
⁢
ax
(
j
)
⁢
(
i
=
1
~
n
i
,
j
=
1
~
n
j
)
b
⁡
(
i
,
j
)
=
b
*
(
i
,
j
)
/
x
m
⁢
ax
(
j
)
⁢
(
i
=
1
~
n
i
,
j
=
1
~
n
j
)
wherein x(k, j), a(i, j), and b(i, j) represent two-dimensional variables x*(k, j), a*(i, j), and b*(i, j) represent original values of x(k, j) a(i, j), and b(i, j) respectively, and xmax(j) represents a maximum value of the jth evaluation index that may be taken from the evaluation standard sample series, expressed as:
x
ma
⁢
x
(
j
)
=
max
i
⁢
{
b
*
(
i
,
j
)
}
the distance between each standard sample and the standard level ideal interval is expressed as:
D
⁡
(
k
,
i
)
=
∑
j
=
1
n
j
w
⁡
(
j
)
⁢
d
⁡
(
k
,
i
,
j
)
d
⁢
{
a
⁡
(
i
,
j
)
-
x
⁡
(
k
,
j
)
,
x
⁡
(
k
,
j
)
<
a
⁡
(
i
,
j
)
0
,
x
⁡
(
k
,
j
)
∈
[
a
⁡
(
i
,
j
)
,
b
⁡
(
i
,
j
)
]
x
⁡
(
k
,
j
)
-
b
⁡
(
i
,
j
)
,
x
⁡
(
k
,
j
)
>
b
⁡
(
i
,
j
)
wherein D(k, i) represents a total distance between the kth observed value and the ith reference value, w(j) represents a weight of the jth index, d(k, i, j) represents a distance between the kth observed value and the ith reference value on the jth feature, a(i, j) and b(i, j) represent a lower bound and an upper bound of the ith reference value on the jth feature, and x(k, j) represents a value of the kth observed value on the jth feature, wherein k=1−nk;
the relative membership degree value is expressed as:
min
⁢
f
⁡
(
c
)
=
∑
k
=
1
n
k
❘
"\[LeftBracketingBar]"
h
⁡
(
k
)
-
y
⁡
(
k
)
❘
"\[RightBracketingBar]"
wherein h(k) represents a quality level value of the observed value k, and y(k) represents a true value of the observed value k; and
the assessed value is expressed as: {z*(k, j)|k=1˜nz, j=1˜nj}.

### Claim 6 (depends on 5)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 5, wherein the performing evaluation based on nonparametric regression comprises: obtaining a one-dimensional projection value z(i) of the assessed value, expressed as:
z
⁡
(
i
)
=
∑
j
=
1
p
a
⁡
(
j
)
⁢
x
⁡
(
i
,
j
)
obtaining a projection index function by means of the one-dimensional projection value, expressed as:
Q
⁡
(
a
)
=
S
z
⁢
❘
"\[LeftBracketingBar]"
R
x
⁢
y
❘
"\[RightBracketingBar]"
wherein represents an absolute value, and Sz represents a standard deviation of a projection value z(i);
estimating an optimal projection direction by solving a maximization problem of the projection index function
max
⁢
Q
⁡
(
a
)
=
S
z
⁢
❘
"\[LeftBracketingBar]"
R
x
⁢
y
❘
"\[RightBracketingBar]"
s
.
t
.
∑
j
=
1
p
a
2
(
j
)
=
1
;
and
performing optimization by using the accelerated genetic algorithm.

### Claim 7 (depends on 6)

The progressive power grid planning evaluation method based on the combination assessment theory according to claim 6, wherein the performing evaluation based on nonparametric regression further comprises: establishing a corresponding a Nadaraya-Watson nonparametric model, expressed as:
y
c
(
k
)
=
∑
i
=
1
n
K
⁡
(
(
z
*
(
i
)
-
z
⁡
(
k
)
)
/
h
)
⁢
y
⁡
(
i
)
∑
i
=
1
n
K
⁡
(
(
z
*
(
i
)
-
z
⁡
(
k
)
)
/
h
)
performing optimization estimation by using a standard evaluation object series {z*(i)|i=1˜n} and the accelerated genetic algorithm to solve the following optimization problems, expressed as:
min
⁢
f
⁡
(
h
)
=
∑
h
=
1
n
❘
"\[LeftBracketingBar]"
y
c
(
i
)
-
y
⁡
(
i
)
❘
"\[RightBracketingBar]"
s
.
t
.
h
∈
[
a
,
b
]

### Claim 8 (depends on 1)

A system using the progressive power grid planning evaluation method based on the combination assessment theory according to claim 1, comprising: a data processing module, a feature engineering module, a deep learning model training module, and a regularization and optimization module, wherein
the data processing module is responsible for collecting historical data and real-time data from a power grid system;
the feature engineering module is responsible for selecting and constructing features required for assessment;
the deep learning model training module is responsible for constructing and training a model of a LSTM network combined with an attention mechanism; and
the regularization and optimization module is responsible for preventing model from overfitting.

### Claim 9 (depends on 1)

A computer device, comprising a memory in which a computer program is stored and a processor, wherein when the computer program is executed by the processor, the steps of the progressive power grid planning evaluation method based on the combination assessment theory according to claim 1 are implemented.

### Claim 10 (depends on 1)

A computer-readable storage medium in which a computer program is stored, wherein when the computer program is executed by a processor, the steps of the progressive power grid planning evaluation method based on the combination assessment theory of claim 1 are implemented.