Tunnel construction method and machine
AssigneeMACCAFERRI TUNNELING S.r.l.
InventorCristiano BONOMI
Life of this patent
Estimating the term…
Loading patent…
AssigneeMACCAFERRI TUNNELING S.r.l.
InventorCristiano BONOMI
Estimating the term…
A method for constructing natural tunnels including advancing an excavation front of a tunnel by a predetermined advance length via point excavation with excavating machines, removing excavated material from a work region between the excavation front and a final lining front of the tunnel, applying a primary lining onto walls exposed by the excavation at the advance length of the excavation front, advancing the final lining front by a predetermined advance length by creating a final lining on the primary lining applied at the same advance length in a previous advance cycle, and repeating all steps until the tunnel is completed. The step of advancing the final lining front is carried out with a segment placing machine having a tubular frame. Passage or displacement of operating machines, vehicles, or equipment from/to the work region during the steps of removing and applying takes place through the tubular.
A method for constructing natural tunnels, wherein a tunnel under construction has an excavation front, a final lining front upstream of the excavation front in an excavation advance direction, and a work region located between the excavation front and the final lining front, the method comprising the steps of:
A self-propelled segment placing machine for placing prefabricated segments of a final lining of a natural tunnel, comprising: