# US 2026/0097677 A1 · Hierarchical distributed control of distributed energy resources (ders)

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0097677 A1
- Document ID: US20260097677A1
- Status: Published application
- Kind: A1
- Application number: 19/303,059
- Filed: 2025-08-18
- Published: 2026-04-09
- Earliest claimed: 2024-10-04
- Assignees: Itron, Inc.
- Applicants: Itron, Inc.
- Inventors: Nima Tehrani; Eric Young; Timothy James Driscoll; Frank Anthony Monforte
- Web page: https://patentgrep.com/patent/US20260097677A1

## CPC

- B60L 53/63: in response to network capacity
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/68: Off-site monitoring or control, e.g. remote control
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 3/175: responsive to end-user or load operations (H02J3/14 takes precedence)
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 13/182: the equipment comprising loads connected to the power network
- H02J 13/333: the equipment forming part of substations
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J 2105/37: exchanging power with electric vehicles [EV] or with hybrid electric vehicles [HEV]
- H02J 2105/53: for partial power limitation, e.g. entering degraded or current limitation modes
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

Techniques for allocating a load capacity to on-site smart sensors coupled to distributed energy resources (DERs) are described herein. For example, a primary smart sensor may receive, from a utility supplier (e.g., which may include a substation), a maximum load constraint associated with a network of smart utility sensors in an autonomous routing area. The maximum load constraint may be a maximum load and/or maximum capacity that the network of smart utility sensors may collectively operate with by a transformer carrying the load. In some examples, the primary smart sensor may receive utility data from the smart sensors and may determine a total transformer load associated with the transformer that is providing power to the network of smart utility sensors based at least in part on the utility data.

## Claims

### Claim 1

A method comprising:
receiving, from a substation, a maximum load constraint associated with a network of smart utility meters;
receiving utility data from a plurality of smart utility meters within the network of smart utility meters;
determining a total transformer load associated with a transformer based at least in part on the utility data;
determining a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;
determining an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and
sending the allocated capacity to the individual ones of the plurality of smart utility meters.

### Claim 2 (depends on 1)

The method of claim 1, wherein the allocated capacity causes the individual ones of the plurality of smart utility meters to:
reduce a charging load of an electric vehicle supply equipment (EVSE); or
increase the charging load of the EVSE.

### Claim 3 (depends on 1)

The method of claim 1, wherein receiving the utility data includes receiving data associated with at least one of:
electricity metering devices associated with the network of smart utility meters,
a distributed generation system,
electric vehicle (EV) telematics of an EV connected to an electrical grid, or
an EV supply equipment (EVSE) associated with the electrical grid.

### Claim 4 (depends on 1)

The method of claim 1, further comprising receiving utility data that includes at least one of:
present electricity consumption data associated with the network of smart utility meters,
historical electricity consumption data associated with the network of smart utility meters,
present electricity generation data associated with a distributed generation system, or
historical electricity generation data associated with the network of smart utility meters.

### Claim 5 (depends on 1)

The method of claim 1, wherein the maximum load constraint is based at least in part on at least one of a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

### Claim 6 (depends on 1)

The method of claim 1, wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or
in response to the transformer capacity being below the threshold value, reducing a charging load of the EVSE.

### Claim 8

A smart utility meter comprising:
at least one processor; and
memory storing instructions that cause the at least one processor to perform operations comprising:
receiving, from a substation, a maximum load constraint associated with a network of smart utility meters;
receiving utility data from a plurality of additional smart utility meters within the network of smart utility meters;
determining a total transformer load associated with a transformer based at least in part on the utility data;
determining a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;
determining an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and
sending the allocated capacity to the individual ones of the plurality of additional smart utility meters.

### Claim 9 (depends on 8)

The smart utility meter of claim 8, wherein the allocated capacity causes the individual ones of the plurality of smart utility meters to:
reduce a charging load of an electric vehicle supply equipment (EVSE); or
increase the charging load of the EVSE.

### Claim 10 (depends on 8)

The smart utility meter of claim 8, wherein receiving the utility data includes receiving data associated with at least one of:
electricity metering devices associated with the network of smart utility meters,
a distributed generation system,
electric vehicle (EV) telematics of an EV connected to an electrical grid, or
an EV supply equipment (EVSE) associated with the electrical grid.

### Claim 11 (depends on 8)

The smart utility meter of claim 8, the operations further comprising receiving utility data that includes at least one of:
present electricity consumption data associated with the network of smart utility meters,
historical electricity consumption data associated with the network of smart utility meters,
present electricity generation data associated with a distributed generation system, or
historical electricity generation data associated with the network of smart utility meters.

### Claim 12 (depends on 8)

The smart utility meter of claim 8, wherein the maximum load constraint is based at least in part on at least one of: a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

### Claim 13 (depends on 8)

The smart utility meter of claim 8, wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

### Claim 14 (depends on 13)

The smart utility meter of claim 13, the operations further comprising:
in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or
in response to the transformer capacity being below the threshold value, reducing a charging load of the EVSE.

### Claim 15

A utility network system comprising:
a substation configured to determine a maximum load constraint associated with a network of smart utility meters;
a primary smart utility meter configured to:
receive, from the substation, the maximum load constraint;
receive utility data from a plurality of smart utility meters within the network of smart utility meters;
determine a total transformer load associated with a transformer based at least in part on the utility data;
determine a remaining transformer capacity associated with the transformer based at least in part on the maximum load constraint and the total transformer load;
determine an allocated capacity for individual ones of the plurality of smart utility meters based at least in part on the remaining transformer capacity; and
send the allocated capacity to the individual ones of the plurality of smart utility meters; and
at least one smart utility meter of the plurality of smart utility meters configured to:
receive the allocated capacity; and
perform an action based on the allocated capacity.

### Claim 16 (depends on 15)

The utility network system of claim 15, wherein the action comprises adjusting a load capacity of a distributed energy resource (DER).

### Claim 17 (depends on 15)

The utility network system of claim 15, wherein the action comprises:
reducing a charging load of an electric vehicle supply equipment (EVSE); or
increasing the charging load of the EVSE.

### Claim 18 (depends on 15)

The utility network system of claim 15, wherein receiving the utility data includes receiving data associated with at least one of:
electricity metering devices associated with the network of smart utility meters,
a distributed generation system,
electric vehicle (EV) telematics of an EV connected to an electrical grid, or
an EV supply equipment (EVSE) associated with the electrical grid.

### Claim 19 (depends on 15)

The utility network system of claim 15, further comprising receiving utility data that includes at least one of:
present electricity consumption data associated with the network of smart utility meters,
historical electricity consumption data associated with the network of smart utility meters,
present electricity generation data associated with a distributed generation system, or
historical electricity generation data associated with the network of smart utility meters.

### Claim 20 (depends on 15)

The utility network system of claim 15, wherein the maximum load constraint is based at least in part on at least one of a temperature associated with the transformer, cooling methods associated with the transformer, voltage regulation associated with the transformer, core saturation associated with the transformer, a load type, a short-circuit current associated with the transformer, or safety standards.

### Claim 21 (depends on 15)

The utility network system of claim 15, wherein determining the remaining transformer capacity associated with the transformer includes determining a delta value between the total transformer load and the maximum load constraint and determining if the delta value is above or below a threshold value.

### Claim 22 (depends on 15)

The utility network system of claim 15, the operations further comprising:
in response to the transformer capacity being above the threshold value, increasing a charging load of an electric vehicle supply equipment (EVSE); or