# US 2026/0095400 A1 · System and method for telemetry load testing to confirm capabilities of distributed system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0095400 A1
- Document ID: US20260095400A1
- Status: Published application
- Kind: A1
- Application number: 18/903,357
- Filed: 2024-10-01
- Published: 2026-04-02
- Earliest claimed: 2024-10-01
- Assignees: Otis Elevator Company
- Applicants: Otis Elevator Company
- Inventors: Senthilnathan Balasubramaniam; Sanjithraj Rao; Ezhil Nanjappan
- Web page: https://patentgrep.com/patent/US20260095400A1

## CPC

- H04L 41/145: {involving simulating, designing, planning or modelling of a network}
- H04L 43/50: Testing arrangements
- H04L 43/08: Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L 43/0847: {Transmission error}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A system configured for simulating communication loads over a network, the system having: a controller module; an application module, operationally coupled over the network to the controller module, wherein the system is configured to execute a load test over the network with the application module, by: transmitting mock telemetry messages, associated with mock devices, representing internet-of-things (IoT) devices, to the application module, wherein the mock telemetry messages are equivalent to production telemetry messages sent from the IoT devices; and issuing an alert when the system determines that a result of the load test is indicative of errors above a threshold associated with receipt of the mock telemetry messages by the application module.

## Claims

### Claim 1

A system configured for simulating communication loads over a network, the system including:
a controller module;
an application module, operationally coupled over the network to the controller module,
wherein the system is configured to execute a load test over the network with the application module, by:
transmitting mock telemetry messages, associated with mock devices, representing internet-of-things (IoT) devices, to the application module, wherein the mock telemetry messages are equivalent to production telemetry messages sent from the IoT devices; and
issuing an alert when the system determines that a result of the load test is indicative of errors above a threshold associated with receipt of the mock telemetry messages by the application module.

### Claim 2 (depends on 1)

The system of claim 1, wherein the controller module identifies errors by determining that one or more of the mock telemetry messages failed to reach the application module or that mock telemetry data in one or more of the mock telemetry messages is inaccurate.

### Claim 3 (depends on 1)

The system of claim 1, wherein:
prior to transmitting the mock telemetry messages, the system is configured to generate the mock devices and register the mock devices with the application module; and
the controller module is configured to determine the result of the load test is indicative of errors by reviewing reports generated from telemetry metrics, derived from telemetry logs received from the application module, wherein the telemetry logs identify the mock devices and associated ones of the mock telemetry messages received with the mock devices.

### Claim 4 (depends on 3)

The system of claim 3, wherein the devices are elevator cars, escalators or movable walkways.

### Claim 5 (depends on 4)

The system of claim 4, wherein, each one of mock telemetry messages contains mock telemetry data that identifies one of the mock devices associated with the one of the mock telemetry messages and a mock operational state of the one of the mock devices.

### Claim 6 (depends on 5)

The system of claim 5, wherein the system is configured to:
receive input that includes load test parameters; and
perform the load test from the load test parameters.

### Claim 7 (depends on 6)

The system of claim 6, wherein the load test parameters identifies one or more of:
a date and time to start the load test;
a duration for executing the load test;
a subgroup of the mock devices for generating the load test; and
the mock telemetry data to include in the mock telemetry messages.

### Claim 8 (depends on 7)

The system of claim 7, wherein the subgroup of the mock devices is selected based on one or more of a device type and a device location.

### Claim 9 (depends on 5)

The system of claim 5, wherein the system is configured to:
periodically retrieve a production telemetry metrics, representing a production load from a predetermined prior timeframe; and
perform the load test from the production telemetry metrics.

### Claim 10 (depends on 9)

The system of claim 9, wherein the system performs the load test by:
generating the mock devices representing the IoT devices that transmitted the production telemetry messages during the prior timeframe;
generating the mock telemetry messages representing the production telemetry messages generated by the IoT devices during the prior timeframe; and
transmitting the mock telemetry messages to the application module.

### Claim 11

A method for simulating communication loads over a network, the method including:
a controller module executing a load test, by:
transmitting mock telemetry messages, associated with mock devices, representing internet-of-things (IoT) devices to an application module that is operationally coupled over the network to the controller module, wherein the mock telemetry messages are equivalent to production telemetry messages sent from the IoT devices; and
issuing an alert when the system determines that a result of the load test is indicative of errors above a threshold associated with receipt of the mock telemetry messages by the application module.

### Claim 12 (depends on 11)

The method of claim 11, comprising identifying, by the system, errors by determining that one or more of the mock telemetry messages failed to reach the application module or that mock telemetry data in one or more of the mock telemetry messages is inaccurate.

### Claim 13 (depends on 11)

The method of claim 11, comprising:
prior to transmitting the mock telemetry messages, generating, by the system, the mock devices and registering the mock devices with the application module; and
determining the result of the load test is indicative of errors by reviewing reports generated from mock telemetry metrics, derived from telemetry logs received from the application module, wherein the telemetry logs identify the mock devices and associated ones of the mock telemetry messages received with the mock devices.

### Claim 14 (depends on 13)

The method of claim 13, wherein the IoT devices are elevator cars, escalators or movable walkways.

### Claim 15 (depends on 14)

The method of claim 14, comprising generating, by the system, for each one of mock telemetry messages, mock telemetry data that identifies one of the mock devices associated with the one of the mock telemetry messages and a mock operational state of the one of the mock devices.

### Claim 16 (depends on 15)

The method of claim 15, comprising the system:
receiving input that includes load test parameters; and
performing the load test from the load test parameters.

### Claim 17 (depends on 16)

The method of claim 16, wherein the load test parameters identifies one or more of:
a date and time to start the load test;
a duration for executing the load test;
a subgroup of the mock devices for the load test; and
the mock telemetry data to include in the mock telemetry messages.

### Claim 18 (depends on 17)

The method of claim 17, wherein the subgroup of the devices is selected based on one or more of a device type and a device location.

### Claim 19 (depends on 15)

The method of claim 15, comprising the system:
periodically retrieving a production telemetry metrics representing a production load from a predetermined prior timeframe; and
performing the load test from the production telemetry metrics.

### Claim 20 (depends on 19)

The method of claim 19, comprising the system performing the load test by:
generating the mock devices representing the IoT devices that transmitted the production telemetry messages during the prior timeframe;
generating the mock telemetry messages representing the production telemetry messages generated by the IoT devices during the prior timeframe; and
transmitting the mock telemetry messages to the application module.
