# US 2026/0095397 A1 · Addressing predicted unhealthy conditions of network links

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0095397 A1
- Document ID: US20260095397A1
- Status: Published application
- Kind: A1
- Application number: 18/901,019
- Filed: 2024-09-30
- Published: 2026-04-02
- Earliest claimed: 2024-09-30
- Assignees: Hewlett Packard Enterprise Development LP
- Applicants: Hewlett Packard Enterprise Development LP
- Inventors: Nilakantan Mahadevan; Robert James Zirkel; David Field Winchell; Michael Alan Peterson
- Web page: https://patentgrep.com/patent/US20260095397A1

## CPC

- H04L 43/0817: by checking functioning
- H04L 41/0654: using network fault recovery (ring fault isolation or reconfiguration in loop networks without recovery actions by a network management system H04L12/437)
- H04L 41/147: for predicting network behaviour
- H04L 43/16: Threshold monitoring
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

In some examples, a system monitors health metrics associated with a plurality of edge links connecting a collection of switches to electronic devices. The system predicts, based on a pattern of the health metrics, an unhealthy condition of a first edge link of the plurality of edge links. Based on the predicting, a workload manager triggers a maintenance mode for an electronic device connected to the first edge link to address the predicted unhealthy condition, wherein while the electronic device is in the maintenance mode the workload manager avoids scheduling any further workloads on the electronic device.

## Claims

### Claim 1

A method comprising:
monitoring, by a system comprising a hardware processor, health metrics associated with a plurality of edge links connecting a collection of switches to electronic devices
predicting, by the system based on a pattern of the health metrics, an unhealthy condition of a first edge link of the plurality of edge links; and
based on the predicting, triggering, by a workload manager in the system, a maintenance mode for an electronic device connected to the first edge link to address the predicted unhealthy condition, wherein while the electronic device is in the maintenance mode the workload manager avoids scheduling any further workloads on the electronic device.

### Claim 2 (depends on 1)

The method of claim 1, comprising:
communicating data of an existing workload running on the electronic device over the first edge link while the electronic device is in the maintenance mode.

### Claim 3 (depends on 2)

The method of claim 2, comprising:
after completing a communication of data for the existing workload over the first edge link, performing maintenance on the first edge link to resolve the unhealthy condition of the first edge link.

### Claim 4 (depends on 1)

The method of claim 1, comprising:
monitoring, by the system, further health metrics associated with a plurality of inter-switch links connecting switches of the collection of switches;
predicting, by the system based on a pattern of the further health metrics, an unhealthy condition of a first inter-switch link of the plurality of inter-switch links; and
based on predicting the unhealthy condition of the first inter-switch link, triggering, by a fabric manager in the system, an update of forwarding information in at least one switch connected to the first inter-switch link, the updated forwarding information diverting subsequently transmitted data away from the first inter-switch link.

### Claim 5 (depends on 4)

The method of claim 4, wherein the collection of switches comprises a first group of switches, wherein each switch of the first group of switches is connected by local links to each other switch of the first group of switches, and wherein the further health metrics comprise health metrics associated with the local links.

### Claim 6 (depends on 5)

The method of claim 5, wherein the collection of switches comprises a second group of switches, the second group of switches connected over a global link to the first group of switches, and wherein the further health metrics comprise health metrics associated with the global link.

### Claim 7 (depends on 1)

The method of claim 1, wherein the predicting of the unhealthy condition of the first edge link based on the pattern of the health metrics comprises detecting that the health metrics are negatively trending over time.

### Claim 8 (depends on 1)

The method of claim 1, wherein the predicting the unhealthy condition of the first edge link based on the pattern of the health metrics comprises detecting that a rate of change of the health metrics exceeds a rate change threshold.

### Claim 9 (depends on 1)

The method of claim 1, wherein the health metrics associated with the plurality of edge links are monitored in periodic intervals according to a first frequency.

### Claim 10 (depends on 9)

The method of claim 9, comprising:
detecting that a collection of health metrics for the first edge link satisfies a transition criterion; and
based on detecting that the collection of health metrics satisfies the transition criterion, increasing a frequency at which health metrics for the first edge link are monitored.

### Claim 11 (depends on 10)

The method of claim 10, comprising:
determining, by the system, whether a further collection of health metrics for the first edge link collected at the increased frequency satisfies an unhealthy link criterion,
wherein the predicting of the unhealthy condition of the first edge link is based on the further collection of health metrics satisfying the unhealthy link criterion.

### Claim 12 (depends on 10)

The method of claim 10, wherein the collection of health metrics comprises a data error rate for the first edge link, and the transition criterion comprises the data error rate exceeding an error rate threshold.

### Claim 13 (depends on 10)

The method of claim 10, wherein the collection of health metrics comprises a data transfer rate over the first edge link, and the transition criterion comprises the data transfer rate dropping below a transfer rate threshold.

### Claim 14 (depends on 1)

The method of claim 1, wherein the health metrics are collected by device health agents in the electronic devices and switch health agents in the collection of switches.

### Claim 15 (depends on 14)

The method of claim 14, wherein the predicting of the unhealthy condition of the first edge link is performed by the workload manager.

### Claim 16

A system comprising:
a hardware processor; and
a non-transitory storage medium storing health monitor instructions and scheduler instructions, the health monitor instructions executable on the hardware processor to:
receive health metrics associated with a plurality of edge links connecting a collection of switches to electronic devices, and
predict, based on a pattern of the health metrics, an unhealthy condition of a first edge link of the plurality of edge links, and
the scheduler instructions executable on the hardware processor to:
based on the predicting, trigger a maintenance mode for an electronic device connected to the first edge link to address the predicted unhealthy condition, and
while the electronic device is in the maintenance mode, schedule further workloads away from the electronic device.

### Claim 17 (depends on 16)

The system of claim 16, wherein the predicting of the unhealthy condition of the first edge link based on the pattern of the health metrics comprises detecting that the health metrics are negatively trending over time.

### Claim 18 (depends on 16)

The system of claim 16, wherein the predicting the unhealthy condition of the first edge link based on the pattern of the health metrics comprises detecting that a rate of change of the health metrics exceeds a rate change threshold.

### Claim 19

A non-transitory machine-readable storage medium comprising instructions that upon execution cause a system to:
receive health metrics associated with network links, the network links interconnecting switches and electronic devices, and the network links comprising inter-switch links connecting the switches to one another, and edge links connecting the electronic devices to the switches;
predict, based on a pattern of the health metrics, an unhealthy condition of a first edge link of the edge links, and an unhealthy condition of a first inter-switch link of the inter-switch links; and
based on the predicting:
trigger a maintenance mode for an electronic device connected to the first edge link to address the predicted unhealthy condition of the first edge link, wherein while the electronic device is in the maintenance mode, a workload manager schedules further workloads away from the electronic device, and
update forwarding information in a subset of the switches to divert traffic away from the first inter-switch link.

### Claim 20 (depends on 19)

The non-transitory machine-readable storage medium of claim 19, wherein the triggering of the maintenance mode is performed by the workload manager, and the updating of the forwarding information is performed by a fabric manager.
