# US 2026/0095047 A1 · Grid-forming plant controls for self-supply and black start applications of dc energy storage systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0095047 A1
- Document ID: US20260095047A1
- Status: Published application
- Kind: A1
- Application number: 19/345,534
- Filed: 2025-09-30
- Published: 2026-04-02
- Earliest claimed: 2024-09-30
- Assignees: Fluence Energy, LLC
- Applicants: Fluence Energy, LLC
- Inventors: Ioannis Arvanitis; Stefan Henninger
- Web page: https://patentgrep.com/patent/US20260095047A1

## CPC

- H02J 3/001: Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
- G01R 31/382: Arrangements for monitoring battery or accumulator variables, e.g. SoC
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 3/40: Synchronisation of generators for connection to a network or to another generator
- Y02E 40/10: Flexible AC transmission systems [FACTS]
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A power plant includes a plant controller in communication with and operatively connected to a plurality of BESSs. Each of the plurality of BESSs is composed of a plurality of BESS enclosures, a bus bar including a bus coupler, and a plurality of BESS circuit breakers. Each of the plurality of BESSs is connectable via a respective one of the plurality of BESS circuit breakers to the bus bar to supply electric power to an electric grid. The plant controller is arranged to control the bus coupler to separate the plurality of BESSs into a first network and a second network, control the first network to operate the power plant in a self-supply mode when the bus coupler is in an open state, and control the second network to operate the power plant in black-start mode when the bus coupler is in the open state.

## Claims

### Claim 1

An energy storage system including a battery energy storage system (BESS), the energy system comprising:
a plant controller in communication with and operatively connected to a plurality of battery energy storage systems (BESSs);
wherein each of the plurality of BESSs is composed of a plurality of BESS enclosures, a bus bar, a bus coupler, and a plurality of BESS circuit breakers;
wherein each of the plurality of BESSs is connectable via a respective one of the plurality of BESS circuit breakers to the bus bar to supply electric power to an electric grid;
wherein the bus bar includes the bus coupler;
wherein the plant controller is arranged to control the bus coupler to separate the plurality of BESSs into a first network and a second network;
wherein the plant controller is arranged to control the first network to operate the power plant in a self-supply mode when the bus coupler is in an open state; and
wherein the plant controller is arranged to control the second network to operate the power plant in black-start mode when the bus coupler is in the open state.

### Claim 2 (depends on 1)

The system of claim 1, wherein each of the plurality of BESSs comprises a BESS that is composed of a plurality of BESS enclosures, a power converter, and a transformer.

### Claim 3 (depends on 2)

The system of claim 2, further comprising the power converter being operative to perform grid-forming (GFM) operation to energize bus bars and transformers.

### Claim 4 (depends on 2)

The system of claim 2, further comprising the power converter being operative to pre-charge from a DC-side subsequent to a power outage.

### Claim 5 (depends on 1)

The system of claim 1, further comprising the plant controller being operative to control a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include active power (P), reactive power (Q), voltage (V), and/or frequency (f).

### Claim 6 (depends on 1)

The system of claim 1, further comprising the plant controller being operative to control a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include operation modes of being connected, disconnected, grid-forming (GFM) operation, and grid-following (GFL) operation.

### Claim 7 (depends on 1)

The system of claim 1, further comprising the plant controller being operative to monitor a present state of the plurality of BESSs including a state of charge (SoC).

### Claim 8 (depends on 1)

The system of claim 1, further including an auxiliary power supply circuit including an auxiliary power system, an auxiliary transformer, and an auxiliary circuit breaker;
wherein the plant controller is in communication with and operatively connected to the auxiliary power circuit; and
wherein the auxiliary power supply is connectable via the auxiliary circuit breaker to the bus bar.

### Claim 9

A method of controlling an operation mode of an energy system including a battery energy storage system (BESS), the method comprising:
providing a plant controller in communication with and operably connected to a plurality of battery energy storage systems (BESSs);
wherein each of the plurality of BESSs is composed of a plurality of BESS enclosures, a bus bar, a bus coupler, and a plurality of BESS circuit breakers;
wherein each of the plurality of BESSs is connectable via a respective one of the plurality of BESS circuit breakers to the bus bar to supply electric power to an electric grid;
wherein the bus bar includes the bus coupler;
controlling, via the plant controller, the bus coupler to separate the plurality of BESSs into a first network and a second network;
arranging the plant controller to control the first network to operate the power plant in a self-supply mode when the bus coupler is in an open state; and
arranging the plant controller to control the second network to operate the power plant in black-start mode when the bus coupler is in the open state.

### Claim 10 (depends on 9)

The method of claim 9, wherein each of the plurality of BESSs comprises a BESS that is composed of a plurality of BESS enclosures, a power converter, and a transformer.

### Claim 11 (depends on 10)

The method of claim 10, further comprising performing, via the power converter, a grid-forming (GFM) operation to energize bus bars and transformers.

### Claim 12 (depends on 10)

The method of claim 10, further comprising pre-charging the power converter from a DC-side subsequent to a power outage.

### Claim 13 (depends on 9)

The method of claim 9, further comprising controlling, via the plant controller, a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include active power (P), reactive power (Q), voltage (V), and/or frequency (f).

### Claim 14 (depends on 9)

The method of claim 9, further comprising controlling, via the plant controller, a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include operation modes of being connected, disconnected, grid-forming (GFM) operation, and grid-following (GFL) operation.

### Claim 15 (depends on 9)

The method of claim 9, further comprising monitoring, via the plant controller, a present state of the plurality of BESSs including a state of charge (SoC).

### Claim 16 (depends on 9)

The method of claim 9, further comprising providing an auxiliary power supply circuit including an auxiliary power system, an auxiliary transformer, and an auxiliary circuit breaker in communication with and operatively connected to the plant controller; and
selectively connecting, via the plant controller, the auxiliary power supply via the auxiliary circuit breaker to the bus bar.

### Claim 17

A power plant comprising:
a plurality of BESSs;
an electric grid;
a plant controller in communication with and operative connected to the plurality of BESSs;
an external supervisory control and data acquisition (SCADA) system, wherein the plant controller is in communication with the external SCADA system;
a substation controller in communication with the plant controller;
wherein each of the plurality of BESSs is composed of a plurality of BESS enclosures, a bus bar, a bus coupler, and a plurality of BESS circuit breakers;
wherein each of the plurality of BESSs is connectable via a respective one of the plurality of BESS circuit breakers to the bus bar to supply electric power to the electric grid;
wherein the substation controller is operatively connected to the plurality of BESS circuit breakers;
wherein the bus bar includes the bus coupler;
wherein the plant controller is arranged to control the bus coupler to separate the plurality of BESSs into a first network and a second network;
wherein the plant controller is arranged to control the first network to operate the power plant in a self-supply mode when the bus coupler is in an open state; and
wherein the plant controller is arranged to control the second network to operate the power plant in black-start mode when the bus coupler is in the open state.

### Claim 18 (depends on 17)

The power plant of claim 17, further comprising the plant controller being operative to control a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include active power (P), reactive power (Q), voltage (V), and/or frequency (f).

### Claim 19 (depends on 17)

The power plant of claim 17, further comprising the plant controller being operative to control a plurality of setpoints for each of the plurality of BESSs, wherein the setpoints include operation modes of being connected, disconnected, grid-forming (GFM) operation, and grid-following (GFL) operation.

### Claim 20 (depends on 17)

The power plant of claim 17, further comprising the plant controller being operative to monitor a present state of the plurality of BESSs including a state of charge (SoC).