# US 2026/0093243 A1 · Method and system for generating optimized workshop schedules

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0093243 A1
- Document ID: US20260093243A1
- Status: Published application
- Kind: A1
- Application number: 18/898,748
- Filed: 2024-09-27
- Published: 2026-04-02
- Earliest claimed: 2024-09-27
- Assignees: Honeywell International Inc.
- Applicants: Honeywell International Inc.
- Inventors: Quan Long; Riad Mohamed
- Web page: https://patentgrep.com/patent/US20260093243A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 19/41875: {characterised by quality surveillance of production}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A system and method for generating optimized workshop schedules is disclosed, involving a multi-step process that integrates data collection, optimization, and machine learning. The method begins by collecting production data and routing information from an Enterprise Resource Planning (ERP) system or an Enterprise Data Warehouse (EDW) system. An optimization model then generates an initial workshop production schedule based on the collected data. This schedule is subsequently fine-tuned to create an enriched schedule that incorporates alternative routing information and more realistic data constraints. A supervised Machine Learning (ML) model is trained using the enriched schedule to learn the embedded data constraints and objectives. Finally, the trained ML model is deployed to generate highly accurate workshop schedules, ensuring efficient and effective production processes. This method enhances scheduling accuracy and operational efficiency in manufacturing environments.

## Claims

### Claim 1

A method for generating optimized workshop schedules, comprising:
collecting production data and routing information from an Enterprise Resource Planning (ERP) system or an Enterprise Data Warehouse (EDW) system;
generating, by an optimization model, a workshop production schedule based on the collected production data and the collected routing information;
fine-tuning the workshop production schedule to create an enriched schedule comprising at least alternative routing information, wherein the fine-tuning of the workshop production schedule includes at least one of:
balancing workloads among one or more resources in a workshop; and
adjusting the workshop production schedule based on real-time information in the workshop;
training a supervised Machine Learning (ML) model to learn data constraints and one or more operational targets for generating an optimized workshop schedule based on the created enriched schedule; and
deploying the trained ML model to generate a final schedule for use in the workshop based on the learned data constraints and the learned operational targets.

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein the production data collected from the ERP or EDW systems includes at least one of:
production orders;
routing information;
labor capacities;
material availabilities; and
work-in-progress requirements.

### Claim 3 (depends on 2)

The method as claimed in claim 2, wherein the optimization model configured to:
minimize production costs;
maximize production efficiency; and
adhere to production limitations, including deadlines and resource availability in the workshop.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein the optimization model further configured to:
adhere to labor and/or machine capacities; and
adhere to routing sequences, setup time, or alternative work centers production limitations in the workshop.

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein balancing the workloads among the one or more resources in the workshop includes:
reallocating the one or more resources by shifting work from one or more overloaded machines to one or more under loaded machines in the workshop.

### Claim 6 (depends on 1)

The method as claimed in claim 1, wherein adjusting the workshop production schedule comprises adjusting start times of production orders if materials and/or labor are not available as initially scheduled.

### Claim 7 (depends on 1)

The method as claimed in claim 1, wherein the enriched schedule further comprising one or more of:
addition of realistic data constraints based on up-to-date production data including machine capabilities, maintenance schedules, workforce availability, shift patterns, and material handling limitations;
start and end times for tasks;
precise machine loading levels; and
specific resource allocations.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein the supervised ML model is trained using a dataset that includes at least one of:
material numbers;
order quantities;
work centers; and
start and end times of production tasks.

### Claim 9 (depends on 1)

The method as claimed in claim 1, wherein the trained ML model configured to:
identify overloaded machines;
generate corrective actions to redistribute tasks to under loaded machines; and
balancing the workload across the workshop.

### Claim 10 (depends on 1)

The method as claimed in claim 1, wherein the training of ML model comprises capturing of the workshop production schedule including the basic limitations and initial information.

### Claim 11 (depends on 1)

The method as claimed in claim 1, further comprising:
capturing alternative routings of manufacturing processes and facilitating the generation of new schedules via a cloud-based user interface.

### Claim 12

A system for generating optimized workshop schedules, comprising:
an acquiring module configured to collect production data and routing information from an Enterprise Resource Planning (ERP) system or an Enterprise Data Warehouse (EDW) system;
an optimization module configured to operatively run an optimization model to generate a workshop production schedule based on the collected production data and the collected routing information;
a fine-tuning module configured to tune the workshop production schedule to create an enriched schedule comprising at least alternative routing information, wherein the fine-tuning of the workshop production schedule includes at least one of:
balancing workloads among one or more resources in a workshop; and
adjusting the workshop production schedule based on real-time information in the workshop; and
a Machine Learning (ML) module configured to operatively run a supervised ML model to learn data constraints and one or more operational targets for generating an optimized workshop schedule based on the created enriched schedule, wherein the ML module being further configured to generate a final schedule for use in the workshop based on the learned data constraints and the learned operational targets.

### Claim 13 (depends on 12)

The system as claimed in claim 12, wherein the acquiring unit configured to collect the production data from the ERP or EDW systems includes at least one of:
production orders;
routing information;
labor capacities;
material availabilities; and
work-in-progress requirements.

### Claim 14 (depends on 12)

The system as claimed in claim 12, wherein the optimization module operatively runs the optimization model configured to:
minimize production costs;
maximize production efficiency; and
adhere to production limitations, including deadlines and resource availability in the workshop.

### Claim 15 (depends on 12)

The system as claimed in claim 12, wherein the optimization model further configured to:
adhere to labor and/or machine capacities; and
adhere to routing sequences, setup time, or alternative work centers production limitations in the workshop.

### Claim 16 (depends on 12)

The system as claimed in claim 12, wherein balancing the workloads among the one or more resources in the workshop includes reallocating the one or more resources by shifting work from one or more overloaded machines to one or more under loaded machines in the workshop, and wherein adjusting the workshop production schedule comprises adjusting start times of production orders if materials and/or labor are not available as initially scheduled.

### Claim 17 (depends on 12)

The system as claimed in claim 12, wherein the Machine Learning (ML) module configured to train the ML model using a dataset that includes at least one of:
material numbers;
order quantities;
work centers; and
start and end times of production tasks.

### Claim 18 (depends on 12)

The system as claimed in claim 12, wherein the trained ML model further configured to:
identify overloaded machines;
generate corrective actions to redistribute tasks to under loaded machines; and
balancing the workload across the workshop.

### Claim 19 (depends on 12)

The system as claimed in claim 12, wherein the trained ML model further configured to capture the workshop production schedule including the basic limitations and initial information.

### Claim 20

A non-transitory computer-readable medium having stored thereon computer-readable instructions that, when executed by a processor, cause the processor to execute a method for generating optimized workshop schedules, comprising:
collecting production data and routing information from an Enterprise Resource Planning (ERP) system or an Enterprise Data Warehouse (EDW) system;
generating, by an optimization model, a workshop production schedule based on the collected production data and the collected routing information;
fine-tuning the workshop production schedule to create an enriched schedule comprising at least alternative routing information, wherein the fine-tuning of the workshop production schedule includes at least one of:
balancing workloads among one or more resources in a workshop; and
adjusting the workshop production schedule based on real-time information in the workshop;
training a supervised Machine Learning (ML) model to learn data constraints and one or more operational targets for generating an optimized workshop schedule based on the created enriched schedule; and
deploying the trained ML model to generate a final schedule for use in the workshop based on the learned data constraints and the learned operational targets.
