# US 2026/0093219 A1 · Methods and systems for generating a summary of a proposed building automation system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0093219 A1
- Document ID: US20260093219A1
- Status: Published application
- Kind: A1
- Application number: 19/347,262
- Filed: 2025-10-01
- Published: 2026-04-02
- Earliest claimed: 2024-10-01
- Applicants: Honeywell International Inc.
- Inventors: Aman RAI; Deepika SANDEEP; Guru MUDUR; Vikas NIGDE; Banuprakash BALAKRISHNA; Renil Austin MENDEZ; Souvik SARDAR
- Web page: https://patentgrep.com/patent/US20260093219A1

## CPC

- G05B 15/02: electric
- G06Q 50/08: Construction
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06F 30/27: using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 10/067: Enterprise or organisation modelling
- G06Q 10/101: Collaborative creation, e.g. joint development of products or services
- G06V 30/10: Character recognition
- G06F 2111/20: Configuration CAD, e.g. designing by assembling or positioning modules selected from libraries of predesigned modules
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06V: IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING

## Abstract

A list of equipment to implement a proposed building automation system may be generated based at least in part on a sequence of operation that describes how the proposed building automation system is to operate. A master standard library of different building automation system components includes a sequence of operation and an IO table for each of the different building automation system components. The sequence of operation that describes how the proposed building automation system is to operate, along with the master standard library of different building automation system components, are provided to a Large Language Model, which is prompted to generate the list of equipment based at least in part on the sequence of operation that describes how the proposed building automation system is to operate and the master standard library of different building automation system components. The list of equipment is outputted.

## Claims

### Claim 1

A method for generating a list of equipment to implement a proposed building automation system based at least in part on a sequence of operation that describes how the proposed building automation system is to operate, the method comprising:
storing a master standard library of different building automation system components, wherein the master standard library includes a sequence of operation and an IO table for each of the different building automation system components;
providing the sequence of operation that describes how the proposed building automation system is to operate, along with the master standard library of different building automation system components, to a Large Language Model;
prompting the Large Language model to generate the list of equipment based at least in part on the sequence of operation that describes how the proposed building automation system is to operate and the master standard library of different building automation system components; and
outputting the list of equipment.

### Claim 2 (depends on 1)

The method of claim 1, wherein the list of equipment includes an identifier for each of the different building automation system components of the master standard library that are needed to implement the proposed building automation system.

### Claim 3 (depends on 1)

The method of claim 1, wherein the list of equipment includes a quantity of each of the different building automation system components needed to implement the proposed building automation system.

### Claim 4 (depends on 1)

The method of claim 1, wherein the list of equipment includes an IO table that identifies points associated with each of the different building automation system components needed to implement the proposed building automation system.

### Claim 5 (depends on 1)

The method of claim 1, wherein the sequence of operation that describes how the proposed building automation system is to operate is in a natural language text format.

### Claim 6 (depends on 1)

The method of claim 1, comprising:
storing one or more mechanical drawings that show at least part of the proposed building automation system in a floor plan format;
applying Optical Character Recognition and/or pattern recognition to the one or more mechanical drawings to identify one or more of the different building automation system components of the proposed building automation system; and
providing the identity of one or more of the different building automation system components of the proposed building automation system identified in the one or more mechanical drawings to the Large Language Model, wherein the Large Language model generates the list of equipment based at least in part on the sequence of operation that describes how the proposed building automation system is to operate, the master standard library of different building automation system components, and the one or more of the different building automation system components of the proposed building automation system identified in the one or more mechanical drawings.

### Claim 7 (depends on 1)

The method of claim 1, comprising:
storing one or more schedule tables for at least part of the proposed building automation system;
providing the one or more schedule tables, the sequence of operation that describes how the proposed building automation system is to operate, and the master standard library of different building automation system components to the Large Language Model; and
prompting the Large Language model to generate the list of equipment based at least in part on the one or more schedule tables, the sequence of operation that describes how the proposed building automation system is to operate, and the master standard library of different building automation system components.

### Claim 8 (depends on 1)

The method of claim 1, comprising outputting a Bill of Quantity for the proposed building automation system, wherein the Bill of Quantity includes the list of equipment.

### Claim 9 (depends on 8)

The method of claim 8, wherein the list of equipment includes an IO table that identifies points associated with one or more of the different building automation system components needed to implement the proposed building automation system.

### Claim 10 (depends on 1)

The method of claim 1, comprising:
storing one or more specifications associated with the proposed building automation system;
providing the one or more specifications associated with the proposed building automation system, the sequence of operation that describes how the proposed building automation system is to operate, and the master standard library of different building automation system components to the Large Language Model; and
prompting the Large Language model to generate the list of equipment based at least in part on the one or more specifications associated with the proposed building automation system, the sequence of operation that describes how the proposed building automation system is to operate, and the master standard library of different building automation system components.

### Claim 11 (depends on 1)

The method of claim 1, comprising:
wherein the Large Language Model identifies two or more different building automation system components of the master standard library that are a best match for at least part of the sequence of operation that describes how the proposed building automation system is to operate.

### Claim 12 (depends on 11)

The method of claim 11, comprising:
receiving a selection of one of the two or more different building automation system components of the master standard library that are the best match; and
adding the selected one of the two or more different building automation system components of the master standard library that are the best match to the list of equipment and not adding the non-selected ones of the two or more different building automation system components of the master standard library to the list of equipment.

### Claim 13

A method for identifying a quantity of each of a plurality of different building automation system components needed to implement a proposed building automation system, the method comprising:
storing one or more schedule tables for at least part of the proposed building automation system;
applying Optical Character Recognition to the one or more schedule tables, resulting in one or more text readable schedule tables;
providing the one or more text readable schedule tables to a Large Language Model;
prompting the Large Language model to generate the quantity of each of the plurality of different building automation system components needed to implement a proposed building automation system based at least in part on one or more of the text readable schedule tables; and
outputting the quantity of each of the plurality of different building automation system components needed to implement a proposed building automation system.

### Claim 14 (depends on 13)

The method of claim 13, comprising:
storing one or more mechanical drawings that show at least part of the proposed building automation system in a floor plan format;
applying Optical Character Recognition and/or pattern recognition to the one or more mechanical drawings to identify one or more of the different building automation system components of the proposed building automation system; and
providing the identity of one or more of the different building automation system components of the proposed building automation system identified in the one or more mechanical drawings to the Large Language Model, wherein the Large Language model generates the quantity of each of the plurality of different building automation system components needed to implement the proposed building automation system based at least in part on the one or more of the different building automation system components of the proposed building automation system identified in the one or more mechanical drawings.

### Claim 15 (depends on 13)

The method of claim 13, comprising prompting the Large Language model to generate a list of equipment in addition to the quantity of each of the plurality of different building automation system components needed to implement a proposed building automation system.

### Claim 16 (depends on 15)

The method of claim 15, wherein the Large Language Model generating the list of equipment based at least in part on a sequence of operation that describes how the proposed building automation system is to operate and a master standard library of different building automation system components.

### Claim 17 (depends on 13)

The method of claim 13, wherein the one or more schedule tables for at least part of the proposed building automation system are generated as part of a Request For Proposal (RFP).

### Claim 18

A method for generating an IO summary for at least part of a proposed building automation system based at least in part on a sequence of operation that describes how the proposed building automation system is to operate, the method comprising:
storing a master standard library of different building automation system components, wherein the master standard library includes a sequence of operation and an IO summary for each of the different building automation system components;
providing the sequence of operation that describes how the proposed building automation system is to operate, along with the master standard library of different building automation system components, to a Large Language Model;
prompting the Large Language model to generate the IO summary for at least part of the proposed building automation system based at least in part on the sequence of operation that describes how the proposed building automation system is to operate and the master standard library of different building automation system components; and
outputting the IO summary.

### Claim 19 (depends on 18)

The method of claim 18, comprising:
prompting the Large Language model to generate a list of equipment based at least in part on the sequence of operation that describes how the proposed building automation system is to operate and the master standard library of different building automation system components.

### Claim 20 (depends on 18)

The method of claim 18, wherein:
the Large Language Model identifying two or more different building automation system components of the master standard library that are a best match for at least part of the sequence of operation that describes how the proposed building automation system is to operate;
receiving a selection of one of the two or more different building automation system components of the master standard library that are the best match; and
adding the selected one of the two or more different building automation system components of the master standard library that are the best match to the IO summary and not adding the non-selected ones of the two or more different building automation system components of the master standard library to the IO summary.
