# US 2026/0092594 A1 · System and method for estimating wind farm power output

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0092594 A1
- Document ID: US20260092594A1
- Status: Published application
- Kind: A1
- Application number: 19/322,931
- Filed: 2025-09-09
- Published: 2026-04-02
- Earliest claimed: 2024-09-27
- Assignees: Bp P.L.C.
- Applicants: Bp P.L.C.
- Inventors: Leong Kit Gan
- Web page: https://patentgrep.com/patent/US20260092594A1

## CPC

- F03D 17/021: {for monitoring power or current}
- F03D 17/006: {Estimation methods}
- F03D 17/007: {Wind farm monitoring}
- F03D 80/002: {Micro-siting, i.e. process through which the specific location or arrangement of wind turbine is determined}
- F05B 2200/11: Sum
- F05B 2200/12: Subtraction
- F05B 2200/13: Product
- F05B 2200/14: Division
- F05B 2200/22: Power
- F05B 2260/84: Modelling or simulation
- F05B 2270/3202: "cut-in" or starting wind speed
- F05B 2270/321: Wind directions
- F05B 2270/335: Output power or torque
- F05B 2270/342: Wave conditions, e.g. amplitude, frequency or direction
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G

## Abstract

A system and method for predicting power output of a wind farm are disclosed. The method includes determining first and second parameter values of a power curve for a plurality of wind turbines. A second relationship is determined between the densities associated with the wind turbines and the values of the first parameter. A third relationship is determined between the densities associated with the wind turbines and the values of the second parameter. A value of the first parameter for a specified wind farm density is determined based on the second relationship. A value of the second parameter for the specified wind farm density is determined based on the third relationship. An indication of a power output for the specified wind farm density is generated by applying the determined values of the first and second parameters to the power curve.

## Claims

### Claim 1

A method, comprising:
determining a value of a first parameter of a first relationship between a wind speed and a power output for each of a plurality of wind turbines;
determining a value of a second parameter of the first relationship for each of the plurality of wind turbines, wherein the values of the first parameter and the second parameter are based on historical power output data for each of the plurality of wind turbines, and wherein at least some of the plurality of wind turbines are associated with wind farms having different densities;
determining a second relationship between the densities associated with the wind turbines and the values of the first parameter;
determining a third relationship between the densities associated with the wind turbines and the values of the second parameter;
determining a value of the first parameter for a specified wind farm density based on the second relationship;
determining a value of the second parameter for the specified wind farm density based on the third relationship; and
generating an indication of a power output for the specified wind farm density by applying the determined values of the first and second parameters to the first relationship.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first relationship comprises:
f
r
(
v
)
=
s
+
b
[
1
+
e
-
r
⁡
(
v
-
v
t
)
]
p
-
c
,
wherein v is a value of an incident wind speed, s is a value of a power output saturation, r is a value of a rate of growth, vt is a value of wind speed range associated with a greatest rate of change of power, p is a value of a shaping parameter, and b and c are constants chosen such that fr(vcut-in)=0 and fr(vcut-out)=s, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, a power output saturation, a rate of growth, a wind speed range associated with a greatest rate of change of power, or a shaping parameter.

### Claim 3 (depends on 2)

The method of claim 2, wherein the first relationship further comprises:
f
g
(
v
,
w
)
=
f
r
(
v
)
⁢
(
1
-
p
h
(
e
-
s
⁢
❘
"\[LeftBracketingBar]"
w
-
p
c
❘
"\[RightBracketingBar]"
p
s
)
)
,
wherein w is a value of an incident wind direction, pc is a value of a wake peak center, ph is a value of a wake peak height, and ps is a value of a wake peak width, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, an incident wind direction, a power output saturation, a rate of growth, a wind speed range associated with a greatest rate of change of power, a shaping parameter, a wake peak center, a wake peak height, or a wake peak width.

### Claim 4 (depends on 1)

The method of claim 1, wherein the second relationship comprises a first curve fitted to the values of the first parameter as a function of wind farm density, and wherein the third relationship comprises a second curve fitted to the values of the second parameter as a function of wind farm density.

### Claim 5 (depends on 4)

The method of claim 4, wherein determining the first value comprises determining a value of the first curve for the specified wind farm density, and wherein determining the second value comprises determining a value of the second curve for the specified wind farm density.

### Claim 6 (depends on 1)

The method of claim 1, wherein the values of the first parameter and the second parameter are further based on simulated power output data for a plurality of simulated wind turbines having different densities.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
receiving an indication of a secondary power output of a secondary source in an electrical system;
estimating a total power output for the electrical system by aggregating the power output for the specified wind farm density and the secondary power output;
receiving a load demand signal indicating a load demand of a load; and
controlling a flow of wind energy into the electrical system based on an assessment of the power output for the specified wind farm density, the indication of the secondary power output, the total power output for the electrical system, and the load demand signal.

### Claim 8

An electronic device, comprising:
one or more processors; and
a memory coupled to the one or more processors and storing instructions that, when executed by the one or more processors, cause the electronic device to be configured to:
determine a value of a first parameter of a first relationship between a wind speed and a power output for each of a plurality of wind turbines;
determine a value of a second parameter of the first relationship for each of the plurality of wind turbines, wherein the values of the first parameter and the second parameter are based on historical power output data for each of the plurality of wind turbines, and wherein at least some of the plurality of wind turbines are associated with wind farms having different densities;
determine a second relationship between the densities associated with the wind turbines and the values of the first parameter;
determine a third relationship between the densities associated with the wind turbines and the values of the second parameter;
determine a value of the first parameter for a specified wind farm density based on the second relationship;
determine a value of the second parameter for the specified wind farm density based on the third relationship; and
generate an indication of a power output for the specified wind farm density by applying the determined values of the first and second parameters to the first relationship.

### Claim 9 (depends on 8)

The electronic device of claim 8, wherein the first relationship comprises:
f
r
(
v
)
=
s
+
b
[
1
+
e
-
r
⁡
(
v
-
v
t
)
]
p
-
c
,
wherein v is a value of an incident wind speed, s is a value of a power output saturation, r is a value of a rate of growth, vt is a value of wind speed range associated with a greatest rate of change of power, p is a value of a shaping parameter, and b and c are constants chosen such that fr(vcut-in)=0 and fr(vcut-out)=s, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, a power output saturation, a rate of growth, a wind speed region associated with a greatest rate of change of power, or a shaping parameter.

### Claim 10 (depends on 9)

The electronic device of claim 9, wherein the first relationship further comprises:
f
g
(
v
,
w
)
=
f
r
(
v
)
⁢
(
1
-
p
h
(
e
-
s
⁢
❘
"\[LeftBracketingBar]"
w
-
p
c
❘
"\[RightBracketingBar]"
p
s
)
)
,
wherein w is a value of an incident wind direction, pc is a value of a wake peak center, ph is a value of a wake peak height, and ps is a value of a wake peak width, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, an incident wind direction, a power output saturation, a rate of growth, a wind speed region associated with a greatest rate of change of power, a shaping parameter, a wake peak center, a wake peak height, or a wake peak width.

### Claim 11 (depends on 8)

The electronic device of claim 8, wherein the second relationship comprises a first curve fitted to the values of the first parameter as a function of wind farm density, and wherein the third relationship comprises a second curve fitted to the values of the second parameter as a function of wind farm density.

### Claim 12 (depends on 11)

The electronic device of claim 11, wherein determining the first value comprises determining a value of the first curve for the specified wind farm density, and wherein determining the second value comprises determining a value of the second curve for the specified wind farm density.

### Claim 13 (depends on 8)

The electronic device of claim 8, wherein the values of the first parameter and the second parameter are further based on simulated power output data for a plurality of simulated wind turbines having different densities.

### Claim 14 (depends on 8)

The electronic device of claim 8, wherein stored instructions, when executed by the one or more processors, cause the electronic device to be further configured to:
receive an indication of a secondary power output of a secondary source in the electrical system;
estimate a total power output for the electrical system by aggregating the power output for the specified wind farm density and the secondary power output;
receive a load demand signal indicating a load demand of a load; and
control a flow of wind energy into the electrical system based on an assessment of the power output for the specified wind farm density, the indication of the secondary power output, the total power output for the electrical system, and the load demand signal.

### Claim 15 (depends on 8)

The electronic device of claim 8, further comprising a display device for displaying the indication of a power output.

### Claim 16

A non-transitory computer-readable medium storing instructions that, when executed by one or more processors of an electronic device, cause the electronic device to be configured to:
determine a value of a first parameter of a first relationship between a wind speed and a power output for each of a plurality of wind turbines;
determine a value of a second parameter of the first relationship for each of the plurality of wind turbines, wherein the values of the first parameter and the second parameter are based on historical power output data for each of the plurality of wind turbines, and wherein at least some of the plurality of wind turbines are associated with wind farms having different densities;
determine a second relationship between the densities associated with the wind turbines and the values of the first parameter;
determine a third relationship between the densities associated with the wind turbines and the values of the second parameter;
determine a value of the first parameter for a specified wind farm density based on the second relationship;
determine a value of the second parameter for the specified wind farm density based on the third relationship; and
generate an indication of a power output for the specified wind farm density by applying the determined values of the first and second parameters to the first relationship.

### Claim 17 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein the first relationship comprises:
f
r
(
v
)
=
s
+
b
[
1
+
e
-
r
⁡
(
v
-
v
t
)
]
p
-
c
,
wherein v is a value of an incident wind speed, s is a value of a power output saturation, r is a value of a rate of growth, vt is a value of wind speed range associated with a greatest rate of change of power, p is a value of a shaping parameter, and b and c are constants chosen such that fr(vcut-in)=0 and fr(vcut-out)=s, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, a power output saturation, a rate of growth, a wind speed range associated with a greatest rate of change of power, or a shaping parameter.

### Claim 18 (depends on 17)

The non-transitory computer-readable medium of claim 17, wherein the first relationship further comprises:
f
g
(
v
,
w
)
=
f
r
(
v
)
⁢
(
1
-
p
h
(
e
-
s
⁢
❘
"\[LeftBracketingBar]"
w
-
p
c
❘
"\[RightBracketingBar]"
p
s
)
)
,
wherein w is a value of an incident wind direction, pc is a value of a wake peak center, ph is a value of a wake peak height, and ps is a value of a wake peak width, and
wherein each of the first parameter and the second parameter is one of an incident wind speed, an incident wind direction, a power output saturation, a rate of growth, a wind speed range associated with a greatest rate of change of power, a shaping parameter, a wake peak center, a wake peak height, or a wake peak width.

### Claim 19 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein the second relationship comprises a first curve fitted to the values of the first parameter as a function of wind farm density, and wherein the third relationship comprises a second curve fitted to the values of the second parameter as a function of wind farm density.

### Claim 20 (depends on 19)

The non-transitory computer-readable medium of claim 19, wherein determining the first value comprises determining a value of the first curve for the specified wind farm density, and wherein determining the second value comprises determining a value of the second curve for the specified wind farm density.

### Claim 21 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein the values of the first parameter and the second parameter are further based on simulated power output data for a plurality of simulated wind turbines having different densities.

### Claim 22 (depends on 16)

The non-transitory computer-readable medium of claim 16, further configured to:
receive an indication of a secondary power output of a secondary source in the electrical system;
estimate a total power output for the electrical system by aggregating the power output for the specified wind farm density and the secondary power output;
receive a load demand signal indicating a load demand of a load; and
control a flow of wind energy into the electrical system based on an assessment of the power output for the specified wind farm density, the indication of the secondary power output, the total power output for the electrical system, and the load demand signal.
