# US 2026/0092370 A1 · Chemical process enhancement through modulation of gas or pressure control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0092370 A1
- Document ID: US20260092370A1
- Status: Published application
- Kind: A1
- Application number: 19/067,312
- Filed: 2025-02-28
- Published: 2026-04-02
- Earliest claimed: 2024-10-01
- Assignees: Applied Materials, Inc.
- Applicants: Applied Materials, Inc.
- Inventors: Sameh HELMY; Edy CARDONA; Christopher S. OLSEN
- Web page: https://patentgrep.com/patent/US20260092370A1

## CPC

- C23C 16/45557: {Pulsed pressure or control pressure}
- C23C 16/45561: {Gas plumbing upstream of the reaction chamber}
- C23C 16/4412: {Details relating to the exhausts, e.g. pumps, filters, scrubbers, particle traps}
- C23C 16/45502: {Flow conditions in reaction chamber}
- C23C 16/45519: {Inert gas curtains}
- C23C 16/45523: {Pulsed gas flow or change of composition over time}
- C23C 16/45565: {Shower nozzles}
- C23C: COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL (making metal-coated products by extrusion B21C23/22; covering with metal by connecting pre-existing layers to articles, see the relevant places, e.g. B21D39/00, B23K; metallising of glass C03C; metallising mortars, concrete, artificial stone, ceramics or natural stone C04B41/00; enamelling of, or applying a vitreous layer to, metals C23D; treating metal surfaces or coating of metals by electrolysis or electrophoresis C25D; single-crystal film growth C30B; by metallising textiles D06M11/83; decorating textiles by locally metallising D06Q1/04)

## Abstract

The present disclosure generally relates to modulating pressure within an inner chamber of a processing chamber and/or modulating velocity of a processing gas. The processing chamber comprises a chamber, a gas inlet configured to flow processing gas into the chamber, an exhaust configured to remove processing gas from the chamber, a substrate holder disposed between the gas inlet and the exhaust, and a first injector configured to pulse inert or process gas into the chamber. In one embodiment, the processing chamber further comprises a second injector configured to pulse the inert gas into the chamber, where the first injector pulses inert gas before the substrate holder and the second injector pulses inert gas after the substrate holder. In another embodiment, the processing chamber comprises a pressure control valve configured to close or partially close being processing of a substrate to constrict the exhaust.

## Claims

### Claim 1

A processing chamber, comprising:
an inner chamber;
a gas inlet disposed on a first end of the inner chamber, the gas inlet being configured to flow processing gas into the inner chamber;
an exhaust disposed on a second end of the chamber opposite the first end, the exhaust being coupled to a pump configured to remove processing gas from the inner chamber;
a substrate holder disposed between the gas inlet and the exhaust, the substrate holder being configured to hold one or more substrates;
a first gas injector for injecting gas between the gas inlet and the substrate holder, the first gas injector being configured to pulse an inert gas or a processing gas into the inner chamber a first time;
a second gas injector for injecting gas between the substrate holder and the exhaust, the second gas injector being configured to pulse the inert or processing gas into the inner chamber a second time; and
a controller coupled to the first and second gas injectors, the controller being configured to control the first and second gas injectors such that the timing of the pulses of the inert or processing gas the first and second times are synchronized.

### Claim 2 (depends on 1)

The processing chamber of claim 1, wherein the gas inlet is a showerhead.

### Claim 3 (depends on 2)

The processing chamber of claim 2, wherein the first gas injector is disposed within the showerhead.

### Claim 4 (depends on 1)

The processing chamber of claim 1, wherein the processing chamber is a vertical batch chamber.

### Claim 5 (depends on 4)

The processing chamber of claim 4, further comprising furnace PCV valves for controlling gas flow through the exhaust, the PCV valve synchronized with the first and second gas injectors.

### Claim 6 (depends on 1)

The processing chamber of claim 1, wherein the controller is configured to:
pulse the inert or processing gas the first time period after the processing gas is flowing into the inner chamber; and
pulse the inert or processing gas the second time period after the processing gas is flowing into the inner chamber, the second time period different than the first time period.

### Claim 7 (depends on 1)

The processing chamber of claim 1, further comprising multi-injects configured to inject additional processing gas into the inner chamber at a location between the first and second gas injectors.

### Claim 8

A processing chamber, comprising:
an inner chamber;
a gas inlet disposed on a first end of the inner chamber, the gas inlet being configured to flow processing gas into the inner chamber;
an exhaust disposed on a second end of the inner chamber opposite the first end, the exhaust being coupled to a pump configured to remove processing gas from the inner chamber;
a substrate holder disposed between the gas inlet and the exhaust, the substrate holder being configured to hold one or more substrates;
a pressure control valve (PCV) coupled to the exhaust, the PCV configured to close or partially close during processing of a substrate to constrict the exhaust; and
a gas injector configured to pulse inert or process gas into the inner chamber.

### Claim 9 (depends on 8)

The processing chamber of claim 8, wherein the gas injector injects gas to a location between the gas inlet and the substrate holder.

### Claim 10 (depends on 8)

The processing chamber of claim 8, wherein the gas injector is configured to inject or processing gas between the substrate holder and the PCV.

### Claim 11 (depends on 8)

The processing chamber of claim 8, further comprising a controller configured to synchronize the gas injector and the PCV valve to modulate pressure within the inner chamber.

### Claim 12 (depends on 8)

The processing chamber of claim 8, wherein the gas inlet is a showerhead.

### Claim 13 (depends on 8)

The processing chamber of claim 8, further comprising multi-injects configured to inject additional processing gas into the inner chamber.

### Claim 14

A processing system, comprising:
a processing chamber, the processing chamber comprising:
an inner chamber;
a gas inlet disposed on a first end of the inner chamber, the gas inlet being configured to flow processing gas into the inner chamber;
an exhaust disposed on a second end of the inner chamber opposite the first end, the exhaust being coupled to a pump configured to remove processing gas from the inner chamber;
a substrate holder disposed between the gas inlet and the exhaust, the substrate holder being configured to hold one or more substrates;
a first gas injector disposed between the gas inlet and the substrate holder, the first gas injector being configured to pulse an inert or processing gas into the inner chamber a first time;
a second gas injector disposed between the substrate holder and the exhaust, the second gas injector being configured to pulse the inert or processing gas into the inner chamber a second time; and
a controller coupled to the first and second gas injectors, the controller being configured to control the first and second gas injectors such that the timing of the pulses of the inert or processing gas the first and second times are synchronized.

### Claim 15 (depends on 14)

The processing system of claim 14, wherein the gas inlet is a showerhead.

### Claim 16 (depends on 15)

The processing system of claim 15, wherein the first gas injector is disposed within the showerhead.

### Claim 17 (depends on 14)

The processing system of claim 14, wherein the processing chamber is a vertical batch chamber.

### Claim 18 (depends on 17)

The processing system of claim 17, further comprising furnace PCV valves for controlling gas flow through the exhaust, the PCV valve synchronized with the first and second gas injectors.

### Claim 19 (depends on 14)

The processing system of claim 14, wherein the controller is configured to:
pulse the inert or processing gas the first time after the processing gas is flowing into the inner chamber; and
pulse the inert or processing gas the second time after the processing gas is flowing into the inner chamber.

### Claim 20 (depends on 14)

The processing system of claim 14, further comprising multi-injects configured to inject additional processing gas into the inner chamber.
