# US 2026/0091939 A1 · Method for Four-Way Shuttle Storage Allocation and Interface Definition

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0091939 A1
- Document ID: US20260091939A1
- Status: Published application
- Kind: A1
- Application number: 19/201,741
- Filed: 2025-05-07
- Published: 2026-04-02
- Earliest claimed: 2024-09-29
- Assignees: Bullseye Intelligent Logistics Equipment (Suzhou) Co., Ltd.
- Applicants: Bullseye Intelligent Logistics Equipment (Suzhou) Co.,Ltd.
- Inventors: Youcai Shen; Jian Shen; Libin Kuai; Xiangming Wang; Linhua Chen
- Web page: https://patentgrep.com/patent/US20260091939A1

## CPC

- B65G 1/1373: {for fulfilling orders in warehouses}
- B65G 1/0492: {with cars adapted to travel in storage aisles}
- G06Q 10/047: Optimisation of routes or paths, e.g. travelling salesman problem
- G06Q 10/06316: {Sequencing of tasks or work}
- G06Q 10/0639: Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q 10/087: Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q 30/0206: {Price or cost determination based on market factors}
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method for four-way shuttle storage allocation and interface definition. The decomposition of tasks and the generation of subtasks are recorded in the database, and the execution state of tasks, such as execution start and execution completion, are recorded in the database. When a device failure or system power outage occurs during operation, the unfinished tasks are continued after recovery without affecting the entire process. The method is applicable to any tasks assigned to the storage location, including the warehouse moving task, the cargo tallying task and the warehouse returning task. A first subtask assigned to the cargo location roadway entrance is created, and a second subtask to the cargo location is created after the completion of the first subtask. The method reduces the traffic jam when allocating cargo space for four-way dense storage, and improved the efficiency of storage and retrieval.

## Claims

### Claim 1

A method for four-way shuttle storage allocation and interface definition, comprising:
S1: A warehouse management system decomposes a main task of storage allocation into two subtasks: a first subtask, transporting an item from a starting point to an aisle entrance of a storage location, and a second subtask, transporting the item from the aisle entrance to a designated storage position; the warehouse management system then sequentially associated the two subtasks with the main task and is stored in a database;
S2: When the management system executes the main task, issues the first subtask based on associated subtasks in the main task; after the first subtask is completed, the warehouse management system evaluates occupancy status of the storage location within the aisle, generates the second subtask accordingly, and records it in the database;
S3: A warehousing scheduling system, upon receiving the first subtask assigned by the warehouse management system, dispatches handling equipment to execute the first subtask and reports execution status to the warehouse management system;
S4: The warehouse management system, upon receiving the execution status of the first subtask from the warehousing scheduling system, determines that the item has reached aisle entrance of the storage location and marks the first subtask as complete in the database; it then evaluates occupancy status of the storage location, generates a second subtask to transport the item from the aisle entrance to the storage location, and issues the second subtask to the warehouse scheduling system;
S5: The warehouse scheduling system, upon receiving the second subtask from the warehouse management system, dispatches handling equipment to execute the second task and reports execution status to the warehouse management system;
S6: The warehouse management system, upon receiving the execution status of the second subtask, updates the database to reflect the execution status of the second subtask and completion status of the main task.

### Claim 2 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein the first subtask and the second subtask are sequential tasks, the first subtask must be executed before the second subtask.

### Claim 3 (depends on 2)

The method for four-way shuttle storage allocation and interface definition in claim 2, wherein during the execution of the first subtask, the execution of another subtask may change the occupancy status of the storage location within the aisle, and the generation of the second subtask is based on logical conditions determined after the completion of the first subtask.

### Claim 4 (depends on 3)

The method for four-way shuttle storage allocation and interface definition in claim 3, wherein the second subtask is generated based on the occupancy status of the storage location.

### Claim 5 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein types of equipment, characteristics of item, structure of the aisle, and task priority must be considered when decomposing a task in S1.

### Claim 6 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein S2, strategies in scheduling tasks include:
Task sequencing: sort first subtasks based on task priority and aisle occupancy status, ensuring that higher-priority tasks or tasks in unoccupied aisles are issued first;
Path planning: determine optimal path for task execution based on aisle structure, equipment type and characteristics of item;
Load balancing: distribute tasks among different handling equipment to prevent overloading and to maintain overall operational efficiency.

### Claim 7 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein S3, if handling equipment malfunctions during the execution of the first subtask, timely repair or replacement of the equipment is required and the task is rescheduled; if the item is damaged or lost, take prompt action and update the item information in the database; if the aisle is blocked, take immediate measures such as clearing obstacles or adjusting task path.

### Claim 8 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein S4, during the generation and issuance of the second subtask, if certain storage locations within the aisle are occupied, a new available storage location is selected for the second subtask; if execution time of the first subtask changes, adjust issuance time of the second subtask; if the status of the handling equipment changes, adjust the equipment assigned to execute the second subtask.

### Claim 9 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein S5, during the execution of the second subtask, the execution status is monitored in real-time, including its start, in-progress, and completion stages; the status of the handling equipment is monitored in real-time, including its operational and fault statuses; and the status of the item is monitored in real-time, including whether it has reached the target storage location and whether it has been damaged.

### Claim 10 (depends on 1)

The method for four-way shuttle storage allocation and interface definition in claim 1, wherein S6, after completion of the main task, following analyses are required:
Efficiency analysis: analyze completion time of the tasks and utilization rates of handling equipment to evaluate warehousing efficiency;
Cost analysis: analyze transportation costs and equipment maintenance costs of the tasks to evaluate costs;
Optimization analysis: based on data analysis results, optimize task decomposition, path planning, and equipment scheduling to improve efficiency and reduce costs.