# US 2026/0091861 A1 · Cage Deployment System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0091861 A1
- Document ID: US20260091861A1
- Status: Published application
- Kind: A1
- Application number: 19/346,163
- Filed: 2025-09-30
- Published: 2026-04-02
- Earliest claimed: 2024-10-01
- Assignees: Oceaneering International, Inc.
- Applicants: Oceaneering International, Inc.
- Inventors: Torleif CARLSEN
- Web page: https://patentgrep.com/patent/US20260091861A1

## CPC

- B63G 8/001: {Underwater vessels adapted for special purposes, e.g. unmanned underwater vessels; Equipment specially adapted therefor, e.g. docking stations (self-propelled or direction controlled diving chambers with mechanical link to a base B63C11/42)}
- B63B 2027/165: {Deployment or recovery of underwater vehicles using lifts or hoists}
- B63G 2008/007: {by means of a physical link to a base, e.g. wire, cable or umbilical}
- B63G: OFFENSIVE OR DEFENSIVE ARRANGEMENTS ON VESSELS; MINE-LAYING; MINE-SWEEPING; SUBMARINES; AIRCRAFT CARRIERS (means of attack or defence in general, e.g. turrets F41H)
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)

## Abstract

Cage deployment system (1) typically comprises a remotely powered/controlled lift; a module guide adapted to ensure that a selectively removable and insertable seabed module self-aligns into a cage extension; and a subsea cage operatively connected to the remotely powered/controlled lift. Cage deployment system (1) may be used by positioning remotely operated vehicle (ROV) (500) in subsea cage (200); inserting subsea module (400) into skid slot (203) of subsea cage (200); deploying cage deployment system (1) to a predetermined location at sea; using remotely powered/controlled lift (100) as a lowering mechanism to lower subsea cage (200) to and deploying it proximate seabed (2); allowing ROV (500) to exit subsea cage (200); allowing subsea cage (200) to release subsea module interlock (220) and thereby secure seabed module (400); lowering seabed module (400) from subsea cage (200) to a seabed location.

## Claims

### Claim 1

1) A cage deployment system, comprising:
a) a remotely powered/controlled lift;
b) a module guide adapted to ensure that a selectively removable and insertable seabed module self-aligns into a cage extension; and
c) a subsea cage operatively connected to the remotely powered/controlled lift, the subsea cage comprising:
i) a housing;
ii) a quick connect lifting interface operatively connected to the housing and configured to selectively connect or disconnect to the subsea module; and
iii) a skid slot disposed at least partially within the housing and defining the cage extension.

### Claim 2 (depends on 1)

2) The cage deployment system of claim 1, wherein:
a) the subsea cage comprises a subsea in-field cage that weighs less than two metric tons; and
b) the cage deployment system does not require a remotely operated vehicle (ROV) for support.

### Claim 3 (depends on 1)

3) The cage deployment system of claim 1, wherein the housing comprises a domed upper portion and a substantially rectangular frame dimensioned to accept the selectively removable and insertable seabed module therein.

### Claim 4 (depends on 3)

4) The cage deployment system of claim 3, wherein the substantially rectangular frame comprises:
a) an elevator; and
b) an elevator mover.

### Claim 5 (depends on 4)

5) The cage deployment system of claim 4, wherein the elevator comprises a subsea module interlock.

### Claim 6 (depends on 5)

6) The cage deployment system of claim 5, wherein the subsea module interlock comprises a movable flap, a scissor jack, a linear jack, or the like.

### Claim 7 (depends on 1)

7) The cage deployment system of claim 1, wherein the cage deployment system is field cage installable.

### Claim 8 (depends on 1)

8) The cage deployment system of claim 1, wherein the lift line that is used to lower/retrieve subsea modules can be rerouted to function as a handling/lifting system using an ROV or the subsea cage as a counter.

### Claim 9 (depends on 1)

9) A method for installation of the cage deployment system of claim 1, comprising:
a) positioning a remotely operated vehicle (ROV) in the subsea cage;
b) inserting a subsea module into the skid slot of the subsea cage;
c) deploying the cage deployment system to a predetermined location at sea;
d) deploying the subsea cage subsea;
e) using the remotely powered/controlled lift to lower the subsea cage to a seabed;
f) allowing the ROV to exit the subsea cage;
g) allowing the subsea cage to release the subsea module interlock securing the seabed module;
h) lowering the seabed module from the subsea cage to a seabed location;
i) using the ROV to disconnect the lifting interface from the subsea cage;
j) spooling the lift line back into the subsea cage;
k) using the ROV to drive/operate an extension system to lift the subsea module; and
l) shifting the subsea cage to a predetermined position.

### Claim 10 (depends on 9)

10) The method for installation of the cage deployment system of claim 9, further comprising deploying the ROV.

### Claim 11 (depends on 9)

11) The method for installation of the cage deployment system of claim 9, wherein the predetermined position comprises an optimal operational location subsea.

### Claim 12 (depends on 9)

12) The method for installation of the cage deployment system of claim 9, further comprising allowing the subsea cage to continue to pay out the lift line in case in cases where there is no heave compensation.

### Claim 13 (depends on 9)

13) The method for installation of the cage deployment system of claim 9, further comprising:
a) shifting the subsea cage position to vertically align the subsea cage with the subsea module;
b) using the subsea cage to pay out the lift line;
c) using the ROV to connect the lift line to the subsea module;
d) using the ROV to drive/operate an extension/stability mechanism to a docking position;
e) using the subsea cage to hoist the seabed module into the subsea cage; and
f) using the subsea cage to lock the subsea module in place within the subsea cage.

### Claim 14 (depends on 13)

14) The method of claim 13, wherein the ROV is allowed to continue work or dock into the subsea cage after the subsea module is locked in place.

### Claim 15 (depends on 11)

15) The method of claim 11, wherein the subsea cage pays out more lift line than what is needed.