# US 2026/0089720 A1 · Frequency hopping processing method and device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0089720 A1
- Document ID: US20260089720A1
- Status: Published application
- Kind: A1
- Application number: 19/111,743
- Filed: 2022-09-27
- Published: 2026-03-26
- Earliest claimed: 2022-09-27
- Assignees: Beijing Xiaomi Mobile Software Co., Ltd.
- Applicants: Beijing Xiaomi Mobile Software Co., Ltd.
- Inventors: Lei WANG
- Web page: https://patentgrep.com/patent/US20260089720A1

## CPC

- H04W 72/1268: of uplink data flows
- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04B 1/7143: Arrangements for generation of hop patterns
- H04L 5/0098: {Signalling of the activation or deactivation of component carriers, subcarriers or frequency bands}
- H04W 72/0453: Resources in frequency domain, e.g. a carrier in FDMA
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

The present disclosure provides a frequency hopping processing method and device. A terminal receives one or more first offsets configured for the terminal by a base station. The first offset is an available frequency domain offset corresponding to two adjacent hops when the terminal transmits a PUSCH in a frequency hopping mode within a frequency domain resource range occupied by an uplink BWP. When the two adjacent hops are located in the same first time unit in the time domain and the occupied frequency domain resource meets a specified condition, the terminal determines a target offset of the two adjacent hops at least based on the first offsets; and based on the target offset, the terminal transmits the PUSCH to the base station in the frequency hopping mode in the first time unit.

## Claims

### Claim 1

A frequency hopping processing method, performed by a terminal, comprising:
receiving one or more first offsets configured by a base station for the terminal, wherein the first offset is an available frequency domain offset corresponding to two adjacent hops when the terminal transmits a physical uplink shared channel (PUSCH) using frequency hopping within a frequency domain resource range occupied by an uplink bandwidth part (BWP);
in case where the two adjacent hops are in a same first time unit in a time domain and frequency domain resources occupied meet a specified condition, determining a target offset of the two adjacent hops at least based on the one or more first offsets;
transmitting the PUSCH to the base station using frequency hopping in the first time unit, based on the target offset.

### Claim 2 (depends on 1)

The method of claim 1, wherein the specified condition comprises any one of:
the two adjacent hops respectively occupying frequency domain resources of an uplink subband and frequency domain resources of the uplink BWP; wherein, the uplink subband is located within the first time unit in the time domain, and a transmission direction of information on the uplink subband is different from a transmission direction of information within the first time unit;
the two adjacent hops occupying the frequency domain resources of the uplink subband; or
the two adjacent hops occupying the frequency domain resources of the uplink BWP.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
receiving one or more second offsets configured by the base station for the terminal, wherein the second offset is an available frequency domain offset corresponding to the two adjacent hops when the terminal transmits the PUSCH using frequency hopping within a frequency domain resource range occupied by the uplink subband.

### Claim 4 (depends on 3)

The method of claim 3, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink subband, determining one of the one or more second offsets as the target offset based on a protocol agreement; or
determining a second offset scheduled by the base station as the target offset.

### Claim 5 (depends on 3)

The method of claim 3, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink BWP, determining one of the one or more first offsets as the target offset based on a protocol agreement; or
determining a first offset scheduled by the base station as the target offset.

### Claim 6 (depends on 2)

The method of claim 2, wherein the one or more first offsets are configured by the base station for the terminal based on a first number of resource blocks occupied by the uplink subband.

### Claim 7

(canceled)

### Claim 8 (depends on 2)

The method of claim 2, wherein the one or more first offsets are configured by the base station for the terminal based on a second number of resource blocks occupied by the uplink BWP.

### Claim 9 (depends on 8)

The method of claim 8, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
determining a specified offset scheduled by the base station for the terminal as the target offset; wherein, the specified offset is one offset scheduled by the base station for the terminal in the one or more first offsets based on a first number of resource blocks occupied by the uplink subband.

### Claim 10 (depends on 8)

The method of claim 8, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
determining a candidate offset in the one or more first offsets based on a protocol agreement or a scheduling of the base station;
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink BWP, determining the candidate offset as the target offset;
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink subband, determining the target offset based on the candidate offset; wherein, the target offset is a frequency domain offset that enables all frequency domain resources occupied by the latter hop to be within the frequency domain resource range occupied by the uplink subband.

### Claim 11

A frequency hopping processing method, performed by a base station, comprising:
configuring one or more first offsets for a terminal, wherein the first offset is an available frequency domain offset corresponding to two adjacent hops when the terminal transmits a physical uplink shared channel (PUSCH) using frequency hopping within a frequency domain resource range occupied by an uplink bandwidth part (BWP);
in case that the two adjacent hops are in a same first time unit in a time domain and frequency domain resources occupied meet a specified condition, determining a target offset of the two adjacent hops at least based on the one or more first offsets;
receiving the PUSCH transmitted by the terminal using frequency hopping in the first time unit, based on the target offset.

### Claim 12 (depends on 11)

The method of claim 11, wherein the specified condition comprises any one of:
the two adjacent hops respectively occupying frequency domain resources of an uplink subband and frequency domain resources of the uplink BWP; wherein, the uplink subband is located within the first time unit in the time domain, and a transmission direction of information on the uplink subband is different from a transmission direction of information within the first time unit;
the two adjacent hops occupying the frequency domain resources of the uplink subband; or
the two adjacent hops occupying the frequency domain resources of the uplink BWP.

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
configuring one or more second offsets for the terminal, wherein the second offset is an available frequency domain offset corresponding to two adjacent hops when the terminal transmits the PUSCH using frequency hopping within a frequency domain resource range occupied by the uplink subband.

### Claim 14 (depends on 13)

The method of claim 13, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink subband, determining one of the one or more second offsets as the target offset based on a protocol agreement; or
determining a second offset scheduled by the base station for the terminal as the target offset.

### Claim 15 (depends on 13)

The method of claim 13, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink BWP, determining one of the one or more first offsets as the target offset based on a protocol agreement; or
determining a first offset scheduled by the base station for the terminal as the target offset.

### Claim 16 (depends on 12)

The method of claim 12, wherein configuring one or more first offsets for the terminal comprises:
configuring one or more first offsets for the terminal based on a first number of resource blocks occupied by the uplink subband.

### Claim 17

(canceled)

### Claim 18 (depends on 12)

The method of claim 12, wherein configuring one or more first offsets for the terminal comprises:
configuring one or more first offsets for the terminal based on a second number of resource blocks occupied by the uplink BWP.

### Claim 19 (depends on 18)

The method of claim 18, further comprising:
scheduling a specified offset for the terminal in the one or more first offsets based on a first number of resource blocks occupied by the uplink subband;
determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
determining the specified offset as the target offset.

### Claim 20 (depends on 18)

The method of claim 18, wherein determining the target offset of the two adjacent hops at least based on the one or more first offsets comprises:
determining a candidate offset in the one or more first offsets based on a protocol agreement or a scheduling of the base station;
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink BWP, determining the candidate offset as the target offset;
in response to determining that a latter hop of the two adjacent hops occupies the frequency domain resources of the uplink subband, determining the target offset based on the candidate offset; wherein, the target offset is a frequency domain offset that enables all frequency domain resources occupied by the latter hop to be within the frequency domain resource range occupied by the uplink subband.

### Claim at position 21

21-22. (canceled)

### Claim 23

A terminal, comprising:
a processor; and
a memory, configured to store instructions executable by the processor;
wherein the processor is configured to run the instructions, so as to:
receive one or more first offsets configured by a base station for the terminal, wherein the first offset is an available frequency domain offset corresponding to two adjacent hops when the terminal transmits a physical uplink shared channel (PUSCH) using frequency hopping within a frequency domain resource range occupied by an uplink bandwidth part (BWP);
in case that the two adjacent hops are in a same first time unit in a time domain and frequency domain resources occupied meet a specified condition, determine a target offset of the two adjacent hops at least based on the one or more first offsets;
transmit the PUSCH to the base station using frequency hopping in the first time unit. based on the target offset.

### Claim 24 (depends on 11)

A base station, comprising:
a processor; and
a memory, configured to store instructions executable by the processor;
wherein the processor is configured to execute the method according to claim 11.
