# US 2026/0089645 A1 · Transmission power control techniques for scheduling requests

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0089645 A1
- Document ID: US20260089645A1
- Status: Published application
- Kind: A1
- Application number: 19/234,139
- Filed: 2025-06-10
- Published: 2026-03-26
- Earliest claimed: 2024-09-24
- Assignees: QUALCOMM Incorporated
- Applicants: QUALCOMM Incorporated
- Inventors: Linhai HE; Yi HUANG
- Web page: https://patentgrep.com/patent/US20260089645A1

## CPC

- H04W 52/146: {Uplink power control}
- H04W 72/1268: of uplink data flows
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Methods, systems, and devices for wireless communications are described. A user equipment (UE) may use an uplink transmission power for transmitting a scheduling request (SR) that is based on whether a transmit power control (TPC) timer has expired. For example, after receiving a TPC command, the UE may start the TPC timer. In cases where the TPC timer is running when the UE transmits the SR, the UE may calculate the uplink transmission power in accordance with a first technique. Alternatively, if the TPC timer expires prior to transmission of the SR, the UE may determine the uplink transmission power in accordance with a second technique associated with power ramping of the uplink transmission power. In such cases, the UE may use an initial uplink transmission power for an initial SR transmission, and the UE may increment a power offset for the uplink transmission power for retransmissions of the SR.

## Claims

### Claim 1

An apparatus, comprising:
one or more memories storing processor-executable code; and
one or more processors coupled with the one or more memories and individually or collectively operable to execute the code to cause the apparatus to:
receive a control message comprising a transmit power control command for one or more uplink transmissions;
start a transmit power control timer in response to receiving the transmit power control command; and
transmit one or more scheduling requests via a physical uplink control channel, wherein an uplink transmission power for the one or more scheduling requests is based at least in part on whether the transmit power control timer has expired.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the one or more scheduling requests are transmitted prior to an expiration of the transmit power control timer, and the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
calculate the uplink transmission power for the one or more scheduling requests based at least in part on the transmit power control timer running, wherein the calculated uplink transmission power is based at least in part on a power control parameter, a bandwidth of the physical uplink control channel, a path loss estimate, a physical uplink control channel offset parameter, a physical uplink control channel power adjustment parameter, a power control adjustment state indicated by the transmit power control command, a threshold transmit power, or any combination thereof.

### Claim 3 (depends on 1)

The apparatus of claim 1, wherein the one or more scheduling requests are transmitted after an expiration of the transmit power control timer, and the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
determine a first uplink transmission power for a first scheduling request of the one or more scheduling requests based at least in part on the expiration of the transmit power control timer, wherein the first scheduling request is transmitted using the first uplink transmission power.

### Claim 4 (depends on 3)

The apparatus of claim 3, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
transmit, based at least in part on the first scheduling request being unsuccessful, a second scheduling request of the one or more scheduling requests after transmitting the first scheduling request, wherein the second scheduling request is transmitted using a second uplink transmission power that is greater than the first uplink transmission power by a power offset value.

### Claim 5 (depends on 4)

The apparatus of claim 4, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
receive a message indicating a set of power offset values, wherein the power offset value is from the set of power offset values.

### Claim 6 (depends on 5)

The apparatus of claim 5, wherein each power offset value of the set of power offset values corresponds to a respective trigger type associated with the one or more scheduling requests.

### Claim 7 (depends on 4)

The apparatus of claim 4, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
increment the power offset value for respective scheduling requests of the one or more scheduling requests that are transmitted after the second scheduling request, wherein the power offset value is incremented until the uplink transmission power satisfies a threshold uplink transmission power or until a second uplink power control command is received.

### Claim 8 (depends on 3)

The apparatus of claim 3, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
receive a second control message comprising an indication of a set of uplink transmission powers that includes at least the first uplink transmission power, wherein determining the first uplink transmission power is based at least in part on receiving the second control message.

### Claim 9 (depends on 8)

The apparatus of claim 8, wherein each uplink transmission power of the set of uplink transmission powers corresponds to respective trigger type for transmitting the one or more scheduling requests.

### Claim 10 (depends on 3)

The apparatus of claim 3, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
receive a third control message comprising an indication of a range of uplink transmission powers that includes at least the first uplink transmission power; and
select the first uplink transmission power from the range of uplink transmission powers based at least in part on one or more transmission power parameters associated with prior transmissions, wherein the first uplink transmission power is determined in accordance with the selection.

### Claim 11 (depends on 10)

The apparatus of claim 10, wherein the one or more transmission power parameters comprise one or more uplink transmission powers associated with successful scheduling requests, one or more path loss measurements associated with the successful scheduling requests, or any combination thereof.

### Claim 12 (depends on 3)

The apparatus of claim 3, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
select the first uplink transmission power based at least in part on an output of one or more machine learning models, wherein the one or more machine learning models use a set of parameters associated with a set of prior transmissions.

### Claim 13 (depends on 1)

The apparatus of claim 1, wherein, to transmit the one or more scheduling requests, the one or more processors are individually or collectively operable to execute the code to cause the apparatus to:
transmit a group of consecutive scheduling requests in accordance with a set of transmission occasions; and
start a prohibit timer after transmitting the group of consecutive scheduling requests.

### Claim 14 (depends on 13)

The apparatus of claim 13, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
receive a fourth control message indicating a quantity of scheduling requests included in the group of consecutive scheduling requests, wherein transmitting the group of consecutive scheduling requests is based at least in part on the fourth control message.

### Claim 15 (depends on 13)

The apparatus of claim 13, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
apply respective uplink transmission powers to each scheduling request of the group of consecutive scheduling requests based at least in part on whether the transmit power control timer has expired.

### Claim 16 (depends on 13)

The apparatus of claim 13, wherein the one or more processors are individually or collectively further operable to execute the code to cause the apparatus to:
apply a fourth uplink transmission power for each scheduling request of the group of consecutive scheduling requests, wherein an additional group of consecutive scheduling requests transmitted after the group of consecutive scheduling requests uses a fifth uplink transmission power that is greater than the fourth uplink transmission power.

### Claim 17

A method for wireless communications, comprising:
receiving a control message comprising a transmit power control command for one or more uplink transmissions;
starting a transmit power control timer in response to receiving the transmit power control command; and
transmitting one or more scheduling requests via a physical uplink control channel, wherein an uplink transmission power for the one or more scheduling requests is based at least in part on whether the transmit power control timer has expired.

### Claim 18 (depends on 17)

The method of claim 17, wherein the one or more scheduling requests are transmitted prior to an expiration of the transmit power control timer, the method further comprising:
calculating the uplink transmission power for the one or more scheduling requests based at least in part on the transmit power control timer running, wherein the calculated uplink transmission power is based at least in part on a power control parameter, a bandwidth of the physical uplink control channel, a path loss estimate, a physical uplink control channel offset parameter, a physical uplink control channel power adjustment parameter, a power control adjustment state indicated by the transmit power control command, a threshold transmit power, or any combination thereof.

### Claim 19 (depends on 17)

The method of claim 17, wherein the one or more scheduling requests are transmitted after an expiration of the transmit power control timer, the method further comprising:
determining a first uplink transmission power for a first scheduling request of the one or more scheduling requests based at least in part on the expiration of the transmit power control timer, wherein the first scheduling request is transmitted using the first uplink transmission power.

### Claim 20

An apparatus for wireless communications, comprising:
means for receiving a control message comprising a transmit power control command for one or more uplink transmissions;
means for starting a transmit power control timer in response to receiving the transmit power control command; and
means for transmitting one or more scheduling requests via a physical uplink control channel, wherein an uplink transmission power for the one or more scheduling requests is based at least in part on whether the transmit power control timer has expired.
