# US 2026/0089568 A1 · Systems and methods for cell capacity estimation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0089568 A1
- Document ID: US20260089568A1
- Status: Published application
- Kind: A1
- Application number: 18/895,689
- Filed: 2024-09-25
- Published: 2026-03-26
- Earliest claimed: 2024-09-25
- Assignees: Verizon Patent and Licensing Inc.
- Applicants: Verizon Patent and Licensing Inc.
- Inventors: Jignesh S. Panchal; John N. Wakim
- Web page: https://patentgrep.com/patent/US20260089568A1

## CPC

- H04W 28/16: Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
- H04W 28/0226: {based on location or mobility (handoff or reselection H04W36/00; mobile application services making use of the location of users or terminals H04W4/02)}
- H04W 64/003: {locating network equipment}
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Systems and methods provide a total cell capacity estimation process that accounts for variability of spectral efficiency (SE) within a cell and enables optimized cell adjustments. A network device obtains field data of user equipment (UE) devices for a cell and assigns, based on the field data, multiple zones within the cell. Each of the multiple zones corresponds to a different link adaptation setting for UE devices. The network device computes a total data transfer capacity in a band for each zone of the multiple zones, and estimates a current available remaining data transfer capacity for each zone of the multiple zones based on the field data and the total data transfer capacity for each zone.

## Claims

### Claim 1

A method comprising:
obtaining, by a computing device, field data of user equipment (UE) devices for a cell;
assigning, by the computing device and based on the field data, multiple zones within the cell, wherein each of the multiple zones corresponds to a different link adaptation setting for UE devices;
computing, by the computing device, a total data transfer capacity in a band, for each zone of the multiple zones; and
estimating, by the computing device, a current available remaining data transfer capacity for each zone of the multiple zones based on the field data and the total data transfer capacity for each zone; and
adjusting, based on the estimating, a data transfer capacity in one of the multiple zones.

### Claim 2 (depends on 1)

The method of claim 1, wherein the adjusting further comprises:
adjusting a modulation and coding scheme (MCS) to increase capacity in one of the multiple zones and decrease capacity in another one of the multiple zones.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
projecting, by the computing device, a future available remaining data transfer capacity for each zone of the multiple zones based on the field data and a data transfer capacity for each zone.

### Claim 4 (depends on 1)

The method of claim 1, wherein computing the total data transfer capacity includes allocating all shared data channel physical resource blocks (PRBs) available for the cell among the multiple zones.

### Claim 5 (depends on 4)

The method of claim 4, wherein the allocating includes allocating data channel PRBs based on a number of users and types of service in each zone of the multiple zones.

### Claim 6 (depends on 1)

The method of claim 1, wherein estimating the current available remaining data transfer capacity further includes:
estimating a first data transfer capacity for Fixed Wireless Access (FWA) services; and
estimating a second data transfer capacity for mobility services.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
receiving a proposal for a Fixed Wireless Access (FWA) installation, wherein the proposal identifies a location of a FWA device;
associating the location of a FWA device with a zone of the multiple zones; and
accepting or denying the proposal based on the location of a FWA device and the current available remaining data transfer capacity of the zone.

### Claim 8 (depends on 7)

The method of claim 7, wherein receiving the proposal further includes receiving data transfer requirements for the FWA device.

### Claim 9 (depends on 1)

The method of claim 1, wherein each of the multiple zones corresponds to:
a different Physical Downlink Control Channel (PDCCH) grant aggregation level, or
a different channel quality indicator (CQI) or rank indicator (RI).

### Claim 10 (depends on 1)

The method of claim 1, wherein computing the total data transfer capacity includes:
computing a total downlink (DL) data transfer capacity, or
computing a total uplink (UL) data transfer capacity.

### Claim 11

A network device, comprising:
a processor configured to:
obtain field data of user equipment (UE) devices for a cell;
assign, based on the field data, multiple zones within the cell, wherein each of the multiple zones corresponds to a different link adaptation setting for UE devices;
compute a total data transfer capacity for each zone of the multiple zones; and
estimate a current available remaining data transfer capacity for each zone of the multiple zones based on the field data and the total data transfer capacity for each zone.

### Claim 12 (depends on 11)

The network device of claim 11, wherein the processor is further configured to:
adjust, based on the current available remaining data transfer capacity for each zone, a modulation and coding scheme (MCS) to increase capacity in one of the multiple zones and decrease capacity in another one of the multiple zones.

### Claim 13 (depends on 11)

The network device of claim 11, wherein the field data includes Physical Uplink Shared Channel (PUSCH) signal-to-interference and noise-ratio (SINR) measurements or Physical Downlink Control Channel (PDCCH) grant aggregation levels.

### Claim 14 (depends on 11)

The network device of claim 11, wherein, when computing the total data transfer capacity, the processor is further configured to:
allocate all shared data channel physical resource blocks (PRBs) available for the cell among the multiple zones.

### Claim 15 (depends on 11)

The network device of claim 11, wherein the processor is further configured to:
project a future available remaining data transfer capacity for each zone of the multiple zones based on the field data and the total data transfer capacity for each zone.

### Claim 16 (depends on 11)

The network device of claim 11, wherein, when estimating the current available remaining data transfer capacity, the processor is further configured to:
estimate a first data transfer capacity for Fixed Wireless Access (FWA) services; and
estimate a second data transfer capacity for mobility services.

### Claim 17 (depends on 11)

The network device of claim 11, wherein each of the multiple zones corresponds to a different Physical Downlink Control Channel (PDCCH) grant aggregation level or a different channel quality indicator (CQI).

### Claim 18

A non-transitory computer-readable medium storing instructions, which are executable by one or more processors, for:
obtaining, by a computing device, field data of user equipment (UE) devices for a cell;
assigning, by the computing device and based on the field data, multiple zones within the cell, wherein each of the multiple zones corresponds to a different link adaptation setting for UE devices;
computing, by the computing device, a total data transfer capacity for each zone of the multiple zones;
estimating, by the computing device, a current available remaining data transfer capacity for each zone of the multiple zones based on the field data and the total data transfer capacity for each zone; and
adjusting, based on the estimating, a data transfer capacity in one of the multiple zones.

### Claim 19 (depends on 17)

The non-transitory computer-readable medium of claim 17, further comprising instructions for:
adjusting, based on the current available remaining data transfer capacity for each zone, a modulation and coding scheme (MCS) to increase capacity in one of the multiple zones and decrease capacity in another one of the multiple zones.

### Claim 20 (depends on 18)

The non-transitory computer-readable medium of claim 18, wherein each of the multiple zones corresponds to a different Physical Downlink Control Channel (PDCCH) grant aggregation level or a different channel quality indicator (CQI).
