# US 2026/0089236 A1 · Infrastructure and scheduling service layers for scheduling forwarding of endpoint processing unit computation results through a network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0089236 A1
- Document ID: US20260089236A1
- Status: Published application
- Kind: A1
- Application number: 19/227,460
- Filed: 2025-06-04
- Published: 2026-03-26
- Earliest claimed: 2024-09-21
- Assignees: Delos Data Inc.
- Applicants: Delos Data Inc.
- Inventors: Daniel P. Daly; Edward V. E. Doe; Alain J. E. Gravel
- Web page: https://patentgrep.com/patent/US20260089236A1

## CPC

- H04L 45/24: Multipath
- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/5027: {the resource being a machine, e.g. CPUs, Servers, Terminals}
- G06F 9/5083: {Techniques for rebalancing the load in a distributed system}
- G06F 9/547: {Remote procedure calls [RPC]; Web services}
- H04L 45/123: {Evaluation of link metrics (techniques for monitoring network metrics H04L43/08)}
- H04L 47/33: using forward notification
- H04L 67/10: in which an application is distributed across nodes in the network (software deployment G06F8/60; multiprogramming arrangements G06F9/46)
- H04L 67/1001: for accessing one among a plurality of replicated servers
- H04L 67/60: Scheduling or organising the servicing of application requests, e.g. requests for application data transmissions using the analysis and optimisation of the required network resources (admission control or resource allocation H04L47/70)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Some embodiments provide a method of managing communication between endpoint processing units (EPUs) through a network having multiple forwarding elements. Sets of the EPUs execute operations associated with multiple distributed applications. The method provides a first set of infrastructure services to configure multiple forwarding elements to implement multiple virtual private clouds (VPCs) with each VPC connecting different sets of EPUs that execute different distributed applications. The method provides, for each VPC, a second set of scheduling services to schedule forwarding of results computed by the VPC's EPUs through the forwarding elements that form the VPC.

## Claims

### Claim 1

A method of managing communication between endpoint processing units (EPUs) through a network comprising a plurality of forwarding elements, sets of the EPUs executing operations associated with a plurality of distributed applications, the method comprising:
providing a first set of infrastructure services to configure a plurality of forwarding elements to implement a plurality of virtual private clouds (VPCs) with each VPC connecting different sets of EPUs that execute different distributed applications; and
providing, for each VPC, a second set of scheduling services to schedule forwarding of results computed by the VPC's EPUs through the plurality of forwarding elements that form the VPC.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first set of infrastructure services are implemented by a first set of servers that configure the pluralities forwarding elements to implement the plurality of VPCs.

### Claim 3 (depends on 2)

The method of claim 2, wherein the first set of infrastructure services are further implemented by a second set of servers that collect telemetry data from the forwarding elements and provide the collected telemetry data to the first set of servers to analyze to determine whether the configuration of any plurality of forwarding elements need to be modified in order to modify the associated VPC.

### Claim 4 (depends on 3)

The method of claim 3, wherein the first set of servers modifies the configuration of the plurality of forwarding elements for a VPC when based on the telemetry data collected from the plurality of forwarding elements the first set of servers determines that one or more forwarding elements in the plurality of forwarding elements has degraded performance.

### Claim 5 (depends on 1)

The method of claim 1, wherein the different distributed applications executed by the EPUs of the different VPCs are different distributed applications or are different instances of the same distributed application.

### Claim 6 (depends on 1)

The method of claim 1, wherein
the EPUs operate in a set of one or more datacenters,
one or more infrastructure administrators of the set of datacenters use the infrastructure services to create different VPCs for different tenants of the datacenter, and
one or more tenant administrator of each VPC tenant use the scheduling services to scheduling the forwarding of the results of the VPC's EPU computations through the forwarding elements of the VPC.

### Claim 7 (depends on 6)

The method of claim 6 further comprising presenting, to a tenant administrator of a VPC, a presentation through a user interface that shows the EPUs of the VPC connected to a single logical switch.

### Claim 8 (depends on 1)

The method of claim 1, wherein the scheduling of the forwarding of a result computed by a first EPU comprises scheduling a launch time for starting to forward, from the first EPU, a data message flow comprising a plurality of data messages each of which has a payload storing a portion of the result.

### Claim 9 (depends on 1)

The method of claim 1, wherein the scheduling of the forwarding of a result computed by a first EPU comprises scheduling a transmission rate for forward, from the first EPU, a data message flow comprising a plurality of data messages each of which has a payload storing a portion of the result.

### Claim 10 (depends on 1)

The method of claim 1 further comprising providing a set of task services for each VPC to receive APIs associated with computations assigned to the VPC's plurality of EPUs, wherein each particular API for each particular computation is relayed to the scheduling service in order to specify a set of one or more scheduling parameters to configure one or more forwarding elements in the plurality of forwarding elements to schedule the forwarding of at least one result associated with the particular computation by at least one forwarding element in the plurality of forwarding elements.

### Claim 11

A system for managing communication between graphics processing units (GPUs) through a network comprising a plurality of forwarding elements, sets of the GPUs executing operations associated with a plurality of distributed applications, the system comprising:
a first set of infrastructure services to configure a plurality of forwarding elements to implement a plurality of virtual private clouds (VPCs) with each VPC connecting different sets of GPUs that execute different distributed applications; and
for each VPC, a second set of scheduling services to schedule forwarding of results computed by the VPC's GPUs through the plurality of forwarding elements that form the VPC.

### Claim 12 (depends on 11)

The system of claim 11, wherein the first set of infrastructure services are implemented by a first set of servers that configure the pluralities forwarding elements to implement the plurality of VPCs.

### Claim 13 (depends on 12)

The system of claim 12, wherein the first set of infrastructure services are further implemented by a second set of servers that collect telemetry data from the forwarding elements and provide the collected telemetry data to the first set of servers to analyze to determine whether the configuration of any plurality of forwarding elements need to be modified in order to modify the associated VPC.

### Claim 14 (depends on 13)

The system of claim 13, wherein the first set of servers modifies the configuration of the plurality of forwarding elements for a VPC when based on the telemetry data collected from the plurality of forwarding elements the first set of servers determines that one or more forwarding elements in the plurality of forwarding elements has degraded performance.

### Claim 15 (depends on 11)

The system of claim 11, wherein the different distributed applications executed by the GPUs of the different VPCs are different distributed applications or are different instances of the same distributed application.

### Claim 16 (depends on 11)

The system of claim 11, wherein
the GPUs operate in a set of one or more datacenters,
one or more infrastructure administrators of the set of datacenters use the infrastructure services to create different VPCs for different tenants of the datacenter, and
one or more tenant administrator of each VPC tenant use the scheduling services to scheduling the forwarding of the results of the VPC's GPU computations through the forwarding elements of the VPC.

### Claim 17 (depends on 16)

The system of claim 16, further comprising a set of servers to present, to a tenant administrator of a VPC, a presentation through a user interface that shows the GPUs of the VPC connected to a single logical switch.

### Claim 18 (depends on 11)

The system of claim 11, wherein the scheduling of the forwarding of a result computed by a first GPU comprises scheduling a launch time for starting to forward, from the first GPU, a data message flow comprising a plurality of data messages each of which has a payload storing a portion of the result.

### Claim 19 (depends on 11)

The system of claim 11, wherein the scheduling of the forwarding of a result computed by a first GPU comprises scheduling a transmission rate for forward, from the first GPU, a data message flow comprising a plurality of data messages each of which has a payload storing a portion of the result.

### Claim 20 (depends on 11)

The system of claim 11, wherein each set of scheduling services for each VPC is a different set of instances of a set of scheduling servers that provide the scheduling services.
