# US 2026/0089060 A1 · Energy accounting with data center integration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0089060 A1
- Document ID: US20260089060A1
- Status: Published application
- Kind: A1
- Application number: 19/274,217
- Filed: 2025-07-18
- Published: 2026-03-26
- Earliest claimed: 2024-09-25
- Assignees: QSecGrid, Inc.
- Applicants: QSecGrid, Inc.
- Inventors: Gordon R. WINSTON; John-Philip GALINSKI; Nigel WALKER; Mark THOMPSON; Patrick J.D. SANTOS
- Web page: https://patentgrep.com/patent/US20260089060A1

## CPC

- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- G05B 13/027: {using neural networks only}
- G06F 21/62: Protecting access to data via a platform, e.g. using keys or access control rules
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06F 40/30: Semantic analysis
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 30/018: Certifying business or products
- G06Q 50/06: Energy or water supply
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 3/0014: for preventing or reducing power oscillations in networks
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/008: Circuit arrangements for power supply or distribution technologies responsive to energy trading
- H02J 3/381: {Dispersed generators}
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 13/13: characterised by the transmission of data to equipment in the power network
- H04L 41/0823: characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability (for optimising operational conditions of wireless networks H04W24/02)
- H04L 41/0895: Configuration of virtualised networks or elements, e.g. virtualised network function or OpenFlow elements
- H04L 43/08: Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- G06F 2113/04: Power grid distribution networks
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

An energy accounting system for integration of one or more data centers may include a virtualization platform configured to interface with a plurality of server components. The plurality of the server components may be itemized into Integrated Distributed Energy Resources (IDERs). The energy accounting system may further include an Energy Orchestration Module (EOM) communicatively coupled with the virtualization platform. The EOM may be configured to aggregate the IDERs into a Virtual Power Plant (VPP) and may fetch telemetry data associated with the individual ones of the plurality of the server components. The EOM may further be configured to analyze the fetched telemetry data and the fetched workload data and may further generate data analysis products for benefit of energy optimization of the VPP.

## Claims

### Claim 1

An energy management system for integration of one or more data centres, comprising:
at least one virtualization platform configured to interface with a plurality of server components, wherein the individual ones of the interfaced plurality of server components are itemized into one or more integrated distributed energy resources (IDERs);
at least one energy orchestration module (EOM) communicatively coupled with the at least one virtualization platform, wherein the at least one EOM is configured to:
aggregate the one or more IDERs into at least one virtual power plant (VPP);
fetch telemetry data associated with the individual ones of the plurality of server components;
fetch workload data corresponding to individual ones of the aggregated IDERs from the at least one virtualization platform;
analyze one or more of the fetched telemetry data and the fetched workload data; and
generate one or more data analysis products for energy optimization of the at least one VPP based at least in part on the analysis of the one or more of the fetched telemetry data and the fetched workload data.

### Claim 2 (depends on 1)

The energy management system of claim 1, wherein the individual ones of the plurality of server components comprises at least one power transaction unit (PTU) configured for monitoring the telemetry data of the individual ones of the plurality of server components.

### Claim 3 (depends on 1)

The energy management system of claim 1, wherein the individual ones of the plurality of server components are integrated to at least one power distribution unit (PDU) configured for distributing power from a centralized power backbone to the individual ones of the plurality of server components.

### Claim 4 (depends on 1)

The energy management system of claim 1, wherein the at least one virtualization platform is further configured to itemize the individual ones of the interfaced plurality of server components at least in part by:
creating, from virtual server components, one or more virtual machines, one or more software containers, or a combination thereof; and
mapping the one or more virtual machines, the one or more software containers to the one or more IDERs within the at least one VPP.

### Claim 5 (depends on 4)

The energy management system of claim 4, wherein the at least one virtualization platform is further configured to:
track energy-allied activity of one or more of the one or more virtual machines, and the one more software containers; and
associate the one or more tracked software containers corresponding with the one or more IDERs and the at least one VPP.

### Claim 6 (depends on 4)

The energy management system of claim 4, wherein the at least one EOM is configured to fetch the mapping of one or more virtual machines, one more software containers to the one or more IDERs within the at least one VPP from the at least one virtualization platform.

### Claim 7 (depends on 1)

The energy management system of claim 1, wherein the at least one EOM is further configured to:
receive pre-defined mappings of the one or more virtual machines and one or more VPPs from an external source; and
store the received mappings in a parallel configuration within a virtualization database.

### Claim 8 (depends on 1)

The energy management system of claim 1, wherein the at least one EOM is further configured to dynamically adjust power allocation to part of the one or more aggregated IDERs based on the generated one or more data analysis products.

### Claim 9 (depends on 1)

The energy management system of claim 1, wherein the at least one EOM is configured to utilize at least one energy storage device associated with the at least one VPP for time-shifting energy consumption.

### Claim 10 (depends on 1)

The energy management system of claim 1, wherein the at least one EOM is configured to reconcile energy data corresponding to a part of the aggregated IDERs in compliance with at least one net metering standard.

### Claim 11 (depends on 1)

The energy management system of claim 1, comprising at least one trading engine configured to manage one or more of a creation, a validation, and a trading of energy-backed tokens corresponding to energy assets associated with the at least one VPP.

### Claim 12 (depends on 1)

The energy management system of claim 1, comprising at least one reporting engine configured to generate one or more reports based on energy-allied activities associated to the at least one Virtual Power Plant (VPP).

### Claim 13

A method for energy orchestration in a data centre environment, comprising:
interfacing, via at least one virtualization platform, with a plurality of server components, wherein the individual ones of the interfaced server components are itemized into one or more integrated distributed energy resources (IDERs);
aggregating, by at least one energy orchestration module (EOM), the one or more IDERs into at least one virtual power plant (VPP);
fetching telemetry data associated with the individual ones of the plurality of server components via the at least one EOM;
fetching workload data corresponding to individual ones of the aggregated IDERs from the at least one virtualization platform via the at least one EOM;
analysing one or more of the fetched telemetry data and the fetched workload data to generate insights into energy utilization; and
generating one or more data analysis products for optimizing energy allocation within the at least one VPP based at least in part on the analysing of the one or more of the fetched telemetry data and the fetched workload data.

### Claim 14 (depends on 13)

The method of claim 13, further comprising dynamically adjusting, via the at least one EOM, power allocation to part of the one or more aggregated IDERs based on the generated data analysis products.

### Claim 15 (depends on 13)

The method of claim 13, further comprising reconciling energy data corresponding to a part of the aggregated IDERs in compliance with at least one net metering standard.

### Claim 16 (depends on 13)

The method of claim 13, further comprising utilizing at least one energy storage device associated to the at least one VPP for time-shifting energy consumption.

### Claim 17 (depends on 13)

The method of claim 13, further comprising generating one or more reports detailing energy-allied activities and energy optimization metrics for the at least one VPP via a reporting engine.

### Claim 18 (depends on 13)

The method of claim 13, further comprising managing one or more of a creation, a validation, and a trading of energy-backed tokens corresponding to energy assets associated with the at least one VPP via a trading engine.

### Claim 19

One or more computer-readable media collectively storing instructions that, when executed by one or more processors, collectively cause one or more computing devices to, at least:
interface, via at least one virtualization platform, with a plurality of server components, wherein the individual ones of the interfaced server components are itemized into one or more integrated distributed energy resources (IDERs);
aggregate, by at least one energy orchestration module (EOM), the one or more IDERs into at least one virtual power plant (VPP);
fetch telemetry data associated with the individual ones of the plurality of server components via the at least one EOM;
fetch workload data corresponding to individual ones of the aggregated IDERs from the at least one virtualization platform via the at least one EOM;
analyse one or more of the fetched telemetry data and the fetched workload data to generate insights into energy utilization; and
generate one or more data analysis products for optimizing energy allocation within the at least one VPP based at least in part on the analysis of the one or more of the fetched telemetry data and the fetched workload data.

### Claim 20 (depends on 19)

The non-transitory computer-readable medium of claim 19, wherein the instructions further cause the computing device to utilize at least one energy storage device associated with the at least one VPP to time-shift energy consumption.