# US 2026/0088616 A1 · Energy Management System and Method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0088616 A1
- Document ID: US20260088616A1
- Status: Published application
- Kind: A1
- Application number: 19/112,367
- Filed: 2023-08-21
- Published: 2026-03-26
- Earliest claimed: 2022-09-16
- Assignees: Siemens Schweiz AG
- Applicants: Siemens Schweiz AG
- Inventors: Sebastian Thiem; Thomas Schütz; Alexander Heinisch; Hanspeter Schmutz; Martin Stoffel; Diego Cattaneo; Nazanin Azari; Parandaman Cadirvelou; Tim Lukas Kömpf
- Web page: https://patentgrep.com/patent/US20260088616A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 7/34: Parallel operation in networks using both storage and other DC sources, e.g. providing buffering (H02J7/14 takes precedence)
- H02J 7/82: Control of state of charge [SOC]
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/40: Circuit arrangements adaptive to forecasted demand
- H02J 2103/50: Circuit arrangements adaptive to forecasted power generation
- H02J 2105/12: supplying households or buildings
- H02J 2105/42: Home appliances
- H02J 2105/53: for partial power limitation, e.g. entering degraded or current limitation modes
- H02J 2105/54: according to a non-electrical condition, e.g. temperature
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

Various embodiments of the teachings herein include an energy management system for a building having power consumption devices, power generation devices, and power storage devices. An example includes: a monitoring unit to acquire information about power generated by the power generation devices, about power consumed by the power consumption devices, and about a respective state of charge of the power storage devices; a management unit to derive information about a flexibility of the power demand of the power consumption devices deployed in the building based on the information acquired by the monitoring unit; and an optimization unit to optimize the power allocation of the power produced by the power generation devices to the power consumption devices and/or to the power storage devices based at least in part on the derived flexibility information of the power demand.

## Claims

### Claim 1

An energy management system for a building having power consumption devices, power generation devices, and power storage devices, said system, comprising:
a monitoring unit to acquire information about power generated by the power generation devices, about power consumed by the power consumption devices, and about a respective state of charge of the power storage devices;
a management unit to derive information about a flexibility of the power demand of the power consumption devices deployed in the building based on the information acquired by the monitoring unit; and
an optimization unit to optimize the power allocation of the power produced by the power generation devices to the power consumption devices and/or to the power storage devices based at least in part on the derived flexibility information of the power demand.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the optimization unit sends request signals based on the optimized power allocation to the management unit.

### Claim 3 (depends on 2)

The system according to claim 2, wherein the management unit comprises a load controlling subunit to release an actuation signal based on a received request signal to a set of actuators deployed at the building.

### Claim 4 (depends on 1)

The system according to claim 1, wherein the management unit implement a default operation mode defined by a set of predetermined values of power consumption and power generation of the building.

### Claim 5 (depends on 1)

The system according to claim 1, wherein the management unit set a minimum waiting time, during which the optimization unit does not send request signals and the energy management system runs under a default operation mode.

### Claim 6 (depends on 1)

The system according to claim 1, wherein the management unit sets a maximum flexibility use time for the optimization unit to operate without interruption.

### Claim 7 (depends on 6)

The system according to claim 6, wherein the management unit switches to a default operation mode, when the maximum flexibility use time of operation of the optimization unit has expired.

### Claim 8 (depends on 1)

The system according to claim 1, wherein the optimization unit implements an energy data model of the building and an optimization algorithm, wherein the data model uses forecasts of the power generation and forecasts of the power demand of the building as well as the acquired data as input.

### Claim 9 (depends on 8)

The system according to claim 8, wherein the optimization algorithm uses as input information at least a weather forecast and/or information about the power supplied by a power supply grid providing electrical energy to the building.

### Claim 10 (depends on 8)

The system according to claim 8, wherein the optimization unit comprises a database unit to store a base load time series of the building, and wherein the optimization algorithm retrieves the base load time series to use it as input.

### Claim 11 (depends on 1)

The system according to claim 1, wherein the management unit and/or the optimization unit are implemented in a server or as part of a cloud platform.

### Claim 12 (depends on 1)

The system according to claim 1 wherein the optimization unit requests the derived information about the flexibility of the power demand no more often than every 10 seconds.

### Claim 13 (depends on 1)

The system according to claim 1, wherein the flexibility of the power demand is communicated to the optimization unit in an aggregated way, and wherein the optimization unit models the flexibility of the power demand as a virtual battery.

### Claim 14

A energy management method for a building:
acquiring information about the power generated by power generation devices in the building, the power consumed by power consumption devices in the building, and a respective state of charge of power storage devices in the building;
deriving information about a flexibility of a power demand of the power consumption devices deployed in the building based on the acquired information; and
optimizing a power allocation of the power produced by the power generation devices to the power consumption devices and/or to the power storage devices depending on the derived flexibility information of the power demand.

### Claim at position 15

15-16. (canceled)
