# US 2026/0087099 A1 · Artificial intelligence system for oversampling input data and method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0087099 A1
- Document ID: US20260087099A1
- Status: Published application
- Kind: A1
- Application number: 19/408,952
- Filed: 2025-12-04
- Published: 2026-03-26
- Earliest claimed: 2024-09-13
- Assignees: LG Management Development Institute Co., Ltd.
- Applicants: LG Management Development Institute Co., Ltd.
- Inventors: Chang Young PARK; Jae Wan LEE; Hong Jun YANG; Se Hui HAN
- Web page: https://patentgrep.com/patent/US20260087099A1

## CPC

- G06F 18/214: Generating training patterns; Bootstrap methods, e.g. bagging or boosting
- G06N 20/00: Machine learning
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

An artificial intelligence system performing operations including: an operation of calculating an importance score for data points of a dataset, an operation of calculating an oversampling rate for each of the data points, an operation of calculating a sample weight based on the oversampling rate for each of the data points, and an operation of oversampling the data points in correspondence to the calculated sample weight.

## Claims

### Claim 1

A system comprising:
at least one processor; and
at least one memory storing instructions or information executed by the at least one processor,
wherein operations performed by the instructions or information executed by the at least one processor include:
an operation of calculating an oversampling rate for each of data points of a dataset;
an operation of calculating a sample weight based on the oversampling rate for the data points; and
an operation of oversampling the data points in correspondence to the calculated sample weight.

### Claim 2 (depends on 1)

The system of claim 1, wherein the dataset includes a plurality of data points each composed of a feature vector and a target value of the feature vector.

### Claim 3 (depends on 1)

The system of claim 1, further comprising an operation of calculating an importance score for the data points, wherein the operation of calculating the importance score includes:
an operation of calculating a change amount of target values of the data points to calculate an importance score; and
an operation of generating oversampling tubular data by selecting some of the data points having a high importance score.

### Claim 4 (depends on 1)

The system of claim 1, wherein the oversampling rate is calculated as a rate of number of times that each feature value of a plurality of features included in the data points is duplicated within the dataset.

### Claim 5 (depends on 1)

The system of claim 1, wherein the sample weight is calculated by multiplying a plurality of oversampling rates of the data points.

### Claim 6 (depends on 1)

The system of claim 1, wherein the data points are replicated as many times as the calculated sample weight and included in a dataset.

### Claim 7

A method, which is a computerized method, comprising:
calculating, through a processor, an oversampling rate for each of data points of a dataset stored in a memory;
calculating, through the processor, a sample weight for each of the data points based on the oversampling rate stored in the memory; and
oversampling, through the processor, the data points in correspondence to the calculated sample weight stored in the memory.

### Claim 8 (depends on 7)

The method of claim 7, wherein the dataset includes a plurality of data points each composed of a feature vector and a target value of the feature vector.

### Claim 9 (depends on 7)

The method of claim 7, further comprising calculating an importance score for the data points, wherein, in the calculating the importance score, a change amount of target values of the data points is calculated to calculate an importance score, and oversampling tubular data is generated by selecting some of the data points having a high importance score.

### Claim 10 (depends on 7)

The method of claim 7, wherein the oversampling rate is calculated as a rate of number of times that each feature value of a plurality of features included in the data points is duplicated within the dataset divided by a total number of the data points.

### Claim 11 (depends on 7)

The method of claim 7, wherein, in the calculating the sample weight, the sample weight is calculated by multiplying a plurality of oversampling rates of the data points and rounding multiplication results.

### Claim 12 (depends on 7)

The method of claim 7, wherein, in the oversampling the data points, the data points are replicated as many times as the calculated sample weight and included in a dataset.

### Claim 13

An application-specific integrated circuit comprising:
a memory storing information and instructions; and
a functional block including at least one processor requesting access to the memory,
wherein the memory stores instructions or information including:
an operation of calculating an oversampling rate for each of data points of a dataset;
an operation of calculating a sample weight based on the oversampling rate for the data points; and
an operation of oversampling the data points in correspondence to the calculated sample weight.

### Claim 14

A method, which is a computerized method, comprising:
calculating, through a processor, an oversampling rate of each of data points of a dataset including positive electrode material property information of a tubular form stored in a memory;
calculating, through the processor, a sample weight based on the oversampling rate stored in the memory for each of the data points; and
oversampling, through the processor, the data points in correspondence to the calculated sample weight stored in the memory,
wherein at least some of the positive electrode material property information of the dataset are oversampled and stored in the memory.

### Claim 15 (depends on 14)

The method of claim 14, wherein the dataset includes a plurality of data points each composed of a positive electrode material property vector and a target value of the positive electrode material property vector, and the dataset includes positive electrode material property information including a positive electrode active material and doping elements.

### Claim 16 (depends on 15)

The method of claim 15, further comprising calculating an importance score for the data points, wherein, in the calculating the importance score, a change amount of target values of the data points is calculated to calculate an importance score, and oversampling tubular data is generated by selecting some of the data points having a high importance score.

### Claim 17 (depends on 15)

The method of claim 15, wherein the oversampling rate is calculated as a rate of number of times that each feature value of the doping elements included in the data points is duplicated within the dataset divided by a total number of the data points.

### Claim 18 (depends on 14)

The method of claim 14, wherein, in the calculating the sample weight, the sample weight is calculated by multiplying a plurality of oversampling rates of the data points and rounding multiplication results.

### Claim 19 (depends on 15)

The method of claim 15, wherein, in the oversampling the data points, the data points are replicated as many times as the calculated sample weight and included in a dataset so that some of the doping elements are oversampled.

### Claim 20 (depends on 14)

The method of claim 14, wherein:
the positive electrode material property information includes aluminum, zirconium, magnesium, titanium, boron, fluorine, tungsten, molybdenum, gallium, nitrogen group, and calcium as doping elements for doping the positive electrode material; and
property information of some of the doping elements is oversampled by calculating an oversampling rate and a sample weight for each of the doping elements.

### Claim 21 (depends on 20)

The method of claim 20, further comprising:
inputting data-augmented positive electrode material property information into an artificial intelligence model executed by a processor for training; and
predicting a doping condition of the positive electrode material using the trained artificial intelligence model executed by the processor,
wherein, in the predicting, the predicted positive electrode material doping condition is derived as at least one of tungsten/zirconium (W/Zr), tungsten/aluminum (W/Al), or tungsten/titanium (W/Ti).

### Claim 22

A computing system comprising:
a user computing device; and
a server computing system performing a task corresponding to instructions or data received from the user computing device,
wherein:
the server computing system includes:
a database storing a dataset for training an artificial intelligence model;
a memory storing instructions and data for training the artificial intelligence model and performing the task; and
at least one processor performing the task according to the instructions or data stored in the memory; and
the at least one processor performs operations of:
receiving an oversampling instruction for the dataset from the user computing device;
calculating an oversampling rate for each of data points of the dataset;
calculating a sample weight based on the oversampling rate for the data points, oversampling the data points in correspondence to the calculated sample weight; and
providing an oversampling result to the user computing device.

### Claim 23 (depends on 22)

The computing system of claim 22, wherein the at least one processor further performs operations of:
inputting the oversampled dataset to the artificial intelligence model executed by the processor for training;
executing a prediction task based on instructions or data received from the user computing device; and
providing a prediction task result to the user computing device for output.

### Claim 24 (depends on 22)

The computing system of claim 22, wherein the dataset includes a plurality of data points each composed of a feature vector and a target value of the feature vector.

### Claim 25 (depends on 22)

The computing system of claim 22, wherein:
the at least one processor further performs an operation of calculating an importance score for the data points; and
the operation of calculating the importance score includes:
an operation of calculating a change amount of target values of the data points to calculate the importance score; and
an operation of generating oversampling tubular data by selecting some of the data points having a high importance score.

### Claim 26 (depends on 22)

The computing system of claim 22, wherein the oversampling rate is calculated as a rate of number of times that each feature value of a plurality of features included in the data points is duplicated within the dataset divided by a total number of the data points.

### Claim 27 (depends on 22)

The computing system of claim 22, wherein the sample weight is calculated by multiplying a plurality of oversampling rates of the data points and rounding multiplication results.

### Claim 28 (depends on 22)

The computing system of claim 22, wherein the data points are replicated as many times as the calculated sample weight and included in a dataset.
