# US 2026/0086545 A1 · Enhanced power grid secondary asset management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0086545 A1
- Document ID: US20260086545A1
- Status: Published application
- Kind: A1
- Application number: 18/894,267
- Filed: 2024-09-24
- Published: 2026-03-26
- Earliest claimed: 2024-09-24
- Assignees: GE Infrastructure Technology LLC
- Applicants: GE Infrastructure Technology LLC
- Inventors: Balakrishna PAMULAPARTHY; Manoj KUMAR; Adriano Oliveira PIRES
- Web page: https://patentgrep.com/patent/US20260086545A1

## CPC

- G05B 23/0221: {Preprocessing measurements, e.g. data collection rate adjustment; Standardization of measurements; Time series or signal analysis, e.g. frequency analysis or wavelets; Trustworthiness of measurements; Indexes therefor; Measurements using easily measured parameters to estimate parameters difficult to measure; Virtual sensor creation; De-noising; Sensor fusion; Unconventional preprocessing inherently present in specific fault detection methods like PCA-based methods}
- G05B 23/0281: {Quantitative, e.g. mathematical distance; Clustering; Neural networks; Statistical analysis}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Devices, systems, and methods for managing intelligent electronic devices (IEDs) in a power system includes a method including sending, by IEDs in a power system, secondary asset management data of the IEDs to a device management system in communication with the IEDs; registering baseline device profiles for the IEDs based on the secondary asset management data; comparing additional secondary asset management data from the IEDs to the baseline device profiles; identifying deviations between the additional secondary asset management data and the baseline device profiles; determining, based on the deviations, a respective risk index for each of the IEDs; determining a respective risk influence factor for each of the IEDs; determining, based on the respective risk index and the respective risk influence factor for each of the IEDs, a final risk index for each of the IEDs; and ranking a fleet of the IEDs.

## Claims

### Claim 1

A method for managing intelligent electronic devices (IEDs) or secondary assets in a power grid or industrial system, which further protect, monitor, and manage primary assets comprising a transformer, a generator, and motor, and which control an associated breaker in case of faults or events, based on measured data sent from associated current and voltage transformers in the grid or industrial system, the method comprising:
sending, by IEDs in a power system, secondary asset management data of the IEDs to at least one device of a device management system or software in communication with the IEDs;
receiving, by the at least one device, the secondary asset management data and additional secondary asset management data from the IEDs to map each secondary asset unique tag (IED) with a corresponding primary asset and an associated breaker, and current and voltage transformer unique tags in a database;
during a baseline period, registering, by the at least one device, baseline device profiles for the IEDs using the secondary asset management data and the additional secondary asset management data;
forming, by the at least one device, baseline IED clusters based on similar statistical data profiles of the IEDs and applications, ages, and manufacturer type of the IEDs;
during a monitoring period, comparing, by the at least one device, latest retrieved secondary asset management data from the IEDs to the baseline device profile of a same IED and a corresponding IED cluster profile of the same IED;
during the monitoring period, identifying, by the at least one device, based on the comparing, deviations between the latest secondary asset management data and at least one of the baseline device profile or the corresponding IED cluster profile;
during the monitoring period, determining, by the at least one device, based on the deviations, a respective risk index for each of the IEDs;
during the monitoring period, determining, by the at least one device, based on the latest retrieved additional secondary asset management data, comprising ambient environmental condition data, primary asset data, breaker data, and current and voltage transformer data, deviating from the corresponding baseline device profiles created using the additional secondary asset management data, a respective risk influence factor for each of the IEDs;
during the monitoring period, determining, by the at least one device, based on the respective risk index and the respective risk influence factor for each of the IEDs, a final risk index for each of the IEDs; and
ranking, by the at least one device, a fleet of the IEDs based on the final risk index for each of the IEDs.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
the secondary asset management data comprises condition and performance data of primary assets corresponding to the IEDs, control operating times of the IEDs, IED installation times, cybersecurity details of the IEDs, current transformer and potential transformer health data, breaker health data, real-time clock accuracy data, computer performance data, temperature and humidity data, and communication latency data, and
determining the respective risk influence factor is based on a deviation of the condition and performance data of the primary assets from a respective baseline of the baseline device profiles, a deviation of the breaker health data from a respective baseline of the device profiles, a deviation of the current transformer and potential transformer data from a respective baseline of the baseline device profiles, and a deviation of the temperature and humidity data from a respective baseline of the baseline device profiles.

### Claim 3 (depends on 1)

The method of claim 1, wherein at least one of the deviations is from a baseline set for a respective IED using only respective secondary asset management data of the respective IED.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
generating the baseline IED clusters based on characteristics comprising a baseline profile of the secondary asset management data.

### Claim 5 (depends on 4)

The method of claim 4, wherein at least one of the deviations is from a baseline set for all IEDs in a cluster of IEDs that comprises the IED for which the risk index is being determined.

### Claim 6 (depends on 4)

The method of claim 4, wherein at least one of the deviations is from a baseline set for a different IED in a same cluster as the IED for which the risk index is being determined.

### Claim 7 (depends on 1)

The method of claim 1, wherein a respective baseline profile comprises respective baselines for each type of the secondary asset management data.

### Claim 8 (depends on 7)

The method of claim 7, wherein determining the risk index comprises:
determining a respective deviation for each type of the secondary asset management data;
determining a respective risk index for each type of the secondary asset management data based on the respective deviation; and
identifying a maximum risk index from the risk index for each type of the secondary asset management data.

### Claim 9 (depends on 7)

The method of claim 7, wherein determining the risk influence factor comprises:
determining a first deviation of condition and performance data of primary assets corresponding to the IEDs from a first respective baseline of the baseline device profiles;
determining a second deviation of breaker health data from a second respective baseline of the device profiles;
determining a third deviation of current transformer and potential transformer data from a third respective baseline of the baseline device profiles;
determining a fourth deviation of temperature and humidity data from a fourth respective baseline of the baseline device profiles
determining a respective risk influence factor based on each of the first deviation, the second deviation, the third deviation, and the fourth deviation; and
identifying a maximum risk influence factor from the respective risk influence factors.

### Claim 10 (depends on 1)

The method of claim 1, wherein at least one of the deviations is based on a magnitude of a respective type of the additional secondary asset management data during a time period greater than an instant.

### Claim 11 (depends on 1)

The method of claim 1, wherein at least one of the deviations is based on a rate of change of a respective type of the additional secondary asset management data.

### Claim 12 (depends on 1)

The method of claim 1, wherein the final risk index is a respective risk index multiplied by a respective risk influence factor.

### Claim 13

A non-transitory computer-readable medium comprising instructions that when executed by processing circuitry of a power system cause the processing circuitry to:
send, by IEDs in a power system, secondary asset management data of the IEDs to at least one device of a device management system or software in communication with the IEDs;
receive, by the at least one device, the secondary asset management data and additional secondary asset management data from the IEDs to map each secondary asset unique tag (IED) with a corresponding primary asset and an associated breaker, and current and voltage transformer unique tags in a database;
during a baseline period, register, by the at least one device, baseline device profiles for the IEDs using the secondary asset management data and the additional secondary asset management data;
form, by the at least one device, baseline IED clusters based on similar statistical data profiles of the IEDs and applications, ages, and manufacturer type of the IEDs;
during a monitoring period, compare, by the at least one device, latest retrieved secondary asset management data from the IEDs to the baseline device profile of a same IED and a corresponding IED cluster profile of the same IED;
during the monitoring period, identify, by the at least one device, based on the comparing, deviations between the latest secondary asset management data and at least one of the baseline device profile or the corresponding IED cluster profile;
during the monitoring period, determine, by the at least one device, based on the deviations, a respective risk index for each of the IEDs;
during the monitoring period, determine, by the at least one device, based on the latest retrieved additional secondary asset management data, comprising ambient environmental condition data, primary asset data, breaker data, and current and voltage transformer data, deviating from the corresponding baseline device profiles created using the additional secondary asset management data, a respective risk influence factor for each of the IEDs;
during the monitoring period, determine, by the at least one device, based on the respective risk index and the respective risk influence factor for each of the IEDs, a final risk index for each of the IEDs; and
rank, by the at least one device, a fleet of the IEDs based on the final risk index for each of the IEDs.

### Claim 14 (depends on 13)

The non-transitory computer-readable medium of claim 13, wherein:
the secondary asset management data comprises condition and performance data of primary assets corresponding to the IEDs, control operating times of the IEDs, IED installation times, cybersecurity details of the IEDs, current transformer and potential transformer health data, breaker health data, real-time clock accuracy data, computer performance data, temperature and humidity data, and communication latency data, and
determining the respective risk influence factor is based on a deviation of the condition and performance data of the primary assets from a respective baseline of the baseline device profiles, a deviation of the breaker health data from a respective baseline of the device profiles, a deviation of the current transformer and potential transformer data from a respective baseline of the baseline device profiles, and a deviation of the temperature and humidity data from a respective baseline of the baseline device profiles.

### Claim 15 (depends on 13)

The non-transitory computer-readable medium of claim 13, wherein at least one of the deviations is from a baseline set for a respective IED using only respective secondary asset management data of the respective IED.

### Claim 16 (depends on 13)

The non-transitory computer-readable medium of claim 13, wherein execution of the instructions further causes the processing circuitry to:
generate the baseline IED clusters based on characteristics comprising a baseline profile of the secondary asset management data.

### Claim 17 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein at least one of the deviations is from a baseline set for all IEDs in a cluster of IEDs that comprises the IED for which the risk index is being determined.

### Claim 18 (depends on 16)

The non-transitory computer-readable medium of claim 16, wherein at least one of the deviations is from a baseline set for a different IED in a same cluster as the IED for which the risk index is being determined.

### Claim 19

A system for managing intelligent electronic devices (IEDs) in a power system, the system comprising memory coupled to at least one processor, wherein the at least one processor is configured to:
send, by IEDs in a power system, secondary asset management data of the IEDs to at least one device of a device management system or software in communication with the IEDs;
receive, by the at least one device, the secondary asset management data and additional secondary asset management data from the IEDs to map each secondary asset unique tag (IED) with a corresponding primary asset and an associated breaker, and current and voltage transformer unique tags in a database;
during a baseline period, register, by the at least one device, baseline device profiles for the IEDs using the secondary asset management data and the additional secondary asset management data;
form, by the at least one device, baseline IED clusters based on similar statistical data profiles of the IEDs and applications, ages, and manufacturer type of the IEDs;
during a monitoring period, compare, by the at least one device, latest retrieved secondary asset management data from the IEDs to the baseline device profile of a same IED and a corresponding IED cluster profile of the same IED;
during the monitoring period, identify, by the at least one device, based on the comparing, deviations between the latest secondary asset management data and at least one of the baseline device profile or the corresponding IED cluster profile;
during the monitoring period, determine, by the at least one device, based on the deviations, a respective risk index for each of the IEDs;
during the monitoring period, determine, by the at least one device, based on the latest retrieved additional secondary asset management data, comprising ambient environmental condition data, primary asset data, breaker data, and current and voltage transformer data, deviating from the corresponding baseline device profiles created using the additional secondary asset management data, a respective risk influence factor for each of the IEDs;
during the monitoring period, determine, by the at least one processor, based on the respective risk index and the respective risk influence factor for each of the IEDs, a final risk index for each of the IEDs; and
rank, by the at least one processor, a fleet of the IEDs based on the final risk index for each of the IEDs.

### Claim 20 (depends on 19)

The system of claim 19, wherein:
the secondary asset management data comprises condition and performance data of primary assets corresponding to the IEDs, control operating times of the IEDs, IED installation times, cybersecurity details of the IEDs, current transformer and potential transformer health data, breaker health data, real-time clock accuracy data, computer performance data, temperature and humidity data, and communication latency data, and
determining the respective risk influence factor is based on a deviation of the condition and performance data of the primary assets from a respective baseline of the baseline device profiles, a deviation of the breaker health data from a respective baseline of the device profiles, a deviation of the current transformer and potential transformer data from a respective baseline of the baseline device profiles, and a deviation of the temperature and humidity data from a respective baseline of the baseline device profiles.