# US 2026/0086145 A1 · Chip, system, and method for boundary testing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0086145 A1
- Document ID: US20260086145A1
- Status: Published application
- Kind: A1
- Application number: 19/317,312
- Filed: 2025-09-03
- Published: 2026-03-26
- Earliest claimed: 2024-09-20
- Assignees: Realtek Semiconductor Corp.
- Applicants: Realtek Semiconductor Corp.
- Inventors: Szu-Yang Chang
- Web page: https://patentgrep.com/patent/US20260086145A1

## CPC

- G01R 31/2884: {using dedicated test connectors, test elements or test circuits on the IC under test (G01R31/2855 takes precedence)}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)

## Abstract

A chip with boundary testing includes two circuit groups. During a first shift-in period, a first circuit group receives a first test input, and a first boundary circuit of the first circuit group has first boundary data after receiving the first test input. During a first calculation period after the first shift-in period, a second boundary circuit of a second circuit group captures the first boundary data, and the second circuit group performs circuit calculation according to the first boundary data to generate a first test output. During a second shift-in period after the first calculation period, a second main circuit of the second circuit group outputs the first test output.

## Claims

### Claim 1

A chip with boundary testing, comprising:
a first circuit group, comprising:
a first main circuit; and
a first boundary circuit, coupled to the first main circuit; and
a second circuit group, comprising:
a second main circuit; and
a second boundary circuit, coupled to the second main circuit and the first boundary circuit;
wherein during a first shift-in period, the first circuit group receives a first test input, and the first boundary circuit has first boundary data after the first circuit group receives the first test input;
wherein during a first calculation period after the first shift-in period, the second boundary circuit captures the first boundary data, and the second circuit group performs a circuit calculation according to the first boundary data to generate a first test output; and
wherein during a second shift-in period after the first calculation period, the second main circuit outputs the first test output.

### Claim 2 (depends on 1)

The chip according to claim 1, further comprising:
at least one test pin, configured to connect to an external test machine, wherein the first circuit group receives the first test input from the test machine via at least one of the at least one test pin, the second main circuit outputs the first test output to the test machine via remaining of the at least one test pin, and the test machine compares the first test output with a first expected result to generate a first comparison result.

### Claim 3 (depends on 1)

The chip according to claim 1, wherein the second circuit group is further configured to, during the second shift-in period, receive a second test input, so that the second boundary circuit has second boundary data.

### Claim 4 (depends on 3)

The chip according to claim 3, wherein the first boundary circuit is configured to capture the second boundary data during a second calculation period after the second shift-in period, the first circuit group is further configured to perform a circuit calculation according to the second boundary data to generate a second test output during the second calculation period, and the first main circuit is further configured to output the second test output during the first shift-in period.

### Claim 5 (depends on 4)

The chip according to claim 4, further comprising:
at least one test pin, configured to connect to an external test machine, wherein the second test input is from the test machine, the first main circuit outputs the second test output to the test machine, and the test machine compares the second test output with a second expected result to generate a second comparison result.

### Claim 6 (depends on 4)

The chip according to claim 4, wherein during the first shift-in period and the second calculation period, the second circuit group does not operate, and during the first calculation period and the second shift-in period, the first circuit group does not operate.

### Claim 7 (depends on 1)

The chip according to claim 1, further comprising:
a third circuit group, comprising:
a third main circuit; and
a third boundary circuit, coupled to the third main circuit and the second boundary circuit
wherein during the first shift-in period, the third circuit group receives a third test input, and the third boundary circuit has third boundary data after the first circuit group receives the third test input; and
wherein during the first calculation period, the second boundary circuit further captures the third boundary data, and the second circuit group performs the circuit calculation according to the first boundary data and the third boundary data to generate the first test output.

### Claim 8 (depends on 7)

The chip according to claim 7, wherein the first circuit group does not operate during a session when the third circuit group operates during the first shift-in period, the first calculation period, and the second shift-in period after the first calculation period, the second circuit group does not operate during the first shift-in period and a second calculation period after the second shift-in period, and the third circuit group does not operate during a session when the first circuit group operates during the first shift-in period, the first calculation period, and the second shift-in period.

### Claim 9 (depends on 1)

The chip according to claim 1, wherein the second circuit group is further configured to receive a second test input during a pre-shift-in period before the first calculation period.

### Claim 10

A boundary testing system, comprising:
a chip, comprising:
a first circuit group, comprising:
a first main circuit; and
a first boundary circuit, coupled to the first main circuit; and
a second circuit group, comprising:
a second main circuit; and
a second boundary circuit, coupled to the second main circuit and the first boundary circuit; and
a test machine, coupled to the chip;
wherein during a first shift-in period, the test machine outputs a first test input to the first circuit group, so that the first boundary circuit has first boundary data after the first circuit group receives the first test input;
wherein during a first calculation period after the first shift-in period, the second boundary circuit captures the first boundary data from the first boundary circuit, and the second circuit group performs a circuit calculation according to the captured first boundary data to generate a first test output; and
wherein during a second shift-in period after the first calculation period, the second main circuit outputs the first test output to the test machine, and the test machine compares the first test output with a first expected result to generate a first comparison result.

### Claim 11 (depends on 10)

The boundary testing system according to claim 10, wherein during the second shift-in period, the test machine is further configured to output a second test input to the second circuit group, so that after the second circuit group receives the second test input, the second boundary circuit has second boundary data.

### Claim 12 (depends on 11)

The boundary testing system according to claim 11, wherein the first boundary circuit is configured to captures the second boundary data during a second calculation period after the second shift-in period, and the first circuit group is configured to, during the second calculation period, perform a circuit calculation according to the second boundary data to generate a second test output to the test machine, and the test machine is further configured to compare the second test output with a second expected result to generate a second comparison result.

### Claim 13 (depends on 10)

The boundary testing system according to claim 10, wherein the chip further comprises:
a third circuit group, comprising:
a third main circuit; and
a third boundary circuit, coupled to the third main circuit and the second boundary circuit, wherein
wherein during the first shift-in period, the test machine further outputs a third test input to the third circuit group, so that after the third circuit group receives the third test input, the third boundary circuit has third boundary data, and
wherein during the first calculation period, the second boundary circuit further captures the third boundary, data and the second circuit group performs the circuit calculation according to the first boundary data and the third boundary data to generate the first test output.

### Claim 14 (depends on 10)

The boundary testing system according to claim 10, wherein the test machine is further configured to output a second test input to the second circuit group during a pre-shift-in period before the first calculation period.

### Claim 15

A boundary testing method applicable to a chip, comprising:
during a first shift-in period, outputting a first test input to a first circuit group of the chip, so that a first boundary circuit of the first circuit group has first boundary data after receiving the first test input;
during a first calculation period after the first shift-in period, capturing the first boundary data by a second boundary circuit of a second circuit group of the chip, and performing a circuit calculation according to the first boundary data by a second main circuit and the second boundary circuit of the second circuit group to generate a first test output, wherein the second main circuit is coupled to the second boundary circuit; and
during a second shift-in period after the first calculation period, outputting the first test output by the second main circuit, and comparing the first test output with a first expected result to generate a first comparison result.

### Claim 16 (depends on 15)

The boundary testing method according to claim 15, further comprising:
during the second shift-in period, inputting a second test input to the second circuit group, so that the second boundary circuit has second boundary data.

### Claim 17 (depends on 16)

The boundary testing method according to claim 16, further comprising:
during a second calculation period after the second shift-in period, capturing the second boundary data by the first boundary circuit, and performing circuit calculation according to the second boundary data by a first main circuit and the first boundary circuit of the first circuit group to generate a second test output, wherein the first main circuit is coupled to the first boundary circuit; and
during the first shift-in period, outputting the second test output by the first main circuit, and comparing the second test output with a second expected result to generate a second comparison result.

### Claim 18 (depends on 17)

The boundary testing method according to claim 17, further comprising:
during the first shift-in period and the second calculation period, causing the second circuit group to not operate; and
during the first calculation period and the second shift-in period, causing the first circuit group to not operate.

### Claim 19 (depends on 15)

The boundary testing method according to claim 15, further comprising:
during the first shift-in period, inputting a third test input to a third circuit group of the chip, so that a third boundary circuit of the third circuit group has third boundary data after receiving the third test input; and
during the first calculation period, capturing the third boundary data by the second boundary circuit;
wherein in the step of performing the circuit calculation according to the first boundary data to generate the first test output, the circuit calculation is performed according to the first boundary data and the third boundary data.

### Claim 20 (depends on 19)

The boundary testing method according to claim 19, further comprising:
during the first calculation period and a second shift-in period after the first calculation period, causing the first circuit group and the third circuit group to not operate;
during a session when the first circuit group operates during the first shift-in period and a second calculation period after the second shift-in period, causing the second circuit group and the third circuit group to not operate; and
during a session when the third circuit group operates during the first shift-in period, causing the first circuit group and the second circuit group to not operate.
