# US 2026/0085922 A1 · Determining a thickness of a work item with inhomogeneous resistivity

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0085922 A1
- Document ID: US20260085922A1
- Status: Published application
- Kind: A1
- Application number: 19/331,340
- Filed: 2025-09-17
- Published: 2026-03-26
- Earliest claimed: 2024-09-23
- Applicants: ABB Schweiz AG
- Inventors: Martin Haldin
- Web page: https://patentgrep.com/patent/US20260085922A1

## CPC

- G01B 7/107: {for measuring objects while moving (G01B7/105 takes precedence)}
- B21B 37/16: Control of thickness, width, diameter or other transverse dimensions (B21B37/58 takes precedence)
- B21B 37/165: {responsive mainly to the measured thickness of the product}
- B21B 38/04: for measuring thickness, width, diameter or other transverse dimensions of the product
- G01B 7/06: for measuring thickness {(measuring during the manufacture of coatings C23C14/54)}
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- B21B: ROLLING OF METAL (auxiliary operations used in connection with metal-working operations covered in B21, see B21C; bending by rolling B21D; manufacture of particular objects, e.g. screws, wheels, rings, barrels, balls, by rolling B21H; pressure welding by means of a rolling mill B23K20/04)

## Abstract

A method for determining a thickness of an item comprises controlling a device to apply a magnetic pulse to the item and acquiring a signal reflecting a time dependence of an eddy current decay in the item caused by the magnetic pulse. The method further comprises calculating a first thickness of the item based on a set of samples in the signal and calculating a first resistivity of the item based on a first set of samples. The method additionally comprises calculating a second resistivity of the item based on a second set of samples and determining a compensation factor based on a difference between the second and first resistivities. The method also comprises calculating a thickness of the item based on the first thickness, a relation between the first thickness and the first resistivity, and the compensation factor. An output of the thickness of the item is then provided.

## Claims

### Claim 1

A computer-implemented method for determining a thickness of a work item while being processed in a rolling mill, the method comprising:
controlling a magnetic field generating device to apply a magnetic field pulse to the work item;
acquiring a data signal that reflects an overall time dependence of an eddy current decay in the work item caused by the applied magnetic field pulse, the data signal comprising multiple consecutive data samples;
calculating a first thickness of the work item based on a set of the multiple consecutive data samples in the data signal;
calculating a first resistivity of the work item based on a first set of the multiple consecutive data samples;
calculating a second resistivity of the work item based on a second set of the multiple consecutive data samples in the data signal including data samples subsequent to at least one sample in the first set of the multiple consecutive data samples;
determining a resistivity gradient compensation factor based on a difference between the second resistivity and the first resistivity;
calculating a resistivity gradient compensated thickness of the work item based on the first thickness, a relation between the first thickness and the first resistivity, and the resistivity gradient compensation factor; and
providing an output of the resistivity gradient compensated thickness of the work item.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the second set of data samples reflect a second time dependence of the eddy current decay when the eddy current has penetrated further into the work item compared to in the first set of data samples.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the relation between the first thickness and the first resistivity is a predetermined function based on empirical data.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the second set of data samples are included in the data samples used for calculating the first resistivity.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the first set of data samples reflect a first time dependence of the eddy current decay when the eddy current has penetrated only partly through the work item.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the resistivity gradient compensation factor is dynamically updated during the processing of the work item in the rolling mill.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the output of the resistivity gradient compensated thickness is used to control one or more operational parameters of the rolling mill.

### Claim 8 (depends on 1)

The method according to claim 1, further comprising storing the calculated resistivities, thicknesses, and the resistivity gradient compensation factor in a database for later analysis or quality control purposes.

### Claim 9 (depends on 1)

The method according to claim 1, further comprising:
determining that the resistivity gradient compensated thickness deviates from a predefined acceptable range; and
generating an alert signal indicating the deviation.

### Claim 10 (depends on 1)

The method according to claim 1, further comprising:
calculating further resistivities of the work item based on further sets of data samples in the data signal including data samples subsequent to at least one sample in the first set of data samples; and
storing data of the further resistivities in a non-transitory computer-readable data storage medium.

### Claim 11 (depends on 1)

The method according to claim 1, wherein the first set of the multiple consecutive data samples are samples in the data signal subsequent to distance samples used to calculate a distance between a receiver coil and the work item, and wherein the receiver coil is configured to measure the eddy current decay.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the work item is a metal plate or strip.

### Claim 13

A control unit for determining a thickness of a work item while being processed in a rolling mill, wherein the control unit is configured to:
control a magnetic field generating device to apply a magnetic field pulse to the work item;
acquire a data signal that reflects an overall time dependence of an eddy current decay in the work item caused by the applied magnetic field pulse, the data signal comprising multiple consecutive data samples;
calculate a first thickness of the work item based on a set of the multiple consecutive data samples in the data signal;
calculate a first resistivity of the work item based on a first set of the multiple consecutive data samples;
calculate a second resistivity of the work item based on a second set of the multiple consecutive data samples in the data signal including data samples subsequent to at least one sample in the first set of the multiple consecutive data samples;
determine a resistivity gradient compensation factor based on a difference between the second resistivity and the first resistivity;
calculate a resistivity gradient compensated thickness of the work item based on the first thickness, a relation between the first thickness and the first resistivity, and the resistivity gradient compensation factor; and
provide an output of the resistivity gradient compensated thickness of the work item.

### Claim 14

A system comprising:
a controllable magnetic field generating device;
a receiver device configured to acquire a data signal that reflects a time dependence of an eddy current decay in a work item, wherein the eddy current decay is caused by a magnetic field pulse applied via the controllable magnetic field generating device, and
a control unit configured to:
control the magnetic field generating device to apply the magnetic field pulse to the work item;
acquire, via the receiver device, the data signal, wherein the data signal comprises multiple consecutive data samples;
calculate a first thickness of the work item based on a set of the multiple consecutive data samples in the data signal;
calculate a first resistivity of the work item based on a first set of the multiple consecutive data samples;
calculate a second resistivity of the work item based on a second set of the multiple consecutive data samples in the data signal including data samples subsequent to at least one sample in the first set of the multiple consecutive data samples;
determine a resistivity gradient compensation factor based on a difference between the second resistivity and the first resistivity;
calculate a resistivity gradient compensated thickness of the work item based on the first thickness, a relation between the first thickness and the first resistivity, and the resistivity gradient compensation factor; and
provide an output of the resistivity gradient compensated thickness of the work item.

### Claim 15 (depends on 14)

The system according to claim 14, further comprising:
a set of work rolls configured to process a work item between work rolls to a predetermined work item thickness.

### Claim 16 (depends on 13)

The control unit according to claim 13, wherein the second set of data samples reflect a second time dependence of the eddy current decay when the eddy current has penetrated further into the work item compared to in the first set of data samples.

### Claim 17 (depends on 13)

The control unit according to claim 13, wherein the relation between the first thickness and the first resistivity is a predetermined function based on empirical data.

### Claim 18 (depends on 13)

The control unit according to claim 13, wherein the second set of data samples are included in the data samples used for calculating the first resistivity.

### Claim 19 (depends on 13)

The control unit according to claim 13, wherein the first set of data samples reflect a first time dependence of the eddy current decay when the eddy current has penetrated only partly through the work item.

### Claim 20 (depends on 13)

The control unit according to claim 13, wherein the resistivity gradient compensation factor is dynamically updated during the processing of the work item in the rolling mill.
