# US 2026/0085797 A1 · Methods and systems for city lifeline pipeline burst prevention based on iot large model

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0085797 A1
- Document ID: US20260085797A1
- Status: Published application
- Kind: A1
- Application number: 19/408,327
- Filed: 2025-12-03
- Published: 2026-03-26
- Earliest claimed: 2025-09-12
- Assignees: Chengdu Qinchuan Iot Technology Co., Ltd.
- Applicants: Chengdu Qinchuan Iot Technology Co., Ltd.
- Inventors: Hanshu SHAO; Junyan ZHOU; Siwei ZENG; Rui RU
- Web page: https://patentgrep.com/patent/US20260085797A1

## CPC

- F17D 5/02: Preventing, monitoring, or locating loss
- G01L 13/06: using electric or magnetic pressure-sensitive elements
- G16Y 40/10: Detection; Monitoring
- F17D: PIPE-LINE SYSTEMS; PIPE-LINES (pumps or compressors F04; fluid dynamics F15D; valves or the like F16K; pipes, laying pipes, supports, joints, branches, repairing, work on the entire line, accessories F16L; steam traps or the like F16T; fluid-pressure electric cables H01B9/06)
- G01L: MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE (weighing G01G)
- G16Y: INFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]

## Abstract

The present disclosure relates to a method and system for city lifeline pipeline burst prevention based on an IoT large model. The method includes: obtaining fluid pressure data; determining a pipe burst probability of a pipeline network node based on the fluid pressure data; and determining a target valve and a valve opening degree of the target valve based on the pipe burst probability, and controlling the target valve to the valve opening degree.

## Claims

### Claim 1

A system for city lifeline pipeline burst prevention based on an Internet of Things (IoT) large model, comprising an emergency supervision management platform, wherein the emergency supervision management platform is configured to:
obtain fluid pressure data;
determine a pipe burst probability of a pipeline network node based on the fluid pressure data; and
determine a target valve and a valve opening degree of the target valve based on the pipe burst probability, and control the target valve to the valve opening degree.

### Claim 2 (depends on 1)

The system of claim 1, wherein the emergency supervision management platform is further configured to:
determine a target area based on the fluid pressure data;
determine a target monitoring device and shooting parameters corresponding to the target area based on the target area;
control the target monitoring device to adjust a shooting angle and a focal length based on the shooting parameters to obtain a road surface image of the target area;
determine a road surface water seepage feature based on the road surface image;
determine the pipe burst probability of the pipeline network node in the target area based on the road surface water seepage feature and the fluid pressure data; and
generate a risk avoidance instruction and broadcast the risk avoidance instruction to vehicles in the target area in response to determining that the pipe burst probability exceeds a probability threshold.

### Claim 3 (depends on 2)

The system of claim 2, wherein the emergency supervision management platform is further configured to:
determine a monitoring center and an area radius based on the fluid pressure data and a pressure threshold; and
determine the target area based on the monitoring center and the area radius.

### Claim 4 (depends on 2)

The system of claim 2, wherein the risk avoidance instruction includes a broadcast intensity, and the broadcast intensity is related to a type of the target area and/or a type of the vehicles.

### Claim 5 (depends on 2)

The system of claim 2, wherein the emergency supervision management platform is further configured to:
construct a burst prediction map based on the road surface water seepage feature and the fluid pressure data;
determine a first pipe burst probability of the pipeline network node based on the burst prediction map using a first prediction model, wherein the first prediction model is a machine learning model;
determine a second pipe burst probability of the pipeline network node based on fluid pressure data of a preset historical period using a second prediction model; and
determine the pipe burst probability of the pipeline network node by performing weighted fusion on the first pipe burst probability and the second pipe burst probability.

### Claim 6 (depends on 5)

The system of claim 5, wherein a time length of the preset historical period is related to the road surface water seepage feature and a water seepage threshold.

### Claim 7 (depends on 6)

The system of claim 6, wherein in the weighted fusion, a weight of the second pipe burst probability is related to an area radius.

### Claim 8 (depends on 1)

The system of claim 1, wherein the emergency supervision management platform is further configured to:
in response to determining that the pipe burst probability exceeds a probability threshold, determine supply pressure adjustment parameters based on the pipe burst probability, the supply pressure adjustment parameters including a target water pump, a target supply pressure, and a target water pump speed; and
adjust a water pump speed of the target water pump to the target water pump speed based on the supply pressure adjustment parameters to regulate a supply pressure of a pipeline network including the pipeline network node to the target supply pressure.

### Claim 9 (depends on 8)

The system of claim 8, wherein the supply pressure adjustment parameters are related to at least one of a type of a target area, an area radius, and a traffic flow of the target area.

### Claim 10

A method for city lifeline pipeline burst prevention based on an Internet of Things (IOT) large model, realized by a system for city lifeline pipeline burst prevention based on an IoT large model, the method comprising:
obtaining fluid pressure data;
determining a pipe burst probability of a pipeline network node based on the fluid pressure data; and
determining a target valve and a valve opening degree of the target valve based on the pipe burst probability, and controlling the target valve to the valve opening degree.

### Claim 11 (depends on 10)

The method of claim 10, wherein the determining a pipe burst probability of a pipeline network node based on the fluid pressure data includes:
determining a target area based on the fluid pressure data;
determining a target monitoring device and shooting parameters corresponding to the target area based on the target area;
controlling the target monitoring device to adjust a shooting angle and a focal length based on the shooting parameters to obtain a road surface image of the target area;
determining a road surface water seepage feature based on the road surface image;
determining the pipe burst probability of the pipeline network node in the target area based on the road surface water seepage feature and the fluid pressure data; and
generating a risk avoidance instruction and broadcasting the risk avoidance instruction to vehicles in the target area in response to determining that the pipe burst probability exceeds a probability threshold.

### Claim 12 (depends on 11)

The method of claim 11, wherein the determining a target area based on the fluid pressure data includes:
determining a monitoring center and an area radius based on the fluid pressure data and a pressure threshold; and
determining the target area based on the monitoring center and the area radius.

### Claim 13 (depends on 11)

The method of claim 11, wherein the risk avoidance instruction includes a broadcast intensity, and the broadcast intensity is related to a type of the target area and/or a type of the vehicles.

### Claim 14 (depends on 11)

The method of claim 11, wherein the determining the pipe burst probability of the pipeline network node in the target area based on the road surface water seepage feature and the fluid pressure data includes:
constructing a burst prediction map based on the road surface water seepage feature and the fluid pressure data;
determining a first pipe burst probability of the pipeline network node based on the burst prediction map using a first prediction model, wherein the first prediction model is a machine learning model;
determining a second pipe burst probability of the pipeline network node based on fluid pressure data of a preset historical period using a second prediction model; and
determining the pipe burst probability of the pipeline network node by performing weighted fusion on the first pipe burst probability and the second pipe burst probability.

### Claim 15 (depends on 14)

The method of claim 14, wherein a time length of the preset historical period is related to the road surface water seepage feature and a water seepage threshold.

### Claim 16 (depends on 15)

The method of claim 15, wherein in the weighted fusion, a weight of the second pipe burst probability is related to an area radius.

### Claim 17 (depends on 10)

The method of claim 10, further comprising:
in response to determining that the pipe burst probability exceeds a probability threshold, determining supply pressure adjustment parameters based on the pipe burst probability, the supply pressure adjustment parameters including a target water pump, a target supply pressure, and a target water pump speed; and
adjusting a water pump speed of the target water pump to the target water pump speed based on the supply pressure adjustment parameters to regulate a supply pressure of a pipeline network including the pipeline network node to the target supply pressure.

### Claim 18 (depends on 17)

The method of claim 17, wherein the supply pressure adjustment parameters are related to at least one of a type of a target area, an area radius, and a traffic flow of the target area.

### Claim 19 (depends on 10)

A non-transitory computer-readable storage medium, wherein the storage medium stores computer instructions, and when the computer instructions are executed by at least one processor, the method of claim 10 is implemented.