# US 2026/0085659 A1 · Arrangement and methods for installation, construction, replacement of parts, or maintenance of a wind turbine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0085659 A1
- Document ID: US20260085659A1
- Status: Published application
- Kind: A1
- Application number: 19/113,577
- Filed: 2023-09-12
- Published: 2026-03-26
- Earliest claimed: 2022-09-22
- Assignees: Wind Spider AS
- Applicants: Wind Spider AS
- Inventors: Petter VABØ
- Web page: https://patentgrep.com/patent/US20260085659A1

## CPC

- F03D 13/10: Assembly of wind motors; Arrangements for erecting wind motors
- F03D 13/104: {Rotor installation, e.g. installation of blades}
- F03D 13/139: {Assembling or erecting wind motors by using lifting means}
- F03D 80/50: Maintenance or repair
- F05B 2230/61: using auxiliary equipment for lifting or holding
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

An arrangement is for use in any of installing or replacing a part, maintaining, and constructing a wind turbine, the arrangement having a longitudinal structure at least partially supported on a wind turbine tower, a guide track connected to the longitudinal structure and a dolly arranged to follow the guide track along the longitudinal structure.

## Claims

### Claim 1

An arrangement for use in a process of installation, construction, replacement or handling of parts, or maintenance of a wind turbine, the arrangement comprising:
a crane tower supported on and surrounding a wind turbine tower, the crane tower comprising: ;
a longitudinal guide track on the outside of the crane tower, and supported on the crane tower, as part of the crane tower and
a dolly arranged to follow the guide track along the wind turbine tower.

### Claim 2 (depends on 1)

The arrangement according to claim 1, further comprising an elevation means for elevating the dolly along the crane tower.

### Claim 3 (depends on 2)

The arrangement according to claim 2, wherein the elevation means comprises at least one winch and at least one wire.

### Claim 4 (depends on 3)

The arrangement according to claim 3, wherein the at least one winch is located on the crane tower.

### Claim 5 (depends on 3)

The arrangement according to claim 3, wherein the elevation means comprises a crane wire and at least one crane.

### Claim 6 (depends on 1)

The arrangement according to claim 1, wherein the dolly comprises a blade holding means for holding a wind turbine blade.

### Claim 7 (depends on 6)

The arrangement according to claim 6, wherein the blade holding means is arranged to move between a first position and a second position, wherein the blade holding means in the first position is configured to hold the wind turbine blade in a substantially horizontal orientation and the blade holding means in the second position is configured to hold the wind turbine blade in a substantially vertical orientation.

### Claim 8 (depends on 6)

The arrangement according to claim 6, wherein the dolly comprises tilt means for tilting the blade holding means about a horizontal axis, wherein a mounting portion of the wind turbine blade is moved closer or further away from the wind turbine tower.

### Claim 9 (depends on 1)

The arrangement according to claim 1, further comprising a lifting and handling device on the dolly.

### Claim 10 (depends on 9)

The arrangement according to claim 9, wherein the lifting and handling device is a crane having at least one crane arm which is arranged to extend from the dolly in an elevated position to a lifting point of the crane above a nacelle on an upper end of the wind turbine tower.

### Claim 11 (depends on 1)

The arrangement according to claim 1, wherein dolly is operable in one configuration in which the dolly is connected to the crane tower to follow the guide track longitudinally along a front of the wind turbine tower, and in another configuration in which the dolly is connected to the crane tower to follow the guide track longitudinally along a side of the crane tower.

### Claim 12 (depends on 11)

The arrangement according to claim 11, which further comprises a platform configured to be supported on the wind turbine tower, and the crane tower is rotatably coupled to the platform for rotating the crane tower with the dolly connected thereto about the longitudinal axis with respect to the platform and thereby moving the dolly between the one configuration and the other configuration.

### Claim 13 (depends on 12)

The arrangement as claimed in claim 12, wherein rotation between the one configuration and the other configuration is 90 degrees.

### Claim 14

(canceled)

### Claim 15 (depends on 1)

The arrangement according to claim 1, wherein a crane is supported on top of the crane tower.

### Claim 16 (depends on 1)

A method of elevating at least one wind turbine blade, the method comprising:
providing the arrangement according to claim 1;
elevating a wind turbine blade along the wind turbine tower by use of the dolly; and
rotating the wind turbine blade from the horizontal position to a vertical position during elevation of the wind turbine blade.

### Claim 17 (depends on 1)

A method of elevating a nacelle for mounting to a wind turbine tower, the method comprising:
providing the arrangement according to claim 1,
elevating a nacelle by use of crane wires suspended from a crane; and
supporting the nacelle close to the wind turbine tower by means of the dolly.

### Claim 18 (depends on 1)

A method of elevating a wind turbine tower section for mounting to a partially constructed wind turbine tower, the method comprising:
providing the arrangement according to claim 1,
elevating a wind turbine tower section by use of crane wires suspended from a crane; and
supporting the wind turbine tower section close to the wind turbine tower by means of the dolly.

### Claim 19 (depends on 9)

A method of replacing a part of a nacelle on a wind turbine tower, the method comprising:
providing the arrangement according to claim 9;
elevating a part on the dolly; and
using a crane on the dolly to lift the part off the dolly, reach across a region between the dolly and the nacelle, and lower the part onto nacelle.

### Claim 20 (depends on 19)

The method according to claim 19, further including using the crane on the dolly to reach above the nacelle and remove the part.

### Claim 21 (depends on 19)

The method according to claim 19, wherein the part is a generator part.

### Claim 22 (depends on 10)

A method of replacing a part of a nacelle on a wind turbine tower, the method comprising:
providing the arrangement according to claim 10;
elevating a part on the dolly; and
using a crane on the dolly to lift the part off the dolly, reach across a region between the dolly and the nacelle, and lower the part onto nacelle.