# US 2026/0085597 A1 · Sleeve for multi-stage wellbore stimulation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0085597 A1
- Document ID: US20260085597A1
- Status: Published application
- Kind: A1
- Application number: 18/894,528
- Filed: 2024-09-24
- Published: 2026-03-26
- Earliest claimed: 2024-09-24
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Ibrahim El Mallawany; Ahmed Saber Mohamed
- Web page: https://patentgrep.com/patent/US20260085597A1

## CPC

- E21B 43/26: by forming crevices or fractures
- E21B 33/1208: {characterised by the construction of the sealing or packing means (E21B33/1277 takes precedence)}
- E21B 34/063: {Valve or closure with destructible element, e.g. frangible disc (E21B34/103 takes precedence)}
- E21B 34/142: {unsupported or free-falling elements, e.g. balls, plugs, darts or pistons}
- E21B 43/08: Screens or liners {(expandable screens or liners E21B43/108)}
- E21B 43/12: Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00)
- E21B 2200/06: Sleeve valves
- E21B 2200/08: Down-hole devices using materials which decompose under well-bore conditions
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

An assembly to be positioned in a wellbore formed in a subsurface formation, that comprises a tubular housing having a bore therethrough; and a fracking sleeve comprising, a closing fracking baffle; wherein the fracking sleeve is to axially move from the closed position to an open position to open the at least one stimulation port to communicate a flow of the bore fluid out to the subsurface formation; wherein the fracking sleeve is to move from the open position to the closed position in response to the closing fracking baffle receiving an object received therein; and a production screen sleeve positioned above the fracking sleeve and that comprises a production baffle configured to move from a closed position to an open position upon receipt of a second object before being received by the closing fracking baffle; and a production screen through which production fluid is to be received.

## Claims

### Claim 1

An assembly for incorporation into a completion string and to be positioned in a wellbore formed in a subsurface formation, the assembly comprising:
a tubular housing having a bore therethrough and at least one stimulation port therein to communicate bore fluid from the bore to outside the tubular housing; and
a fracking sleeve axially movable in the tubular housing, the fracking sleeve comprising,
a closing fracking baffle;
wherein the fracking sleeve is initially in a closed position, wherein the fracking sleeve is to axially move from the closed position to an open position to open the at least one stimulation port to communicate a flow of the bore fluid out to the subsurface formation;
wherein the fracking sleeve is to axially move from the open position to the closed position in response to the closing fracking baffle receiving an object received therein; and
a production screen sleeve positioned above the fracking sleeve and axially movable in the tubular housing, wherein the production screen sleeve comprises,
a production baffle configured to move the production screen sleeve from a closed position to an open position upon receipt of a second object before being received by the closing fracking baffle; and
a production screen through which production fluid from the subsurface formation is to be received.

### Claim 2 (depends on 1)

The assembly of claim 1,
wherein the fracking sleeve comprises an opening fracking baffle, wherein the opening fracking baffle is a single entry baffle, and
wherein the fracking sleeve is to axially move from the closed position to the open position to open the at least one stimulation port to communicate the flow of the bore fluid out to the subsurface formation, in response to the opening fracking baffle receiving an initial object therein.

### Claim 3 (depends on 1)

The assembly of claim 1,
wherein the fracking sleeve is to axially move from the closed position to the open position to open the at least one stimulation port to communicate the flow of the bore fluid out to the subsurface formation, in response to a pressure build up in the bore fluid of the fracking sleeve.

### Claim 4 (depends on 1)

The assembly of claim 1, wherein the production screen sleeve comprises a delay mechanism to initially inhibit flow of the bore fluid from the bore through the production screen sleeve back to the production screen such that the delay mechanism is configured to open to enable the flow of the fluid back to the production screen after a delay.

### Claim 5 (depends on 4)

The assembly of claim 4, wherein the delay mechanism comprises at least one of,
a piston that is to move to open a flow path to the production screen based on a pressure of the bore fluid,
a dissolvable plug that is to dissolve over time based on exposure to the bore fluid,
a pumpable dissolvable plug, and
a burst disk.

### Claim 6 (depends on 2)

The assembly of claim 2, wherein the objects comprise dissolvable objects that would provide pressure isolation when landing on their respective baffle but self disintegrate over time to provide unobstructed production flow.

### Claim 7 (depends on 1)

The assembly of claim 1, wherein the sleeves have a shifting profile to allow contingency shifting using a shifting tool.

### Claim 8 (depends on 1)

The assembly of claim 1 where the production sleeve chokes the flow enough to allow the object to continue downhole and build pressure to close the frac sleeve below but at the same time allows enough flow to pump down the next object to open the frac sleeve above.

### Claim 9

A method comprising:
opening a fracking sleeve that is part of an assembly having a bore and that is positioned in a wellbore formed in a subsurface formation;
performing fracking of the subsurface formation using a bore fluid that is flowing through the bore and out into the subsurface formation via the fracking sleeve that is opened; and
after performing the fracking and in response to dropping an object from a surface of the wellbore and down through the bore,
opening a production screen sleeve of the assembly that is positioned above the fracking sleeve, wherein the production screen sleeve comprises a production screen, wherein the production screen sleeve comprises a production baffle configured to move the production sleeve from a closed position to an open position upon receipt of a second object; and
closing the fracking sleeve.

### Claim 10 (depends on 9)

The method of claim 9,
wherein the fracking sleeve comprises an opening fracking baffle, wherein the opening fracking baffle is a single entry baffle, and
wherein opening the fracking sleeve comprises axially moving the fracking sleeve from the closed position to the open position to open at least one stimulation port to communicate the flow of the bore fluid out to the subsurface formation, in response to the opening fracking baffle receiving an initial object therein.

### Claim 11 (depends on 9)

The method of claim 9,
wherein opening the fracking sleeve comprises axially moving fracking sleeve from the closed position to the open position to open at least one stimulation port to communicate the flow of the bore fluid out to the subsurface formation, in response to a pressure build up in the bore fluid of the fracking sleeve.

### Claim 12 (depends on 9)

The method of claim 9, wherein the object comprises a dissolvable object that would provide pressure isolation when landing their respective baffle but self disintegrate over time to provide unobstructed production flow.

### Claim 13 (depends on 9)

The method of claim 9, wherein the fracking sleeve and the production screen sleeve have a shifting profile to allow contingency shifting using a shifting tool.

### Claim 14 (depends on 9)

The method of claim 9, wherein the production screen sleeve comprises a delay mechanism that is used to delay the opening of the production screen until the fracking sleeve is closed.

### Claim 15 (depends on 9)

The method of claim 9, wherein the delay mechanism comprises at least one of,
a piston that is to move to open a flow path to the production screen based on a pressure of the bore fluid,
a dissolvable plug that is to dissolve over time based on exposure to the bore fluid,
a pumpable dissolvable plug, and
a burst disk.

### Claim 16

A system for incorporation into a completion string and to be positioned in a wellbore formed in a subsurface formation, the system comprising:
a tubular housing having a bore therethrough and at least one stimulation port therein to communicate bore fluid from the bore to outside the tubular housing; and
a fracking sleeve axially movable in the tubular housing, the fracking sleeve comprising,
a closing fracking baffle; and
an opening fracking baffle;
wherein the fracking sleeve is to axially move from being closed to being open to open the at least one stimulation port to communicate a flow of the bore fluid out to the subsurface formation, in response to the closing fracking baffle receiving a first object, via the bore and dropped from a surface of the wellbore;
wherein, after fracking of the subsurface formation using bore fluid flowing through the bore and through the fracking sleeve and out into the subsurface formation, the fracking sleeve is to axially move from being open to being closed in response to the opening fracking baffle receiving a second object, via the bore and dropped from the surface of the wellbore received therein; and
a production screen sleeve positioned above the fracking sleeve and axially movable in the tubular housing, wherein the production screen sleeve comprises,
a production baffle configured to move the production screen sleeve from a closed position to an open position upon receipt of the second object before being received by the production baffle; and
a production screen through which production fluid from the subsurface formation is to be received.

### Claim 17 (depends on 16)

The system of claim 16, wherein the production screen sleeve comprises a delay mechanism to initially inhibit flow of the bore fluid from the bore through the production screen sleeve back to the production screen such that the delay mechanism is configured to open to enable the flow of the fluid back to the production screen after a delay.

### Claim 18 (depends on 17)

The system of claim 17, wherein the delay mechanism comprises at least one of,
a piston that is to move to open a flow path to the production screen based on a pressure of the bore fluid,
a dissolvable plug that is to dissolve over time based on exposure to the bore fluid,
a pumpable dissolvable plug, and
a burst disk.

### Claim 19 (depends on 16)

The system of claim 16, wherein the objects comprises a dissolvable object that would provide pressure isolation when landing their respective baffle but self disintegrate over time to provide unobstructed production flow.

### Claim 20 (depends on 16)

The system of claim 16, wherein the sleeves have a shifting profile to allow contingency shifting using a shifting tool.
