# US 2026/0085589 A1 · Advancing a bottom hole assembly into a wellbore

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0085589 A1
- Document ID: US20260085589A1
- Status: Published application
- Kind: A1
- Application number: 19/321,514
- Filed: 2025-09-08
- Published: 2026-03-26
- Earliest claimed: 2024-09-23
- Applicants: Thru Tubing Solutions, Inc.
- Inventors: Bradley J. MILLER; Roger L. SCHULTZ
- Web page: https://patentgrep.com/patent/US20260085589A1

## CPC

- E21B 23/08: Introducing or running tools by fluid pressure, e.g. through-the-flow-line tool systems
- E21B 28/00: Vibration generating arrangements for boreholes or wells, e.g. for stimulating production ({for fishing for or freeing objects E21B31/005;} for transmitting measuring-signals E21B47/14; for geophysical measurements G01V1/02)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method can include deploying a tubular string into a perforated section of a wellbore, and introducing a diverting agent into a fluid flow in an annulus surrounding the tubular string, the diverting agent blocking the fluid flow through a set of perforations in the perforated section, thereby increasing a flow rate of the fluid flow in the annulus surrounding the tubular string and advancing the tubular string through the wellbore. Another method can include deploying a tubular string into a perforated section of a wellbore, the perforated section including multiple sets of perforations, a first set of the perforations being positioned uphole of a second set of the perforations, and blocking the first set of the perforations, thereby increasing a flow rate of fluid flow in an annulus surrounding the tubular string and advancing the tubular string through the wellbore.

## Claims

### Claim 1

A method for use with a subterranean well, the method comprising:
deploying a tubular string into a perforated section of a wellbore; and
introducing a diverting agent into a fluid flow in an annulus surrounding the tubular string, the diverting agent blocking the fluid flow through a first set of perforations in the perforated section, thereby increasing a flow rate of the fluid flow in the annulus surrounding the tubular string and advancing the tubular string through the wellbore.

### Claim 2 (depends on 1)

The method of claim 1, in which the tubular string comprises at least one vibratory tool.

### Claim 3 (depends on 1)

The method of claim 1, in which the tubular string comprises multiple vibratory tools.

### Claim 4 (depends on 1)

The method of claim 1, in which the first set of the perforations blocked by the diverting agent are positioned uphole relative to a second set of the perforations that are not blocked by the diverting agent.

### Claim 5 (depends on 1)

The method of claim 1, in which the flow rate increasing comprises increasing a fluid drag force on the tubular string.

### Claim 6 (depends on 1)

The method of claim 1, in which the tubular string comprises a bottom hole assembly, and the bottom hole assembly comprises a fluid motor and a drill bit.

### Claim 7 (depends on 6)

The method of claim 6, further comprising flowing a fluid through the fluid motor and the drill bit prior to the diverting agent introducing.

### Claim 8 (depends on 6)

The method of claim 6, further comprising flowing a fluid through the fluid motor and the drill bit after the diverting agent introducing.

### Claim 9 (depends on 6)

The method of claim 6, further comprising flowing a fluid through the fluid motor and the drill bit concurrently with the advancing.

### Claim 10 (depends on 1)

The method of claim 1, further comprising, after the tubular string advancing, the diverting agent degrading in the well, thereby unblocking the first set of the perforations.

### Claim 11 (depends on 1)

The method of claim 1, further comprising, after the tubular string advancing, dislodging the diverting agent with the tubular string, thereby unblocking the first set of the perforations.

### Claim 12

A method for use with a subterranean well, the method comprising:
deploying a tubular string into a perforated section of a wellbore, the perforated section comprising first and second sets of perforations, the first set of perforations being positioned uphole of a second set of the perforations; and
blocking the first set of the perforations, thereby increasing a flow rate of fluid flow in an annulus surrounding the tubular string and advancing the tubular string through the wellbore.

### Claim 13 (depends on 12)

The method of claim 12, in which the blocking comprises introducing a diverting agent into the fluid flow.

### Claim 14 (depends on 13)

The method of claim 13, in which the diverting agent comprises multiple plugging devices.

### Claim 15 (depends on 13)

The method of claim 13, in which the diverting agent comprises a particulate diverter.

### Claim 16 (depends on 13)

The method of claim 13, further comprising, after the tubular string advancing, the diverting agent degrading in the well, thereby unblocking the first set of the perforations.

### Claim 17 (depends on 13)

The method of claim 13, further comprising, after the tubular string advancing, dislodging the diverting agent with the tubular string, thereby unblocking the first set of the perforations.

### Claim 18 (depends on 12)

The method of claim 12, in which the tubular string comprises at least one vibratory tool.

### Claim 19 (depends on 12)

The method of claim 12, in which the tubular string comprises multiple vibratory tools.

### Claim 20 (depends on 12)

The method of claim 12, in which the second set of the perforations is not blocked prior to the tubular string advancing.

### Claim 21 (depends on 12)

The method of claim 12, in which the flow rate increasing comprises increasing a fluid drag force on the tubular string.

### Claim 22 (depends on 12)

The method of claim 12, in which the tubular string comprises a bottom hole assembly, and the bottom hole assembly comprises a fluid motor and a drill bit.

### Claim 23 (depends on 22)

The method of claim 22, further comprising flowing a fluid through the fluid motor and the drill bit prior to the blocking.

### Claim 24 (depends on 22)

The method of claim 22, further comprising flowing a fluid through the fluid motor and the drill bit after the blocking.

### Claim 25 (depends on 22)

The method of claim 22, further comprising flowing a fluid through the fluid motor and the drill bit concurrently with the advancing.
